Written by students who passed Immediately available after payment Read online or as PDF Wrong document? Swap it for free 4.6 TrustPilot
logo-home
Document preview thumbnail
Preview 3 out of 29 pages
Exam (elaborations)

VA DEQ SWM INSPECTOR ACTUAL EXAM PREP 2026 ALL QUESTIONS AND CORRECT DETAILED ANSWERS ALREADY A GRADED WITH EXPERT FEEDBACK |NEW AND REVISED

Document preview thumbnail
Preview 3 out of 29 pages

VA DEQ SWM INSPECTOR ACTUAL EXAM PREP 2026 ALL QUESTIONS AND CORRECT DETAILED ANSWERS ALREADY A GRADED WITH EXPERT FEEDBACK |NEW AND REVISED

Content preview

1|P a g e



VA DEQ SWM INSPECTOR ACTUAL EXAM
PREP 2026 ALL QUESTIONS AND CORRECT
DETAILED ANSWERS ALREADY A GRADED
WITH EXPERT FEEDBACK |NEW AND
REVISED

The Virginia Stormwater Management Program is authorized by the
______ and administered through the ______ - ANSWER- Virginia
Stormwater Management Act, Virginia Stormwater Management
Program Regulation


A locality VSMP authority must include enforcement authority and a
schedule of civil penalties for enforcement actions in its local ordinance.
The maximum penalty the authority may issue is - ANSWER- $32,500
per violation per day


Any civil penalty assessed by a court as a result of a summons issued by
a locality VSMP authority must be paid - ANSWER- into the locality's
treasury


Any person who violates..... shall be subject to a civil penalty not to
exceed - ANSWER- $32, 500


Chesapeake Bay Preservation Areas that result in a land disturbance
greater than or equal to ____ and less than ____ - ANSWER- 2,500 ft^2,
1 acre

,2|P a g e




CBPA LDAs must have - ANSWER- approved E&SC plan, approved
SWM plan, local approval to start land disturbance, long-term
maintenance agreement, construction record drawings


CBPA LDAs do not require - ANSWER- Construction GP, Pollution
prevention Plan, Additional control measures to address TMDL


State entities and linear projects ___ submit a single set of standards and
specifications to DEQ for approval, federal entities ____ - ANSWER-
must, may


Name the 5 steps in order of the permitting process - ANSWER-
submittal of ESC plans and SWM plans, SWM plan review and
approval, registration statement entry into Construction GP,
Construction GP approved by DEQ, Locality VSMP authority approval
to start land disturbance


The locality VSMP authority has ___ days to determine the
completeness of a stormwater management plan and to notify the
applicant of its determination - ANSWER- 15


If the plan is complete and the applicant has been notified within 15 days
of submission, the locality VSMP authority (plan reviewer) has ___ days
from the time of notification to review the plan - ANSWER- 60

, 3|P a g e


Operators of a single-family detached residential structures that disturb
equal to or greater than one acre of land are - ANSWER- not required to
submit a registration statement


VSMP authority must keep project records, including approved SWM
plans and registration statements, for ___ years after state permit
termination or project completion - ANSWER- 3 years


VSMP authority must keep post construction stormwater management
facility inspection records for __ years from the date of inspection -
ANSWER- 5


DEQ is required to conduct a program review once every - ANSWER- 5
years


A locality VSMP must be at least as stringent as what state permit? -
ANSWER- Construction GP


What plans must a locality's ordinance require to be submitted and
approved? - ANSWER- ESC plan, SWM plan


The Construction GP includes ___ different inspection frequencies -
ANSWER- 2


SWPPP inspection schedule if discharging to impaired waters -
ANSWER- at least once every 4 business days or at least once every 5

Document information

Uploaded on
July 27, 2026
Number of pages
29
Written in
2025/2026
Type
Exam (elaborations)
Contains
Questions & answers
$23.49

Wrong document? Swap it for free Within 14 days of purchase and before downloading, you can choose a different document. You can simply spend the amount again.
Written by students who passed
Immediately available after payment
Read online or as PDF

Seller avatar
Reputation scores are based on the amount of documents a seller has sold for a fee and the reviews they have received for those documents. There are three levels: Bronze, Silver and Gold. The better the reputation, the more your can rely on the quality of the sellers work.
impressivetutor
4.8
(1821)
Sold
663
Followers
377
Items
3729
Last sold
4 hours ago


Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their tests and reviewed by others who've used these notes.

Didn't get what you expected? Choose another document

No worries! You can instantly pick a different document that better fits what you're looking for.

Pay as you like, start learning right away

No subscription, no commitments. Pay the way you're used to via credit card and download your PDF document instantly.

Student with book image

“Bought, downloaded, and aced it. It really can be that simple.”

Alisha Student

Working on your references?

Create accurate citations in APA, MLA and Harvard with our free citation generator.

Working on your references?

Frequently asked questions