Section 1: Contracting Officer's Representative (COR) Roles and Responsibilities
Question 1: What is the primary role of a Contracting Officer's Representative
(COR) in the acquisition process?
A. To negotiate contract terms with the contractor
B. To act as the eyes and ears of the Contracting Officer
C. To sign the contract on behalf of the government
D. To approve final contractor payments without review
Correct Answer: B
Rationale: The COR is essential to efficient and effective management of
acquisitions and specifically acts as the eyes and ears of the Contracting Officer,
providing critical oversight and monitoring without having contracting authority.
Question 2: Which certification does FCR 110 specifically prepare contracting
professionals to obtain?
A. FACCOR Level III Certification
1
,B. FACCOR Level II Certification
C. FACCOR Level 1 Certification
D. Federal Contracting Officer Certification
Correct Answer: C
Rationale: FCR 110 is specifically designed to provide contracting professionals
with the basic knowledge required to perform tasks required of a FACCOR Level 1
Certification.
Question 3: Who assigns the COR specific technical duties outside of the letter of
delegation?
A. The Contracting Officer
B. The Program Manager
C. The COR Supervisor
D. The Office of Federal Procurement Policy
Correct Answer: B
Rationale: The Program Manager assigns the COR specific technical duties that
fall outside the scope of the formal letter of delegation, as the Program Manager
oversees the technical aspects of the acquisition.
2
,Question 4: A COR is managing a janitorial services contract and receives a call
from the Contractor explaining that the Government facilities manager has been
unavailable to meet with them. What should the COR do FIRST?
A. Authorize the contractor to proceed without the meeting
B. Contact the facilities manager to schedule a meeting
C. Issue a formal complaint against the facilities manager
D. Terminate the contract for convenience
Correct Answer: B
Rationale: The COR serves as a liaison between the contractor and government
personnel. The first step should be to facilitate communication by contacting the
facilities manager to resolve the scheduling issue.
Question 5: Which of the following is NOT a responsibility of a COR?
A. Monitoring contract performance
B. Inspecting deliverables
C. Awarding contracts
D. Documenting contractor performance
Correct Answer: C
Rationale: Awarding contracts is the exclusive responsibility of the Contracting
Officer, not the COR. The COR monitors performance, inspects deliverables, and
documents performance but lacks contracting authority.
3
, Question 6: What is the course length for FCR 110?
A. One day
B. Selfpaced online
C. Two weeks
D. One semester
Correct Answer: B (Note: Based on typical DAU course structure; actual length
may vary)
Rationale: FCR 110 is typically offered as a selfpaced online course through DAU,
allowing students to complete the material at their own pace.
Question 7: A COR's letter of delegation should be reviewed and updated at what
frequency?
A. Annually
B. Every six months
C. Every two years
D. Only when the contract changes
Correct Answer: A
4