Written by students who passed Immediately available after payment Read online or as PDF Wrong document? Swap it for free 4.6 TrustPilot
logo-home
Document preview thumbnail
Preview 4 out of 52 pages
Exam (elaborations)

CSLB C10 Test 1 | 120 Exam Questions And Correct Answers (Verified Answers) Plus Rationales 2026/2027 Q&A | Instant Download Pdf

Document preview thumbnail
Preview 4 out of 52 pages

CSLB C10 Test 1 | 120 Exam Questions And Correct Answers (Verified Answers) Plus Rationales 2026/2027 Q&A | Instant Download Pdf

Content preview

CSLB C10 Test 1 | 120 Exam Questions And Correct Answers (Verified
Answers) Plus Rationales 2026/2027 Q&A | Instant Download Pdf


QUESTION 1: According to the National Electrical Code (NEC), what is
the maximum number of quarter bends (90-degree turns) allowed in a
single conduit run between pull points or outlet boxes?
• A) Two quarter bends (180 degrees total)
• B) Three quarter bends (270 degrees total)
• C) Four quarter bends (360 degrees total)
• D) Five quarter bends (450 degrees total)
Correct Answer: C
Rationale: The NEC limits conduit bends between pull points to a
maximum of 360 degrees total (four 90-degree equivalent quarter
bends) to allow safe wire pulling without jacket damage.
QUESTION 2: Under NEC Article 250, what is the minimum size
grounding electrode conductor (GEC) required when connecting to a
concrete-encased electrode (Ufer ground) made of reinforcing steel in a
residential service fed with 2/300 kcmil copper service-entrance
conductors?
• A) 8 AWG copper
• B) 6 AWG copper
• C) 4 AWG copper
• D) 2 AWG copper

,Correct Answer: B
Rationale: Per NEC Table 250.66, a concrete-encased electrode (Ufer
ground) is never required to be larger than 6 AWG copper, regardless of
the size of the service-entrance conductors.
QUESTION 3: In accordance with California Business and Professions
Code Section 7028, what is the penalty for a first-offense conviction of
contracting without a license in California?
• A) A written warning and mandatory compliance seminar
• B) A misdemeanor charge with a fine up to $5,000, potential
county jail time, or both
• C) A mandatory 5-year ban from ever applying for any state
business license
• D) A civil penalty of exactly $500 payable to the CSLB
Correct Answer: B
Rationale: Contracting without a license in California is a misdemeanor
under B&P Code 7028, carrying fines up to $5,000 and/or county jail
time for a first offense.
QUESTION 4: When installing Electrical Metallic Tubing (EMT), what is
the maximum distance allowed by NEC Article 358 between secure
fastenings/supports from an enclosure, cabinet, or box?
• A) Within 1 foot
• B) Within 3 feet
• C) Within 5 feet
• D) Within 10 feet

,Correct Answer: B
Rationale: NEC 358.30(A) requires EMT to be securely fastened within 3
feet of each outlet box, junction box, cabinet, or other conduit
termination, and every 10 feet thereafter.
QUESTION 5: According to NEC Chapter 9, Table 1, what is the
maximum percentage fill allowed for a conduit or tubing containing
three or more distinct electrical conductors or cables?
• A) 31%
• B) 40%
• C) 53%
• D) 60%
Correct Answer: B
Rationale: For conduits containing 3 or more conductors, the maximum
allowable cross-sectional fill percentage is 40% per NEC Chapter 9 Table
1.
QUESTION 6: What is the minimum depth required by NEC Table 300.5
for direct burial UF cable installed under a residential driveway with no
concrete slab protection?
• A) 6 inches
• B) 12 inches
• C) 18 inches
• D) 24 inches
Correct Answer: D

, Rationale: NEC Table 300.5 specifies a minimum burial depth of 24
inches for direct-burial cables passing under buildings or driveways
subjected to vehicular traffic.
QUESTION 7: Under California Contractors State License Board (CSLB)
rules, what is the current bond amount required for a C-10 Electrical
Contractor's bond?
• A) $7,500
• B) $12,500
• C) $15,000
• D) $25,000
Correct Answer: C
Rationale: The CSLB requires all active licensee classifications (including
C-10 electrical contractors) to maintain a contractor's bond in the
amount of $15,000.
QUESTION 8: In a commercial dwelling unit, GFCI protection is required
by NEC Article 210.8 for all 15- and 20-ampere, 125-volt receptacles
installed in which of the following locations?
• A) Bathrooms only
• B) Bathrooms, kitchens, and rooftops
• C) Bathrooms, kitchens, rooftops, outdoors, and within 6 feet of
the outside edge of a sink
• D) All indoor areas regardless of sink proximity
Correct Answer: C

Document information

Uploaded on
July 28, 2026
Number of pages
52
Written in
2025/2026
Type
Exam (elaborations)
Contains
Questions & answers
$19.99

Wrong document? Swap it for free Within 14 days of purchase and before downloading, you can choose a different document. You can simply spend the amount again.
Written by students who passed
Immediately available after payment
Read online or as PDF

Seller avatar
Reputation scores are based on the amount of documents a seller has sold for a fee and the reviews they have received for those documents. There are three levels: Bronze, Silver and Gold. The better the reputation, the more your can rely on the quality of the sellers work.
CreativeWrites
3.6
(21)
Sold
87
Followers
3
Items
7661
Last sold
1 day ago


Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their tests and reviewed by others who've used these notes.

Didn't get what you expected? Choose another document

No worries! You can instantly pick a different document that better fits what you're looking for.

Pay as you like, start learning right away

No subscription, no commitments. Pay the way you're used to via credit card and download your PDF document instantly.

Student with book image

“Bought, downloaded, and aced it. It really can be that simple.”

Alisha Student

Working on your references?

Create accurate citations in APA, MLA and Harvard with our free citation generator.

Working on your references?

Frequently asked questions