New Mexico (NM) GS-24 Structural Steel Erection EXAM with Questions and Answers/Plus a Rationale Updated 2026 A+/Instant Download PDF

Document preview thumbnail
Preview 4 out of 38 pages

New Mexico (NM) GS-24 Structural Steel Erection EXAM with Questions and Answers/Plus a Rationale Updated 2026 A+/Instant Download PDF

Content preview

New Mexico (NM) GS-24 Structural Steel Erection EXAM
with Questions and Answers/Plus a Rationale Updated 2026
A+/Instant Download PDF
MAIN DOMAINS

1. OSHA Safety Regulations and Fall Protection
2. Structural Steel Erection Procedures and Rigging
3. Welding, Bolting, and Connection Details
4. Site Planning, Foundation Verification, and Crane Operations
1. When is a controlled deck zone (CDZ) permitted to be established during a structural steel
erection project under OSHA standards?

A. During the installation of all metal decking on multi-story commercial structures

B. Only on structures up to 30 feet in height when traditional fall protection is completely
infeasible

C. Only on structures up to 30 feet in height for metal decking operations where traditional
fall protection creates a greater hazard

D. During any roofing or decking phase where workers are trained as competent persons

CORRECT ANSWER : C

Rationale: OSHA 1926.760 permits controlled deck zones only on structures up to 30 feet in
height during initial metal decking operations where conventional fall protection is proven to be
infeasible or creates a greater hazard. Option A is incorrect because height and feasibility limits
apply. Option B is incorrect because feasibility, not mere height alone, dictates the allowance.
Option D is incorrect because training alone does not justify a CDZ.

2. What is the minimum compressive strength percentage required for concrete in footings and
piers before structural steel erection can safely commence?

A. 50% of specified compressive strength

B. 70% of specified compressive strength

C. 85% of specified compressive strength

D. 100% fully cured strength

CORRECT ANSWER : B

, Rationale: OSHA and industry standards require concrete in footings and piers to reach at least
70% of its specified compressive strength before absorbing loads from structural steel erection.
Option A is insufficient to support heavy steel loads safely. Options C and D exceed standard
baseline safety requirements for starting erection work.

3. Which of the following rigging components must be removed immediately from service if it
exhibits wear exceeding 10% of the original diameter of any individual wire?

A. Synthetic web slings

B. Alloy steel chain slings

C. Wire rope slings

D. Shackles and turnbuckles

CORRECT ANSWER : C

Rationale: Wire rope slings must be removed from service if there is corrosion, distortion, or
wear exceeding 10% of the original diameter of any individual outer wire. Option A refers to
synthetic materials evaluated by cuts and burns. Option B uses stretched links and gouges.
Option D relies on dimensional distortion rather than individual outer wire wear.

4. In structural steel bolting, what is the primary purpose of using direct tension indicator (DTI)
washers?

A. To lubricate the bolt threads during high-torque tightening

B. To provide a direct visual and measurable indication that the correct bolt tension has
been achieved

C. To prevent galvanic corrosion between dissimilar metals in coastal environments

D. To act as a secondary locking mechanism against dynamic vibrational loads

CORRECT ANSWER : B

Rationale: DTIs feature small protuberances that flatten progressively as tension increases,
giving a measurable gap indicating proper bolt preload. Option A is incorrect as lubricants are
applied separately. Option C addresses corrosion using coatings or isolation. Option D
describes lock washers rather than DTIs.

5. According to OSHA Subpart R, what is the maximum allowable height for multi-story column
erection without requiring a re-plumb check?

A. One story

, B. Two stories

C. Three stories

D. Four stories

CORRECT ANSWER : B

Rationale: Multi-story columns are typically erected in two-story lifts before requiring a formal
re-plumb and alignment check. Option A is too conservative for standard steel sequences.
Options C and D exceed the structural stability threshold for un-plumbed multi-story tiers.

6. What action must be taken immediately if anchor bolts are found to be out of tolerance or
damaged prior to column placement?

A. Modify the base plate holes in the field using an oxygen-acetylene torch without engineering
approval

B. Notify the project structural engineer of record and obtain written approval for any
modification or repair

C. Force the column base plate into position using heavy rigging and hydraulic jacks

D. Cut off the damaged anchor bolts and weld new ones directly to the foundation surface

CORRECT ANSWER : B

Rationale: Field modifications to structural anchor bolts or base plates require formal
engineering review and written authorization to maintain structural integrity. Option A is
prohibited due to metallurgical damage from unapproved torch cutting. Option C risks yielding
the bolts. Option D fails to meet structural load transfer standards.

7. When hoisting structural members, what type of signaling system must be used if the crane
operator's view is obstructed?

A. Two-way radio communication only

B. Automated laser sensor tracking systems

C. Standard hand signals or dedicated radio communication by a qualified signal person

D. Visual flashing light arrays installed on the boom tip

CORRECT ANSWER : C

, Rationale: OSHA requires a qualified signal person using standardized hand signals or
dedicated radio communication when the operator's direct line of sight is obstructed. Option A
restricts communication exclusively to radio when hand signals are also valid. Options B and D
are supplemental or non-standard methods.

8. What is the mandatory minimum overlap for metal decking sheets installed in a structural steel
floor system?

A. 1 inch at side laps

B. 1.5 inches at side laps and 2 inches at end laps

C. 3 inches at all laps regardless of manufacturer specifications

D. No overlap is required if welds are spaced tightly

CORRECT ANSWER : B

Rationale: Industry standards and manufacturer specifications generally require at least 1.5
inches of side lap overlap and 2 inches of end lap overlap for metal decking. Option A is too
small for proper load distribution. Option C is excessively arbitrary. Option D ignores basic
diaphragm action requirements.

9. Which welding process is most commonly utilized for field shear connector stud welding onto
steel beams?

A. Shielded Metal Arc Welding (SMAW)

B. Gas Tungsten Arc Welding (GTAW)

C. Automatic Electric Arc Stud Welding

D. Flux-Cored Arc Welding (FCAW)

CORRECT ANSWER : C

Rationale: Shear studs are almost exclusively installed using specialized automatic electric arc
stud welding equipment with ceramic ferrules. Option A is used for structural joints, not rapid
stud attachment. Option B is slow and used for precision pipe. Option D is used for
manual/semi-automatic structural joints.

10. What defines a "competent person" in the context of structural steel erection safety regulations?

A. Any worker who has completed an OSHA 10-hour construction course

B. An individual who has a professional engineering license in New Mexico

Document information

Uploaded on
July 24, 2026
Number of pages
38
Written in
2025/2026
Type
Exam (elaborations)
Contains
Questions & answers
$23.99

Wrong document? Swap it for free Within 14 days of purchase and before downloading, you can choose a different document. You can simply spend the amount again.
Written by students who passed
Immediately available after payment
Read online or as PDF

Seller avatar
becciedgar26
5.0
(1)
Sold
3
Followers
0
Items
1046
Last sold
1 month ago


Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their tests and reviewed by others who've used these notes.

Didn't get what you expected? Choose another document

No worries! You can instantly pick a different document that better fits what you're looking for.

Pay as you like, start learning right away

No subscription, no commitments. Pay the way you're used to via credit card and download your PDF document instantly.

Student with book image

“Bought, downloaded, and aced it. It really can be that simple.”

Alisha Student

Working on your references?

Create accurate citations in APA, MLA and Harvard with our free citation generator.

Working on your references?

Frequently asked questions