Written by students who passed Immediately available after payment Read online or as PDF Wrong document? Swap it for free 4.6 TrustPilot
logo-home
Document preview thumbnail
Preview 3 out of 23 pages
Exam (elaborations)

NASCLA Accredited Exam - JJ Johnson Contractor Seminar Actual Questions & Answers (Latest 2026 / 2027 Update) 100% Guarantee Pass (Verified Answers)

Document preview thumbnail
Preview 3 out of 23 pages

NASCLA Accredited Exam - JJ Johnson Contractor Seminar Actual Questions & Answers (Latest 2026 / 2027 Update) 100% Guarantee Pass (Verified Answers)

Content preview

NASCLA Accredited Exam - JJ Johnson Contractor
Seminar Actual Questions & Answers (Latest 2026
/ 2027 Update) 100% Guarantee Pass (Verified
Answers)




Terms in this set (234)



What are 4 types of Steel Decking? Composite, Roof, Cellular, and Form


What are the lengths of Full sheets of 12", 18", 24", 30", or 36". All are usually less than 40"
Steel Decking?


Who has full responsibility for Safety The prime contractor
on a construction site?

,Who is responsible to ensure The employer
workers have appropriate eye
protection?


Safety belt lanyard shall be a 1/2 inch nylon, w/ max length to provide for a fall of
minimum of? no greater than 6ft. The rope shall have a nominal
breaking strength of 5,400 lbs.


When should safety nets be When workplaces are more than 25 feet above
provided? ground or water surface or where use of ladders,
scaffolds, catch platforms, temporary floors, safety
lines, or safety belts are impractical


What are the different types of Head, Eye and Face, and Respiratory protection.
Safety Equipment? Safety belts, lifelines, lanyards, and safety nets


Where should quantities of Acceptable wooden storage and Approved metal
flammable liquid in excess of 25 storage cabinets. Cabinets shall be labeled in
gallons be stored in that is conspicuous lettering "Flammable-Keep Away from
acceptable or approved? Open Flames"


LP-Gas storage outside of buildings 1. 500 lbs or less - 0ft
for containers waiting use shall be 2. ***501 to 6,000 lbs - 10ft
located from the nearest building or 3. 6,001 to 10,000 lbs - 20ft
group of buildings in accordance to? 4. Over 10,000 lbs - 25ft


Clearance and mounting of 1. Room heater, circulating type - 12" sides, 12" rear,
temporary heating devices are? 18" chimney connector
2. ***Room heater, radiant type - 36" sides, 36" rear,
18" chimney connector

, How far shall heaters used in the 10 feet from coverings
vicinity of the combustible tarpaulins,
canvas, or similar coverings be
located from the coverings?


Material stored inside buildings 6 feet of any hoistway or inside floor openings,
under construction shall not be ***not within 10 feet of exterior wall which does not
placed with what distances? extend above the top of the material stored




Bagged materials shall be stacked 10 bags high
by stepping back the layers and
cross-keying the bags at least by
how many bags high?


Brick stacks shall not be more than? 7 feet in height


When a loose brick stack reaches a 2 inches in every foot of height above the 4-foot
height of 4 feet, it shall be tapered level
back by how many inches?


When masonry blocks are stacked Back one-half block per Tier above the 6-foot level
higher than 6 feet, the stack shall be
tapered back how far?

Document information

Uploaded on
July 31, 2026
Number of pages
23
Written in
2025/2026
Type
Exam (elaborations)
Contains
Questions & answers
$15.49

Wrong document? Swap it for free Within 14 days of purchase and before downloading, you can choose a different document. You can simply spend the amount again.
Written by students who passed
Immediately available after payment
Read online or as PDF

Seller avatar
Reputation scores are based on the amount of documents a seller has sold for a fee and the reviews they have received for those documents. There are three levels: Bronze, Silver and Gold. The better the reputation, the more your can rely on the quality of the sellers work.
ScholarSync
4.3
(18)
Sold
222
Followers
5
Items
2786
Last sold
22 minutes ago


Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their tests and reviewed by others who've used these notes.

Didn't get what you expected? Choose another document

No worries! You can instantly pick a different document that better fits what you're looking for.

Pay as you like, start learning right away

No subscription, no commitments. Pay the way you're used to via credit card and download your PDF document instantly.

Student with book image

“Bought, downloaded, and aced it. It really can be that simple.”

Alisha Student

Working on your references?

Create accurate citations in APA, MLA and Harvard with our free citation generator.

Working on your references?

Frequently asked questions