Written by students who passed Immediately available after payment Read online or as PDF Wrong document? Swap it for free 4.6 TrustPilot
logo-home
Document preview thumbnail
Preview 2 out of 9 pages
Exam (elaborations)

CADE FINAL EXAM REVIEW WALMART STORMWATER MANAGEMENT QUESTIONS WITH CORRECT ANSWERS LATEST UPDATE

Document preview thumbnail
Preview 2 out of 9 pages

CADE FINAL EXAM REVIEW WALMART STORMWATER MANAGEMENT QUESTIONS WITH CORRECT ANSWERS LATEST UPDATE

Content preview

CADE FINAL EXAM REVIEW WALMART
STORMWATER MANAGEMENT QUESTIONS
WITH CORRECT ANSWERS LATEST 2025-2026
UPDATE




The Clean Water Act - Answer-The 1970s federal law that set into place
the regulation of stormwater.


NPDES - Answer-Requirements for managing storm water activity on a
construction site.


The Notice of Termination (NOT) can be filed when - Answer-All
construction activity (inside and outside) is complete and permanent
stabilization has been verified as adequate to meet permit requirements.


All of the following must occur before construction starts, except:
1. Prepare the SWPPP
2. Determine the Operator(s)
3. Submit the Notice of Intent (NOI)
4. Submit the Notice of Termination (NOT) - Answer-4. Submit the
Notice of Termination (NOT).

, Which of the following is NOT a beneficial use of water?
1. Swimming
2. Drinking
3. Flushing a spill down a storm drain
4. Industrial and agricultural water supply - Answer-3. Flushing a spill
down a storm drain.


When installing and maintaining a check dam, make sure:
1. Stormwater is directed around the check dam
2. Void spaces are filled with sediment
3. The low point (overflow) of the check dam is in the middle of the
channel
4. The high point of the check dam is in the middle of the channel -
Answer-3. The low point (overflow) of the check dam is in the middle of
the channel.


To reduce the possibility of undercutting in channels, you should:
1. Stabilize diversions and swales within 21-days of construction
2. Add mulch and straw
3. Install filter fabric under rock and similar materials placed within the
stormwater conveyance

Document information

Uploaded on
July 27, 2026
Number of pages
9
Written in
2025/2026
Type
Exam (elaborations)
Contains
Questions & answers
$22.79

Wrong document? Swap it for free Within 14 days of purchase and before downloading, you can choose a different document. You can simply spend the amount again.
Written by students who passed
Immediately available after payment
Read online or as PDF

Seller avatar
Reputation scores are based on the amount of documents a seller has sold for a fee and the reviews they have received for those documents. There are three levels: Bronze, Silver and Gold. The better the reputation, the more your can rely on the quality of the sellers work.
AtiExitseller
3.8
(9)
Sold
68
Followers
0
Items
1784
Last sold
1 week ago


Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their tests and reviewed by others who've used these notes.

Didn't get what you expected? Choose another document

No worries! You can instantly pick a different document that better fits what you're looking for.

Pay as you like, start learning right away

No subscription, no commitments. Pay the way you're used to via credit card and download your PDF document instantly.

Student with book image

“Bought, downloaded, and aced it. It really can be that simple.”

Alisha Student

Working on your references?

Create accurate citations in APA, MLA and Harvard with our free citation generator.

Working on your references?

Frequently asked questions