CESSWI PART 2 EXAM ACTUAL TEST PAPER QUESTIONS CORRECT ANSWERS GRADED
A PLUS
CESSWI Part 2 EXAM Questions and Answers
Verified Solutions Latest Update 2026/2027
Question:
Existing Veg, Objectives
Answer:
1) Site Plan and Mang 2) Erosi Cont 3) Sedi Cont 4) Post-Cons Mang
Question:
Existing Veg, applic
Answer:
1) Areas within site where no const activity is occur 2) Areas where local, state and fed govt require
preservation 3) Areas where existing veg can be utilized for eros, sedi, and storm water quality.
Question:
Existing veg: inspection
Answer:
1) Accord to regu timetables 2) erosi and damage veg 3) sufficient moisture to ensure growth 4) veg
is well stab 5) adequate cover 6) debris and litter 7) invasive exotics
Question:
Existing veg: maint
Answer:
1) only disturb area for construct 2)irrigate dry seasons 3) remove see, and replant if need be 4)
replant or rework buffer strips 5) mow and cut perennial weeds 6) remove all trash and debri 7) treat
invasive and noxious species
,Question:
Sched/Sequ, purp/descrip
Answer:
Temp, procedural control that involves creating a written plan to address neck bmps and sequencing
of construct activities to mitigate the erosive effects of wind,water and construct activities.
Question:
Sched/Sequ: object
Answer:
1) site planning & management 2) erosion control 3) sediment control
Question:
Sched/Sequ: applications
Answer:
1) develop timetables for certain activities, paretic during rainy season
Question:
Sched/Sequ: inspect
Answer:
1) inclusion of sched/seq as a bmp in the plan 2) ached site activities mirroring ached activites.
Question:
Sched/Sequ: maintanence
Answer:
1) modify ached of active when changes are warranted 2) modify ached of active prior to rainy
season to reflect updated bmp info
,Question:
Hydroseed: Des& purp
Answer:
Temp or perm bmp designed to reduce erosion and runoff by applying mix of seed, fert and
stabilizing emulsion.
Question:
Hydroseed: object
Answer:
1) erosion control 2) good housekeeping/ materials management 3) post construct management
Question:
Hydroseed: targeted pollut
Answer:
1) sediment 2) nutrients 3) metals 4) ph
Question:
Hydroseed: imp consid
Answer:
1) need adequate moisture 2) additional mulch may be added 3) pretreatment where cover is not met
4) apply from multi angles to avoid shadowing
Question:
Hydroseed: limitations
Answer:
1) seed mix approp for seasonal conditions 2) time of application per seasonal conditions 3) difficult
on steep slopes 4) no pedestrian or vehicle traffic 5) avoid high winds
, Question:
Hydroseed: inspect:
Answer:
1) adequate coverage of diet areas 2) signs of pedest or vehicle traffic 3) signs of animal activity 4)
check seed mix for correct type and application rate
Question:
Hydroseed: Maint
Answer:
1) reapply in areas needing more cover 2) insure proper moisture 3) maintain unbroken coverage
through out project 4) require repair due to traffic or animals
Question:
Hydroseed: potentailly assoc bmps
Answer:
1) hydromulch 2) seeding 3) mulching 4) temp stabi 5) tackifiers
Question:
RCP: descript and purp
Answer:
temp or perm erosion control blankets that act as soils stabilization devices to protect diet areas from
erosions.
Question:
RCP: object
Answer:
1) erosion control 2) runoff control 3) post construct
A PLUS
CESSWI Part 2 EXAM Questions and Answers
Verified Solutions Latest Update 2026/2027
Question:
Existing Veg, Objectives
Answer:
1) Site Plan and Mang 2) Erosi Cont 3) Sedi Cont 4) Post-Cons Mang
Question:
Existing Veg, applic
Answer:
1) Areas within site where no const activity is occur 2) Areas where local, state and fed govt require
preservation 3) Areas where existing veg can be utilized for eros, sedi, and storm water quality.
Question:
Existing veg: inspection
Answer:
1) Accord to regu timetables 2) erosi and damage veg 3) sufficient moisture to ensure growth 4) veg
is well stab 5) adequate cover 6) debris and litter 7) invasive exotics
Question:
Existing veg: maint
Answer:
1) only disturb area for construct 2)irrigate dry seasons 3) remove see, and replant if need be 4)
replant or rework buffer strips 5) mow and cut perennial weeds 6) remove all trash and debri 7) treat
invasive and noxious species
,Question:
Sched/Sequ, purp/descrip
Answer:
Temp, procedural control that involves creating a written plan to address neck bmps and sequencing
of construct activities to mitigate the erosive effects of wind,water and construct activities.
Question:
Sched/Sequ: object
Answer:
1) site planning & management 2) erosion control 3) sediment control
Question:
Sched/Sequ: applications
Answer:
1) develop timetables for certain activities, paretic during rainy season
Question:
Sched/Sequ: inspect
Answer:
1) inclusion of sched/seq as a bmp in the plan 2) ached site activities mirroring ached activites.
Question:
Sched/Sequ: maintanence
Answer:
1) modify ached of active when changes are warranted 2) modify ached of active prior to rainy
season to reflect updated bmp info
,Question:
Hydroseed: Des& purp
Answer:
Temp or perm bmp designed to reduce erosion and runoff by applying mix of seed, fert and
stabilizing emulsion.
Question:
Hydroseed: object
Answer:
1) erosion control 2) good housekeeping/ materials management 3) post construct management
Question:
Hydroseed: targeted pollut
Answer:
1) sediment 2) nutrients 3) metals 4) ph
Question:
Hydroseed: imp consid
Answer:
1) need adequate moisture 2) additional mulch may be added 3) pretreatment where cover is not met
4) apply from multi angles to avoid shadowing
Question:
Hydroseed: limitations
Answer:
1) seed mix approp for seasonal conditions 2) time of application per seasonal conditions 3) difficult
on steep slopes 4) no pedestrian or vehicle traffic 5) avoid high winds
, Question:
Hydroseed: inspect:
Answer:
1) adequate coverage of diet areas 2) signs of pedest or vehicle traffic 3) signs of animal activity 4)
check seed mix for correct type and application rate
Question:
Hydroseed: Maint
Answer:
1) reapply in areas needing more cover 2) insure proper moisture 3) maintain unbroken coverage
through out project 4) require repair due to traffic or animals
Question:
Hydroseed: potentailly assoc bmps
Answer:
1) hydromulch 2) seeding 3) mulching 4) temp stabi 5) tackifiers
Question:
RCP: descript and purp
Answer:
temp or perm erosion control blankets that act as soils stabilization devices to protect diet areas from
erosions.
Question:
RCP: object
Answer:
1) erosion control 2) runoff control 3) post construct