Written by students who passed Immediately available after payment Read online or as PDF Wrong document? Swap it for free 4.6 TrustPilot
logo-home
Document preview thumbnail
Preview 2 out of 13 pages
Exam (elaborations)

VA DEQ SWM INSPECTOR EXAM / COMPREHENSIVE QUESTIONS & VERIFIED ANSWERS / ACTUAL EXAM PREPARATION / 2026 TEST UPDATE / FREQUENTLY TESTED QUESTIONS & DETAILED SOLUTIONS / COMPLETE EXAM REVIEW / ALREADY GRADED / A+ PREPARATION / 100% GUARANTEED PASS /

Document preview thumbnail
Preview 2 out of 13 pages

VA DEQ SWM INSPECTOR EXAM / COMPREHENSIVE QUESTIONS & VERIFIED ANSWERS / ACTUAL EXAM PREPARATION / 2026 TEST UPDATE / FREQUENTLY TESTED QUESTIONS & DETAILED SOLUTIONS / COMPLETE EXAM REVIEW / ALREADY GRADED / A+ PREPARATION / 100% GUARANTEED PASS / NEWEST 2026 EXAM UPDATE / COMPLETE STUDY GUIDE.

Content preview

VA DEQ SWM INSPECTOR EXAM /
COMPREHENSIVE QUESTIONS & VERIFIED
ANSWERS / ACTUAL EXAM PREPARATION /
2026 TEST UPDATE / FREQUENTLY TESTED
QUESTIONS & DETAILED SOLUTIONS /
COMPLETE EXAM REVIEW / ALREADY
GRADED / A+ PREPARATION / 100%
GUARANTEED PASS / NEWEST 2026 EXAM
UPDATE / COMPLETE STUDY GUIDE.

Virginia Runoff Reduction Method- method of load calculations

load calculations based on land cover type and soil type.

what must happen to potentially harmful sheet flow runoff?

Must be diverted to stormwater conveyance system.

SWM ponds must be able to convey water safely up to what level storm event?

must be able to safely convey up to a 100 yr storm.

Define LDA

Land disturbing activity; any man-made change to the land surface that potentially changes its runoff
characteristics; includes clearing, grading, and excavation.

What size LDA must comply with stormwater management regulation? in CPBA areas?

anything of 1 acre or more, or 2500 ft^2 in CPBA areas; may be more stringent locally.

what are some activities exempt from SWM regulations?

mining, agriculture, sewer discharges, local reclamation programs, routine maintenance of preexisting
operations, public emergency activity

what term basically means a plea deal for stormwater offenders?

consent order, which replaces penalties with fines.

how long does VSMP authority have to review SWM plan?


1|Page

, 15 days to review and determine approval, and notify applicant.

How often must a VSMP authority inspect an LDA?

Periodically.

all SWPPP requirements may be met by

incorporating other plans into reference, or by developing missing elements.

What must the DEQ issue to an operator before an LDA?

a construction GP

How soon after final grade of a site must vegetation be put in place?

within 7 days.

How long must operator keep routine inspection reports?

At least 3 years after the GP expires/terminates.

How long does operator have to revise SWPPP if authority deems it necessary? How long does local
authority have to review any modifications to SWPPP?

7 days for operator to make changes, 60 days for authority to review changes.

How long does operator have to notify DEQ of an unauthorized discharge? How long does operator have
to make a written report of this?

within 24 hours of discovery for notification, within 5 days for written acknowledgement.

What constitutes a measurable rain event according to GP?

0.25 in. or more over 24 hours.

Co-located practices

During construction, a facility functions for ESC, and is later constructed into a stormwater BMP.

During construction, when should inspector make sure a BMP is not installed?

BMP should not be installed before contirbuting drainage area has been stabilized.

Notice of Termination forms, to terminate construction permits, must be sent after how many days once
conditions are met?

30 days

When is ground considered stabilized?

when vegetation is uniform, mature enough to survive, and will inhibit erosion.

How long must VSMP authority keep construction record drawings?

Until the relevant SWM facility is removed.

2|Page

Document information

Uploaded on
August 5, 2026
Number of pages
13
Written in
2026/2027
Type
Exam (elaborations)
Contains
Questions & answers
$15.99

Wrong document? Swap it for free Within 14 days of purchase and before downloading, you can choose a different document. You can simply spend the amount again.
Written by students who passed
Immediately available after payment
Read online or as PDF

Seller avatar
drjulie
1.0
(1)
Sold
11
Followers
2
Items
639
Last sold
2 months ago


Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their tests and reviewed by others who've used these notes.

Didn't get what you expected? Choose another document

No worries! You can instantly pick a different document that better fits what you're looking for.

Pay as you like, start learning right away

No subscription, no commitments. Pay the way you're used to via credit card and download your PDF document instantly.

Student with book image

“Bought, downloaded, and aced it. It really can be that simple.”

Alisha Student

Working on your references?

Create accurate citations in APA, MLA and Harvard with our free citation generator.

Working on your references?

Frequently asked questions