Written by students who passed Immediately available after payment Read online or as PDF Wrong document? Swap it for free 4.6 TrustPilot
logo-home
Document preview thumbnail
Preview 3 out of 18 pages
Exam (elaborations)

PJM PROJECT MANAGEMENT QUESTIONS AND VERIFIED ANSWERS

Document preview thumbnail
Preview 3 out of 18 pages

PJM PROJECT MANAGEMENT QUESTIONS AND VERIFIED ANSWERS

Content preview

An architect is responding to an RFP for a ground-up research laboratory located on
a wetland site. The site includes new road access and must be designed to meet local
codes and ordinances.


Which of the following subconsultants should the architect include on their project
team? Check the four that apply.
-Environmental engineer
-MEP engineer
-Construction manager
-Civil engineer
-Landscape architect
-Site surveyor


Give this one a try later!

, -Environmental engineer
-MEP engineer
-Civil engineer
-Landscape architect

Explanation: Because the project will be located in a wetland and will
require expertise in evaluating and designing for this type of environment.
Because a laboratory building will require specialty expertise in
mechanical, electrical, and plumbing. Because the project is located in a
wetland and will require expertise in how to bring road and infrastructure
to the site.Because the site around the building must be landscaped to
meet local codes and ordinances.

Topic: Resource Management




Early in the construction document phase of a building renovation project, a
mechanical engineer alerts the project manager that the architect has improperly
classified the use of the space. The architect will need to revise the use of the space
so that the mechanical engineer can correctly size a large portion of the HVAC
system and revise the distribution duct layout.


What should the architect do first to address the improper classification?
a)Submit a request for additional services.
b)Take corrective actions to modify the project work plan.
c)Identify the impact on the previous construction cost estimate.
d)Advise the owner of the design conditions and their impact on the schedule.


Give this one a try later!

, b) take corrective actions to modify the project work plan.

Explanation: Taking corrective action if a project is not performing
according to the project work plan is the first step the architect should take.
The architect should identify the root cause for the error and define a path
forward to resolving it prior to discussion with the owner.

Topic: Project Work Planning




An architect hires a structural engineer consultant for a new condominium project.
Five days before the design document drawings are due, the owner requests that a
rooftop garden and patio be included in the project. The structural engineer sends an
e-mail to the architect, requesting additional time and compensation for the
incorporation of the new roof modifications.


If an e-mail is an approved form of documentation according to the consultant
contract, what action should the architect take?


a)Forward the e-mail request with a description to the owner for review and approval.
b)Attach the e-mail to the owner's design document deliverables and invoice for
payment.
c)Reply to the e-mail asking the engineer to send their request to the architect in the
form of a letter.


Give this one a try later!

Document information

Uploaded on
July 28, 2026
Number of pages
18
Written in
2025/2026
Type
Exam (elaborations)
Contains
Questions & answers
$10.50

Wrong document? Swap it for free Within 14 days of purchase and before downloading, you can choose a different document. You can simply spend the amount again.
Written by students who passed
Immediately available after payment
Read online or as PDF

Seller avatar
Reputation scores are based on the amount of documents a seller has sold for a fee and the reviews they have received for those documents. There are three levels: Bronze, Silver and Gold. The better the reputation, the more your can rely on the quality of the sellers work.
BestKey
4.3
(116)
Sold
278
Followers
108
Items
8363
Last sold
1 week ago



Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their tests and reviewed by others who've used these notes.

Didn't get what you expected? Choose another document

No worries! You can instantly pick a different document that better fits what you're looking for.

Pay as you like, start learning right away

No subscription, no commitments. Pay the way you're used to via credit card and download your PDF document instantly.

Student with book image

“Bought, downloaded, and aced it. It really can be that simple.”

Alisha Student

Working on your references?

Create accurate citations in APA, MLA and Harvard with our free citation generator.

Working on your references?

Frequently asked questions