Q1. What does ACG stand for? ANSWER Associated Air Balance Council
Commissioning Group.
Q2. What does CxA stand for? ANSWER Certified Commissioning
Authority.
Q3. What is the primary role of the CxA? ANSWER To lead, plan,
coordinate, and manage commissioning teams on behalf of the building
owner.
Q4. What is commissioning? ANSWER A quality-oriented process for
achieving, verifying, and documenting that the performance of facilities,
systems, and assemblies meets defined objectives and criteri ANSWER
Q5. What does OPR stand for? ANSWER Owner's Project
Requirements.
Q6. What does BOD stand for? ANSWER Basis of Design.
Q7. What does CFR stand for? ANSWER Current Facility Requirements
(used in Existing Building Commissioning).
Q8. What is the purpose of the OPR? ANSWER To document the
owner's functional requirements for the facility, systems, and equipment.
Q9. Who develops the OPR? ANSWER The owner, with assistance from
the design team and Cx ANSWER
Q10. What is the Basis of Design (BOD)? ANSWER A document that
records the concepts, calculations, decisions, and product selections used
to meet the OPR.
Q11. What standard defines the commissioning process for
buildings? ANSWER ASHRAE Guideline 0-2013, The Commissioning
Process.

,Q12. What is ASHRAE Standard 202-2013? ANSWER Commissioning
Process for Buildings and Systems — a normative standard for
commissioning.
Q13. What is ASHRAE Guideline 1.1-2007? ANSWER HVAC&R
Technical Requirements for the Commissioning Process.
Q14. What is re-commissioning? ANSWER Commissioning of a building
or system that was previously commissioned.
Q15. What is retro-commissioning? ANSWER The application of the
commissioning process to existing buildings that were not previously
commissioned.
Q16. What is ongoing commissioning? ANSWER A continuous process
of monitoring, analyzing, and optimizing building performance after
occupancy.
Q17. What is the difference between CxA and CxP? ANSWER CxA
(Commissioning Authority) is ACG's term; CxP (Commissioning Provider)
is BCxA's term. Both refer to the commissioning leader.
Q18. What is the CxA's relationship to the owner? ANSWER The CxA
is an independent agent working on behalf of the owner.
Q19. Can a CxA work for a contractor or manufacturer? ANSWER No
— ACG requires CxAs to be independent of general contractors, installing
contractors, and equipment manufacturers.
Q20. What is the Better Buildings Workforce Guidelines (BBWG)?
ANSWER A U.S. DOE program that developed certification schemes for
building commissioning professionals.
Q21. Is the CxA certification ANAB-accredited? ANSWER Yes.
Q22. Is the CxA exam open book or closed book? ANSWER Closed
book.
Q23. How many questions are on the CxA exam? ANSWER 125
multiple-choice questions (as of the 2026 Candidate Handbook).
Q24. How long is the CxA exam? ANSWER 4 hours and 15 minutes,
plus a 10-minute break.
Q25. What calculator is permitted during the CxA exam? ANSWER A
scientific, non-programmable calculator.

, SECTION 2: MANAGING COMMISSIONING PROJECTS (Q26–Q70)
Q26. What percentage of the CxA exam covers Managing
Commissioning Projects? ANSWER 18%.
Q27. What is the CxA's role during project kickoff? ANSWER To
facilitate the commissioning kickoff meeting, establish communication
protocols, and review the commissioning scope with the team.
Q28. What should be included in a commissioning kickoff meeting
agenda? ANSWER Roles and responsibilities, communication plan,
schedule, OPR review, and issue resolution process.
Q29. What is a commissioning scope of work? ANSWER A document
defining the systems to be commissioned, the commissioning activities to
be performed, and the deliverables.
Q30. Who approves the commissioning scope? ANSWER The owner.
Q31. What is the CxA's responsibility regarding the project budget?
ANSWER To manage the commissioning budget and report any variances
to the owner.
Q32. What is a commissioning schedule? ANSWER A schedule that
integrates commissioning activities with the overall construction
schedule.
Q33. When should the commissioning schedule be developed?
ANSWER During the pre-design or early design phase.
Q34. What is a risk assessment in commissioning? ANSWER An
evaluation of potential risks to the commissioning process and
development of mitigation strategies.
Q35. What is the CxA's role in risk assessment? ANSWER To identify
risks that could affect system performance verification and recommend
mitigation.
Q36. What is stakeholder reporting? ANSWER Regular communication
to the owner and project team about commissioning progress, issues, and
status.
Q37. How often should the CxA issue commissioning status reports?
ANSWER Typically monthly or as defined in the commissioning plan.

Document information

Uploaded on
July 26, 2026
Number of pages
24
Written in
2025/2026
Type
Exam (elaborations)
Contains
Questions & answers
$16.49

Wrong document? Swap it for free Within 14 days of purchase and before downloading, you can choose a different document. You can simply spend the amount again.
Written by students who passed
Immediately available after payment
Read online or as PDF

Seller avatar
Reputation scores are based on the amount of documents a seller has sold for a fee and the reviews they have received for those documents. There are three levels: Bronze, Silver and Gold. The better the reputation, the more your can rely on the quality of the sellers work.
luzlinkuz
3.8
(323)
Sold
1575
Followers
852
Items
31538
Last sold
14 hours ago



Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their tests and reviewed by others who've used these notes.

Didn't get what you expected? Choose another document

No worries! You can instantly pick a different document that better fits what you're looking for.

Pay as you like, start learning right away

No subscription, no commitments. Pay the way you're used to via credit card and download your PDF document instantly.

Student with book image

“Bought, downloaded, and aced it. It really can be that simple.”

Alisha Student

Working on your references?

Create accurate citations in APA, MLA and Harvard with our free citation generator.

Working on your references?

Frequently asked questions