Written by students who passed Immediately available after payment Read online or as PDF Wrong document? Swap it for free 4.6 TrustPilot
logo-home
Exam (elaborations)

PMT 3600V Questions And Correct Answers |100% Verified |Guaranteed Success | update

Rating
-
Sold
-
Pages
13
Grade
A+
Uploaded on
24-07-2026
Written in
2025/2026

Incorrect 0/2.5 Points 1 Based on Scenario Part 1, answer the following six questions (questions 1 to 6): 1. Rather than wait for the next President’s Budget to obtain authorization and funding to begin work, what kind of reprogramming action must DoD pursue to obtain funding for this New Start? Scenario Part I. You are taking over as the new Program Manager (PM) assigned to a joint (and potentially international) major defense acquisition program. The program is designing, developing, and integrating a system of systems. The Milestone Decision Authority (MDA) recently approved the Material Development Decision (MDD) authorizing entry into the Materiel Solutions Analysis (MSA) Phase. In addition to the MDD, other required documentation (e.g., validated Initial Capabilities Document) was generated from the Joint Capabilities Integration and Development System (JCIDS). The MDA designated the Navy as the lead service. The program is a New Start; it has not yet been addressed in a President’s Budget Request, but based on initial cost estimates, it is expected to be designated an Acquisition Category (ACAT) I program. The program will use advanced technology and an incremental acquisition strategy, with at least one additional increment planned after this initial increment. Reprogramming Transfer Authority Congressional Prior Approval Reprogramming Internal reprogramming (IR) Below Threshold Reprogramming (BTR) Correct 2.5/2.5 Points 2 You must program for out-year funding in the Planning, Programming, Budgeting, and Execution (PPBE) decision support system. What document is used to request funding from the Office of the Secretary of Defense (OSD) through the Lead Service as part of the Programming Phase? Scenario Part I. You are taking over as the new Program Manager (PM) assigned to a joint (and potentially international) major defense acquisition program. The program is designing, developing, and integrating a system of systems. The Milestone Decision Authority (MDA) recently approved the Material Development Decision (MDD) authorizing entry into the Materiel Solutions Analysis (MSA) Phase. In addition to the MDD, other required documentation (e.g., validated Initial Capabilities Document) was generated from the Joint Capabilities Integration and Development System (JCIDS). The MDA designated the Navy as the lead service. The program is a New Start; it has not yet been addressed in a President’s Budget Request, but based on initial cost estimates, it is expected to be designated an Acquisition Category (ACAT) I program. The program will use advanced technology and an incremental acquisition strategy, with at least one additional increment planned after this initial increment. Defense Planning Guidance (DPG) Program Objective Memorandum (POM) President’s Budget Request Acquisition Strategy Correct 2.5/2.5 Points 3 You anticipate using advanced technology in an airborne environment as part of the system solution. While many of the technologies are in use in other operational systems, at least one signal processing technology works well in a factory mock-up, but has never been demonstrated in an airborne environment. You know that new technology must be demonstrated in a relevant environment prior to which of the following? Scenario Part I. You are taking over as the new Program Manager (PM) assigned to a joint (and potentially international) major defense acquisition program. The program is designing, developing, and integrating a system of systems. The Milestone Decision Authority (MDA) recently approved the Material Development Decision (MDD) authorizing entry into the Materiel Solutions Analysis (MSA) Phase. In addition to the MDD, other required documentation (e.g., validated Initial Capabilities Document) was generated from the Joint Capabilities Integration and Development System (JCIDS). The MDA designated the Navy as the lead service. The program is a New Start; it has not yet been addressed in a President’s Budget Request, but based on initial cost estimates, it is expected to be designated an Acquisition Category (ACAT) I program. The program will use advanced technology and an incremental acquisition strategy, with at least one additional increment planned after this initial increment. System Requirements Review (SRR) Milestone C Preliminary Design Review (PDR) Milestone B Incorrect 0/2.5 Points 4 You want to get work efforts moving forward to begin planning the program. In accordance with the Major Capability Acquisition pathway, at what point does the Program Management Office (PMO) need to be established? Scenario Part I. You are taking over as the new Program Manager (PM) assigned to a joint (and potentially international) major defense acquisition program. The program is designing, developing, and integrating a system of systems. The Milestone Decision Authority (MDA) recently approved the Material Development Decision (MDD) authorizing entry into the Materiel Solutions Analysis (MSA) Phase. In addition to the MDD, other required documentation (e.g., validated Initial Capabilities Document) was generated from the Joint Capabilities Integration and Development System (JCIDS). The MDA designated the Navy as the lead service. The program is a New Start; it has not yet been addressed in a President’s Budget Request, but based on initial cost estimates, it is expected to be designated an Acquisition Category (ACAT) I program. The program will use advanced technology and an incremental acquisition strategy, with at least one additional increment planned after this initial increment. Concurrent with the Capabilities Based Assessment (CBA) Once the Capability Development Document (CDD) is validated Just prior to program initiation, typically Milestone B Prior to Milestone A Correct 2.5/2.5 Points

