5 days - (ANSWER)A project schedule has been updated. The activity placement
of spread footing concrete was originally scheduled to begin as early as day 10.
The activity duration is 4 days. The actual start day was day 12. The original
schedule had calculated total float of 7 days for this activity. The recalculated
total float for the activity, when updated, would be
a. 2 days b. 5 days c. 6 days d. 9 days
Complete project per contract - (ANSWER)The purpose of retainage is to
encourage the general contractor to?
a. Submit payment request on time b. Complete project per contract
13 - (ANSWER). A 'place concrete' activity requires the placement of 2080 cubic
yards. If the individual production rate is 2 cubic yards per work hour per person,
with a 10-person crew and 8 hour workday, how many days are needed to
complete this activity?
a. 13 b. 26 c. 104 d. 130
Plan quantity divided by daily production rate - (ANSWER)What method is used
to calculate activity duration?
a. Daily production rate divided by plan quantity b. Plan quantity divided by crew
rate c. Plan quantity divided by daily production rate d. Plan quantity dived by
labor unit cost
,testing different cognitive abilities, analytical skills, and subject-specific knowledge. In this essay, we will explore the nature of exams in business, law, and mathematics, their format, and how they evaluate students’ comprehension and
application
Stuvia.com of coreMarketplace
- The concepts. We willto
alsoBuy
discuss
andthe Sell
similarities
yourandStudy
differences
Material
Contractors proposed breakdown of the project cost - (ANSWER)Which of the
following can be identified from the initial schedule of values?
a. Vendors working on the project b. Contractors proposed breakdown of the
project cost c. Profit margin of the applicant d. Quality of work in place
HVAC subcontractor and all other affected subcontractors - (ANSWER)The
architect has approved the rerouting of an HVAC through concrete slabs in a
building. To insure that activities are coordinated, a meeting should be called by
the field supervisor and the
a. HVAC subcontractor only b. HVAC subcontractor and all other subcontractors c.
HVAC subcontractor and all other affected subcontractors d. HVAC subcontractor
and the architect engineer
20.3 - (ANSWER)Concrete to be poured for 10 footings are 5 feet wide by 5 feet
long by 2 feet deep. How many cubic yards of concrete should the estimate be for
this pour, using a 10%waste factor.
a. 14.8 b. 16.3 c. 18.5 d. 20.3
Contour lines and elevations - (ANSWER)A topographical map is a drawing
showing?
a. Subsurface soil conditions b. A general profile view of the site c. Contour lines
and elevations d. Cross sections along the length of the project.
Concrete is in tension - (ANSWER)The location of reinforcing steel used in a
concrete member should be placed where?
,testing different cognitive abilities, analytical skills, and subject-specific knowledge. In this essay, we will explore the nature of exams in business, law, and mathematics, their format, and how they evaluate students’ comprehension and
application
Stuvia.com of coreMarketplace
- The concepts. We willto
alsoBuy
discuss
andthe Sell
similarities
yourandStudy
differences
Material
a. Shear is minimal b. Concrete is in tension c. Concrete is in compression d.
Center axis is located.
Notify general contractors superintend of problem - (ANSWER)The owner's rep
observed substandard drywall patches on a general contractor's renovation
project. Which of the following should be the representative's first course of
action?
a. Save items for punch list b. Notify drywall finisher of the problem c. Tell painter
not to accept patched walls. d. Notify general contractors superintend of
problem.
The contractor should request a 5-day time extension due to the rain, and should
be compensated for the 4 days compensable delay by the owner - (ANSWER)A
contract for a project contains a liquidated damages clause. The project is under
compensable delay for 4 days. In addition, rain caused another 5-day non-
compensable delay. How should the delay be handled?
a. The contractor should assume the costs of the 5-day delay less the cost owed
by the owner for the 4 day delay b. Since both delays have caused an explanation
of the completion date, contractor should be liable to the owner for the costs for
a total delay of 9 days. c. The contractor should request a 5-day time extension
due to the rain, and should be compensated for the 4 days compensable delay by
the owner d. The costs delay is overridden by the delay due to the rain. The
owner is relieved of compensable delay, and the contractor should assume the
costs of 5 days delay
Completed training card - (ANSWER)Which of the following is required for an
employee to operate a powder operated tool?
, Stuvia.com - The Marketplace to Buy and Sell your Study Material
testing different cognitive abilities, analytical skills, and subject-specific knowledge. In this essay, we will explore the nature of exams in business, law, and mathematics, their format, and how they evaluate students’ comprehension
and application of core concepts. We will also discuss the similarities and differences
a. Drivers licence b. Contract terms c. Completed training card d. Osha ten hour
card
Unknown conditions - (ANSWER)A contingency fund would be used for?
a. Unknown conditions b. Stipulated price increase c. Purchase of backup
equipment d. Concrete quantities taken from the drawings
Material suppliers - (ANSWER)The uniform construction code is an area of
a. Material suppliers b. Subcontractor services c. Federal subcontractors d.
Contract in excess of 1 million dollars
Variance in progress of the project - (ANSWER)The baseline schedule or target
should be maintained in order to analyze the?
a. Variance in progress of the project b. Float time is the current schedule c.
Critical path d. Correlative effect of the "leach"
Value engineering - (ANSWER)A project bid comes in over budget. The architect
might request proposal from some, or all of the bidders to suggest ways to reduce
costs without degrading the quality of the project. What term describes this
accurately?
a. Value engineering b. Cost engineering c. Price engineering d. Quality control
3ft - (ANSWER)A portable ladder is being set up. The distance between the
ground and the first floor is 16ft. according to OSHA, what is the minimum ladder
extension required above the area?