In order to obtain NOI coverage under the IGP, PRDs include: - correct answers -NOI and electronic
certification by the LRP
Permit registration fee
Site Map
SWPPP
If the discharger must redact information in order to comply with federal law that addresses security in
the US, the discharger must also submit - correct answers -A written justification that the information
redaction is necessary to comply with federal law
What are three reasons for a discharger submitting an NOT in SMARTs? - correct answers --the facilities'
industrial operations have changed and are no longer subject to the IGP
-operation of the facility has been transferred to another entity
-the facility has ceased operations, completed closure activities, and removed all industrial related
pollutants
A person in which position would be eligible to be an LRP: Maintenance supervisor, QISP consultant,
Public works director, or Monitoring consultant? - correct answers -Public works director
The temporary suspension of industrial activities requires what to be uploaded in SMARTS? - correct
answers --The justification for why the monitoring is infeasible at the facility during the temporary
suspension
-The projected date that the industrial activities will resume at the facility
1
, -SWPPP revisions specifically addresses the facility stabilization BMPs
-The date the facility is fully stabilized for temporary suspension of industrial activities
Authorized NSWDs include which of the following: discharges from a broken water main in an employee
parking lot; fire hydrant testing; rinse water from industrial equipment washing, BMPs are deployed as
needed; water from landscape irrigation that runs through the facility's stockpiled materials? - correct
answers -Fire Hydrant Testing
Name four things required to be in the SWPPP? - correct answers --Storm Water Pollution Prevention
Team members
-Potential pollutant sources
-Scheduled facility operating hours
-Minimum BMPs
Which of the following must the discharger identify on the facility site map: a restroom's municipal
sanitary sewer connection; structural control measures; analytical sampling values from the previous
reporting year; each BMP implemented at the facility; spills and leaks over 42 gallons from the previous
6 year period? - correct answers -Structural control measures
A discharger that has fulfilled the requirements for the temporary suspension of industrial activities at a
facility is not required to... - correct answers -Perform sampling and analysis of storm water discharges
because the discharger has justified that it is infeasible to do so
Water Quality Based Corrective Actions can be required by which agency? - correct answers -Regional
Water Board
The IGP does not require training for the: - correct answers -LRP (Legally Responsible Person)