Setting quality standards, scheduling inspections, and managing any required re-work are
processes that are parts of _________? ✔Correct Answer-Quality Management
What type of document would contain information on the type of project, size of project,
location of project, bid due date, start and completion date, bond requirements, document
location, and legal requirements? ✔Correct Answer-Invitation to Bid
What types of drawings (which reflect the modifications made by change orders) are given to
the owner by the contractor at the project close-out? ✔Correct Answer-As-built drawings
When estimating a job, what is typically the riskiest part of the estimation? ✔Correct Answer-
Labor Productivity
The form used to clarify information shown in the documents. Completed and filed by
contractor, then sent to the design team for answers/clarification. ✔Correct Answer-Request
for Information (RFI)
Color charts, drawings, cut sheets, fabrication drawings, samples, mockups and shop drawings
provided in the final design phase are examples of? ✔Correct Answer-Submittals
What type of submittal is used to verify that the project materials meet contract specifications?
✔Correct Answer-Product data sheets
the process of containing construction costs within the budget established by the cost estimate.
✔Correct Answer-Cost control
Work that is completed by the general contractor with its own skilled labor force ✔Correct
Answer-Self-performed work
The most common method of compensating the contractor for the work completed.
✔Correct Answer-Lump-sum contract
Ultimately, the person responsible for implementing time and schedule control, cost control,
and quality control during the project. They also conduct business with the owner's
representative and the architect's project manager. ✔Correct Answer-Project Manager
The person is a typically at the jobsite full-time and is responsible for the correct, timely, and
profitable construction of the project. They understand common construction methods and
practices. ✔Correct Answer-Superintendent
|Latest Update |Guaranteed to Pass
Setting quality standards, scheduling inspections, and managing any required re-work are
processes that are parts of _________? ✔Correct Answer-Quality Management
What type of document would contain information on the type of project, size of project,
location of project, bid due date, start and completion date, bond requirements, document
location, and legal requirements? ✔Correct Answer-Invitation to Bid
What types of drawings (which reflect the modifications made by change orders) are given to
the owner by the contractor at the project close-out? ✔Correct Answer-As-built drawings
When estimating a job, what is typically the riskiest part of the estimation? ✔Correct Answer-
Labor Productivity
The form used to clarify information shown in the documents. Completed and filed by
contractor, then sent to the design team for answers/clarification. ✔Correct Answer-Request
for Information (RFI)
Color charts, drawings, cut sheets, fabrication drawings, samples, mockups and shop drawings
provided in the final design phase are examples of? ✔Correct Answer-Submittals
What type of submittal is used to verify that the project materials meet contract specifications?
✔Correct Answer-Product data sheets
the process of containing construction costs within the budget established by the cost estimate.
✔Correct Answer-Cost control
Work that is completed by the general contractor with its own skilled labor force ✔Correct
Answer-Self-performed work
The most common method of compensating the contractor for the work completed.
✔Correct Answer-Lump-sum contract
Ultimately, the person responsible for implementing time and schedule control, cost control,
and quality control during the project. They also conduct business with the owner's
representative and the architect's project manager. ✔Correct Answer-Project Manager
The person is a typically at the jobsite full-time and is responsible for the correct, timely, and
profitable construction of the project. They understand common construction methods and
practices. ✔Correct Answer-Superintendent