What is a fire bill?
ANSWER
A list of procedures you follow in case of a fire. They should be posted throughout the sta-
tion.
How do you report a mishap?
ANSWER
Send a report through the CODR
How is inerted ammunition that kept its original markings and paint identified as inert?
ANSWER
It is marked with a serial number that is traceable to a record of certification and identifica-
tion
What type of deviation is an exemption?
ANSWER
A long-term deviation for operations that cannot meet criteria at existing facilities
What is the maximum amount of time permitted for an exemption to be in effect?
ANSWER
5 years
What type of documentation is NOT required for explosives safety site approval request
(ESAR)?
ANSWER
Ship arrivals???
1
, What two actions are required to support Qualification/Certification training? Select all that
apply.
ANSWER
Identify A&E personnel
Training all A&E personnel
Where are Standard Operating Procedures (SOPs) required to be located?
ANSWER
On-hand in work areas at all times (areas where processing is performed)
Which A&E personnel must be qualified/certified before handling A&E?
ANSWER
All individuals (Navy and Civilian) who handle A&E
When does a certification expire?
ANSWER
Last day of the 12th month
When shall a new Standard Operating Procedure (SOP) be developed?
ANSWER
Before starting A&E operations
Some examples of required Standard Operating Procedure (SOP) content includes a title
page, references, step-by-step procedures, and
ANSWER
a Worker's statement indicating the worker clearly understands his or her duties
2
ANSWER
A list of procedures you follow in case of a fire. They should be posted throughout the sta-
tion.
How do you report a mishap?
ANSWER
Send a report through the CODR
How is inerted ammunition that kept its original markings and paint identified as inert?
ANSWER
It is marked with a serial number that is traceable to a record of certification and identifica-
tion
What type of deviation is an exemption?
ANSWER
A long-term deviation for operations that cannot meet criteria at existing facilities
What is the maximum amount of time permitted for an exemption to be in effect?
ANSWER
5 years
What type of documentation is NOT required for explosives safety site approval request
(ESAR)?
ANSWER
Ship arrivals???
1
, What two actions are required to support Qualification/Certification training? Select all that
apply.
ANSWER
Identify A&E personnel
Training all A&E personnel
Where are Standard Operating Procedures (SOPs) required to be located?
ANSWER
On-hand in work areas at all times (areas where processing is performed)
Which A&E personnel must be qualified/certified before handling A&E?
ANSWER
All individuals (Navy and Civilian) who handle A&E
When does a certification expire?
ANSWER
Last day of the 12th month
When shall a new Standard Operating Procedure (SOP) be developed?
ANSWER
Before starting A&E operations
Some examples of required Standard Operating Procedure (SOP) content includes a title
page, references, step-by-step procedures, and
ANSWER
a Worker's statement indicating the worker clearly understands his or her duties
2