Written by students who passed Immediately available after payment Read online or as PDF Wrong document? Swap it for free 4.6 TrustPilot
logo-home
Document preview thumbnail
Preview 2 out of 8 pages
Exam (elaborations)

CHAPTER 9: PROJECT SCHEDULING: PERT/CPM QUESTIONS AND VERIFIED DETAILED SOLUTIONS ( MULTIPLE CHOICES) |100% CORRECT!! ALREADY GRADED A+

Document preview thumbnail
Preview 2 out of 8 pages

CHAPTER 9: PROJECT SCHEDULING: PERT/CPM QUESTIONS AND VERIFIED DETAILED SOLUTIONS ( MULTIPLE CHOICES) |100% CORRECT!! ALREADY GRADED A+

Content preview

CHAPTER 9: PROJECT SCHEDULING: PERT/CPM QUESTIONS AND
VERIFIED DETAILED SOLUTIONS ( MULTIPLE CHOICES) |100%
CORRECT!! ALREADY GRADED A+



Critical activities are those that can be delayed without delaying the entire project. (T/F) -
(ANSWER)FALSE



PERT and CPM are applicable only when there is no dependence among activities. (T/F) -
(ANSWER)FALSE



A path through a project network must reach every node. (T/F) - (ANSWER)FALSE



A critical activity can be part of a noncritical path. (T/F) - (ANSWER)TRUE



When activity times are uncertain, an activity's most likely time is the same as its expected time. (T/F) -
(ANSWER)FALSE



The earliest finish time for the final activity is the project duration. (T/F) - (ANSWER)TRUE



The length of time an activity can be delayed without affecting the project completion is the slack. (T/F) -
(ANSWER)TRUE



When activity times are uncertain, total project time is normally distributed with mean equal the sum of
the means of all of the critical activities. (T/F) - (ANSWER)TRUE



Crashing refers to an unanticipated delay in a critical path activity that causes the total time to exceed its
limit. (T/F) - (ANSWER)FALSE



Constraints in the LP models for crashing decisions are required to compare the activity's earliest finish
time with the earliest finish time of each predecessor. (T/F) - (ANSWER)TRUE



The project manager should monitor the progress of any activity with a large time variance even if the
expected time does not identify the activity as a critical activity. (T/F) - (ANSWER)TRUE

, CHAPTER 9: PROJECT SCHEDULING: PERT/CPM QUESTIONS AND
VERIFIED DETAILED SOLUTIONS ( MULTIPLE CHOICES) |100%
CORRECT!! ALREADY GRADED A+




The variance in the project completion time is the sum of the variances of all activities in the project.
(T/F) - (ANSWER)FALSE



The latest finish time for an activity is the largest of the latest start times for all activities that
immediately follow the activity. (T/F) - (ANSWER)FALSE



The earliest start time for an activity is equal to the smallest of the earliest finish times for all its
immediate predecessors. (T/F) - (ANSWER)FALSE



The linear programming model for crashing presented in the textbook assumes that any portion of the
activity crash time can be achieved for a corresponding portion of the activity crashing cost. (T/F) -
(ANSWER)TRUE



All activities on a critical path have zero slack time. (T/F) - (ANSWER)TRUE



The difference between an activity's earliest finish time and the latest finish time equals the difference
between its earliest time and latest start time. (T/F) - (ANSWER)TRUE



It is possible to have more than one critical path at a time. (T/F) - (ANSWER)TRUE



Activities require time to complete while events do not. (T/F) - (ANSWER)TRUE



Precedence relationships among activities is critical in CPM analysis but not in PERT. (T/F) -
(ANSWER)FALSE



The normal distribution tends to be a better approximation of the distribution of total time for shorter
projects where the critical path has relatively few activities. (T/F) - (ANSWER)FALSE

Document information

Uploaded on
July 23, 2026
Number of pages
8
Written in
2025/2026
Type
Exam (elaborations)
Contains
Questions & answers
Free
Download

Wrong document? Swap it for free Within 14 days of purchase and before downloading, you can choose a different document. You can simply spend the amount again.
Written by students who passed
Immediately available after payment
Read online or as PDF

Sold
2
Followers
0
Items
360
Last sold
1 day ago


Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their tests and reviewed by others who've used these notes.

Didn't get what you expected? Choose another document

No worries! You can instantly pick a different document that better fits what you're looking for.

Pay as you like, start learning right away

No subscription, no commitments. Pay the way you're used to via credit card and download your PDF document instantly.

Student with book image

“Bought, downloaded, and aced it. It really can be that simple.”

Alisha Student

Working on your references?

Create accurate citations in APA, MLA and Harvard with our free citation generator.

Working on your references?

Frequently asked questions