appliance The IFGC covers gas piping from the point of
delivery to the outlet of the shutoff valves.
(Section 101.2.2 Piping Systems)
this code Where conflicts occur between the provisions of
this code and the referenced standards, the
(Section 102.8.1 Provisions in provisions of the __________ ____________ shall apply.
referenced codes and standards)
modifications (Section 105.1 Whenever there are practical difficulties involved
Modifications) in carrying out the provisions of this code, the
code official shall have the authority to grant
__________ for individual cases.
,in writing, Where the code official finds that a proposed
reason for disapproval alternative material does not comply with the
intent of the code provisions, the code official
(Section 105.2 Alternative materials, shall respond __________ __________ stating the __________
design and methods of __________ _________.
construction and equipment.)
next working Where appliance and equipment replacements
and repairs are required to be performed in an
(section 106.1 Where required, emergency situation, the permit application shall
Exception) be submitted within the _________ ___________ business
day of Department of Inspection.
portable Permits shall not be required for any _________
heating appliance.
(Section 106.2. Permits not required,
Item 1.)
permit The application, construction documents and
other data filed by an applicant for a __________ shall
(Section 106.5 Permit issuance) be reviewed by the code official.
180 Every permit issued by the code official under
the provisions of this code shall expire by
(Section 106.5.3 Expiration, Section limitation and become null and void if the work
106.5.4 Extensions) authorized is not commenced within _____ days.
180 One set of approved construction documents
shall be retained by the code official for a period
(Section 107.2 Retention of of not less than _____ days from the date of
construction documents) completion of the permitted work, or as required
by state or local laws.
, inspection, Construction or work for which a permit is
inspection required shall be subject to _________ by the code
official, and such construction or work shall
(Section 112.1 General) remain visible and able to be accessed for
__________ purposes until approved.
authorized A person shall not make connections from a
utility, source of energy, fuel or power to any
(Section 110.1 Connection of service building or system that is regulated by this code
utilities) for which a permit is required until __________ by the
code official.
Appliance Any apparatus or device that utilizes a fuel or a
raw material as a fuel to produce light, heat,
(Section 202 General definitions) power, refrigeration or air conditioning.
Atmospheric Pressure The pressure of the weight of air and water vapor
on the surface of the earth, approximately 14.7
(Section 202 General definitions) pounds per square inch at sea level.
Boiler, Low-Pressure A self-contained appliance for supplying steam
or hot water.
(Section 202 General definitions)
BTU Abbreviation for British thermal unit, which is the
quantity of heat required to raise the temperature
(Section 202 General definitions) of 1 pound of water to 1°F.
EXAM WITH CORRECT ACTUAL QUESTIONS
AND CORRECTLY WELL DEFINED ANSWERS
LATEST ALREADY GRADED A+
Terms in this set (171)
appliance The IFGC covers gas piping from the point of
delivery to the outlet of the shutoff valves.
(Section 101.2.2 Piping Systems)
this code Where conflicts occur between the provisions of
this code and the referenced standards, the
(Section 102.8.1 Provisions in provisions of the __________ ____________ shall apply.
referenced codes and standards)
modifications (Section 105.1 Whenever there are practical difficulties involved
Modifications) in carrying out the provisions of this code, the
code official shall have the authority to grant
__________ for individual cases.
,in writing, Where the code official finds that a proposed
reason for disapproval alternative material does not comply with the
intent of the code provisions, the code official
(Section 105.2 Alternative materials, shall respond __________ __________ stating the __________
design and methods of __________ _________.
construction and equipment.)
next working Where appliance and equipment replacements
and repairs are required to be performed in an
(section 106.1 Where required, emergency situation, the permit application shall
Exception) be submitted within the _________ ___________ business
day of Department of Inspection.
portable Permits shall not be required for any _________
heating appliance.
(Section 106.2. Permits not required,
Item 1.)
permit The application, construction documents and
other data filed by an applicant for a __________ shall
(Section 106.5 Permit issuance) be reviewed by the code official.
180 Every permit issued by the code official under
the provisions of this code shall expire by
(Section 106.5.3 Expiration, Section limitation and become null and void if the work
106.5.4 Extensions) authorized is not commenced within _____ days.
180 One set of approved construction documents
shall be retained by the code official for a period
(Section 107.2 Retention of of not less than _____ days from the date of
construction documents) completion of the permitted work, or as required
by state or local laws.
, inspection, Construction or work for which a permit is
inspection required shall be subject to _________ by the code
official, and such construction or work shall
(Section 112.1 General) remain visible and able to be accessed for
__________ purposes until approved.
authorized A person shall not make connections from a
utility, source of energy, fuel or power to any
(Section 110.1 Connection of service building or system that is regulated by this code
utilities) for which a permit is required until __________ by the
code official.
Appliance Any apparatus or device that utilizes a fuel or a
raw material as a fuel to produce light, heat,
(Section 202 General definitions) power, refrigeration or air conditioning.
Atmospheric Pressure The pressure of the weight of air and water vapor
on the surface of the earth, approximately 14.7
(Section 202 General definitions) pounds per square inch at sea level.
Boiler, Low-Pressure A self-contained appliance for supplying steam
or hot water.
(Section 202 General definitions)
BTU Abbreviation for British thermal unit, which is the
quantity of heat required to raise the temperature
(Section 202 General definitions) of 1 pound of water to 1°F.