Show more Read less
Institution
PMT 3600V
Course
PMT 3600V

Content preview

PMT 3600V

Incorrect
0/2.5 Points
1
Based on Scenario Part 1, answer the following six questions (questions 1 to 6):

1. Rather than wait for the next President’s Budget to obtain authorization
and funding to begin work, what kind of reprogramming action must DoD
pursue to obtain funding for this New Start?
Scenario Part I. You are taking over as the new Program Manager (PM) assigned to a
joint (and potentially
international) major defense acquisition program. The program is designing,
developing, and
integrating a system of systems. The Milestone Decision Authority (MDA) recently
approved the
Material Development Decision (MDD) authorizing entry into the Materiel Solutions
Analysis (MSA)
Phase. In addition to the MDD, other required documentation (e.g., validated Initial
Capabilities
Document) was generated from the Joint Capabilities Integration and Development
System (JCIDS). The MDA designated the Navy as the lead service. The program is a
New Start; it has not yet been addressed in a President’s Budget Request, but based on
initial cost estimates, it is expected to be designated an Acquisition Category (ACAT) I
program. The program will use advanced technology and an incremental acquisition
strategy, with at least one additional increment planned after this initial increment.



Reprogramming Transfer Authority
Congressional Prior Approval Reprogramming
Internal reprogramming (IR)
Below Threshold Reprogramming (BTR)
Correct
2.5/2.5 Points
2
You must program for out-year funding in the Planning, Programming,
Budgeting, and Execution (PPBE) decision support system. What document is
used to request funding from the Office of the Secretary of Defense (OSD)
through the Lead Service as part of the Programming Phase?
Scenario Part I. You are taking over as the new Program Manager (PM) assigned to a
joint (and potentially
international) major defense acquisition program. The program is designing,
developing, and
integrating a system of systems. The Milestone Decision Authority (MDA) recently
approved the
Material Development Decision (MDD) authorizing entry into the Materiel Solutions
Analysis (MSA)
Phase. In addition to the MDD, other required documentation (e.g., validated Initial
Capabilities
Document) was generated from the Joint Capabilities Integration and Development

, System (JCIDS). The MDA designated the Navy as the lead service. The program is a
New Start; it has not yet been addressed in a President’s Budget Request, but based on
initial cost estimates, it is expected to be designated an Acquisition Category (ACAT) I
program. The program will use advanced technology and an incremental acquisition
strategy, with at least one additional increment planned after this initial increment.



Defense Planning Guidance (DPG)
Program Objective Memorandum (POM)
President’s Budget Request
Acquisition Strategy
Correct
2.5/2.5 Points
3
You anticipate using advanced technology in an airborne environment as part
of the system solution. While many of the technologies are in use in other
operational systems, at least one signal processing technology works well in a
factory mock-up, but has never been demonstrated in an airborne
environment.

You know that new technology must be demonstrated in a relevant
environment prior to which of the following?
Scenario Part I. You are taking over as the new Program Manager (PM) assigned to a
joint (and potentially
international) major defense acquisition program. The program is designing,
developing, and
integrating a system of systems. The Milestone Decision Authority (MDA) recently
approved the
Material Development Decision (MDD) authorizing entry into the Materiel Solutions
Analysis (MSA)
Phase. In addition to the MDD, other required documentation (e.g., validated Initial
Capabilities
Document) was generated from the Joint Capabilities Integration and Development
System (JCIDS). The MDA designated the Navy as the lead service. The program is a
New Start; it has not yet been addressed in a President’s Budget Request, but based on
initial cost estimates, it is expected to be designated an Acquisition Category (ACAT) I
program. The program will use advanced technology and an incremental acquisition
strategy, with at least one additional increment planned after this initial increment.

Written for

Institution
PMT 3600V
Course
PMT 3600V

Document information

Uploaded on
July 24, 2026
Number of pages
13
Written in
2025/2026
Type
Exam (elaborations)
Contains
Questions & answers

Subjects

$13.99
Get access to the full document:

Wrong document? Swap it for free Within 14 days of purchase and before downloading, you can choose a different document. You can simply spend the amount again.
Written by students who passed
Immediately available after payment
Read online or as PDF

Get to know the seller

Seller avatar
Reputation scores are based on the amount of documents a seller has sold for a fee and the reviews they have received for those documents. There are three levels: Bronze, Silver and Gold. The better the reputation, the more your can rely on the quality of the sellers work.
Brainarium Delaware State University
View profile
Follow You need to be logged in order to follow users or courses
Sold
1969
Member since
3 year
Number of followers
1045
Documents
23687
Last sold
3 hours ago

3.8

333 reviews

5
155
4
63
3
57
2
16
1
42

Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their tests and reviewed by others who've used these notes.

Didn't get what you expected? Choose another document

No worries! You can instantly pick a different document that better fits what you're looking for.

Pay as you like, start learning right away

No subscription, no commitments. Pay the way you're used to via credit card and download your PDF document instantly.

Student with book image

“Bought, downloaded, and aced it. It really can be that simple.”

Alisha Student

Working on your references?

Create accurate citations in APA, MLA and Harvard with our free citation generator.

Working on your references?

Frequently asked questions