Written by students who passed Immediately available after payment Read online or as PDF Wrong document? Swap it for free 4.6 TrustPilot
logo-home
Document preview thumbnail
Preview 2 out of 14 pages
Exam (elaborations)

FIN 451 EXAM 1_95 QUESTIONS WITH VERIFIED ANSWERS,100%CORRECT

Document preview thumbnail
Preview 2 out of 14 pages

FIN 451 EXAM 1_95 QUESTIONS WITH VERIFIED ANSWERS False - CORRECT ANSWER T/F If price is part of the final selection criteria and the price is the totla cost of construction is not 100% the final and sole selection criteria, then delivery method is Best Value: Total Cost True - CORRECT ANSWER T/F Some industry participants use the term contract type to mean the basis of reimbursement and others use the term to refer to the project delivery method. True - CORRECT ANSWER T/F Basic philosophy of lean construction is centered on the idea of eliminating waste. Low Bid - CORRECT ANSWER Which Procurement option is defined as "competition where price is a factor in the final selection criteria?" Target Price or estimated maximum price - CORRECT ANSWER What basis of reimbursement typically used with IPD? QBS - CORRECT ANSWER Which procurement method is typically used when selecting an Agent Cm firm? True - CORRECT ANSWER T/F Agency CM firms may coordinate, receive, and award trade bids and proposals for the owner. False - CORRECT ANSWER T/F Surety bonds such as payment bonds and performance bonds in the const. industry are considered to be the same as insurance

Content preview

FIN 451 EXAM 1_95 QUESTIONS WITH VERIFIED
ANSWERS
False - CORRECT ANSWER T/F If price is part of the final selection criteria and the
price is the totla cost of construction is not 100% the final and sole selection
criteria, then delivery method is Best Value: Total Cost


True - CORRECT ANSWER T/F Some industry participants use the term contract
type to mean the basis of reimbursement and others use the term to refer to the
project delivery method.


True - CORRECT ANSWER T/F Basic philosophy of lean construction is centered on
the idea of eliminating waste.


Low Bid - CORRECT ANSWER Which Procurement option is defined as
"competition where price is a factor in the final selection criteria?"


Target Price or estimated maximum price - CORRECT ANSWER What basis of
reimbursement typically used with IPD?


QBS - CORRECT ANSWER Which procurement method is typically used when
selecting an Agent Cm firm?


True - CORRECT ANSWER T/F Agency CM firms may coordinate, receive, and award
trade bids and proposals for the owner.

, False - CORRECT ANSWER T/F Surety bonds such as payment bonds and
performance bonds in the const. industry are considered to be the same as
insurance


True - CORRECT ANSWER T/F Case evaluation involves a neutral third party or
facilitator that is not empowered to make a decision on the dispute


-May be used in DBB
-May be used in DB
May be used when selecting designer/constructor
- One process for procurement, RFQ/RFP, has it built into the processs
-May be used with IPD
-May be used w/ CM at risk - CORRECT ANSWER Which statement(s) are true
regarding prequalifications?


False - CORRECT ANSWER T/F Lump Sum of Fixed Firm Price are generally open-
book with the owner having access to the contractor's or design-builder's cost
related info


- Locating temp. facilities for project team members
- Identifying and facilitating long lead item orders
- Coordinate, receive and award trade bids and proposals
- Help Owner obtain permits and gov. approvals
- Help owner obtain consultants - CORRECT ANSWER Which of the following
services may be provided by an Agent CM firm?

Document information

Uploaded on
July 26, 2026
Number of pages
14
Written in
2025/2026
Type
Exam (elaborations)
Contains
Questions & answers
$16.49

Wrong document? Swap it for free Within 14 days of purchase and before downloading, you can choose a different document. You can simply spend the amount again.
Written by students who passed
Immediately available after payment
Read online or as PDF

Seller avatar
Reputation scores are based on the amount of documents a seller has sold for a fee and the reviews they have received for those documents. There are three levels: Bronze, Silver and Gold. The better the reputation, the more your can rely on the quality of the sellers work.
paulhans
3.5
(136)
Sold
796
Followers
641
Items
7840
Last sold
6 days ago


Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their tests and reviewed by others who've used these notes.

Didn't get what you expected? Choose another document

No worries! You can instantly pick a different document that better fits what you're looking for.

Pay as you like, start learning right away

No subscription, no commitments. Pay the way you're used to via credit card and download your PDF document instantly.

Student with book image

“Bought, downloaded, and aced it. It really can be that simple.”

Alisha Student

Working on your references?

Create accurate citations in APA, MLA and Harvard with our free citation generator.

Working on your references?

Frequently asked questions