Written by students who passed Immediately available after payment Read online or as PDF Wrong document? Swap it for free 4.6 TrustPilot
logo-home
Exam (elaborations)

PMP CERTIFICATION EXAM ACTUAL PAPER 2026 QUESTIONS WITH SOLUTIONS GRADED A PLUS COMPLETE REVIEW SET 800 ITEMS

Rating
-
Sold
-
Pages
80
Grade
A+
Uploaded on
22-07-2026
Written in
2025/2026

PMP CERTIFICATION EXAM ACTUAL PAPER 2026 QUESTIONS WITH SOLUTIONS GRADED A PLUS COMPLETE REVIEW SET 800 ITEMS

Institution
PMP
Course
PMP

Content preview

PMP CERTIFICATION EXAM ACTUAL PAPER
2026 QUESTIONS WITH SOLUTIONS GRADED
A PLUS COMPLETE REVIEW SET 800 ITEMS

◉ Planned Value (PV).
Answer: The portion of the approved total cost estimate planned to
be spent on an activity during a given period. Planned % Complete x
BAC


◉ Actual Cost (AC).
Answer: The realized cost incurred for the work performed on an
activity during a specific time period.


◉ Budget at Completion (BAC).
Answer: The sum of all budgets established for the work to be
performed.


◉ Estimate to Complete (ETC).
Answer: The expected cost to finish all the remaining project work.
EAC - AC


◉ Estimate at Completion (EAC).

,Answer: The expected total cost of completing all work expressed as
the sum of the actual cost to date and the estimate to complete. BAC
/ CPI


◉ Cost Performance Index (CPI).
Answer: A measure of the cost efficiency of budgeted resources
expressed as the ratio of earned value to actual cost. EV / AC


◉ Schedule Performance Index (SPI).
Answer: A measure of schedule efficiency expressed as the ratio of
earned value to planned value. EV / PV


◉ To-Complete Performance Index (TCPI).
Answer: A measure of the cost performance that is required to be
achieved with the remaining resources in order to meet a specified
management goal, expressed as the ratio of the cost to finish the
outstanding work to the remaining budget. (BAC - EV) / (BAC - AC)


◉ Cost Variance (CV).
Answer: EV - AC
Negative is over budget; positive is under budget


◉ Schedule Variance (SV).
Answer: EV - PV

,Negative is behind schedule; positive is ahead of schedule


◉ Variance at Completion (VAC).
Answer: A projection of the amount of budget deficit or surplus,
expressed as the difference between the budget at completion and
the estimate at completion. BAC - EAC


◉ Economic Value Added (EVA).
Answer: Net operating profit after taxes minus (capital x cost of
capital); a measure of the economic value of an investment or
project


◉ Future Value (FV).
Answer: the value of future cash flows discounted at the appropriate
discount rate FV = PV(1+r)^n


◉ Return on Invested Capital (ROIC).
Answer: Net income after tax / Invested Tax (smaller is better)


◉ Order of Magnitude Estimate.
Answer: A high-level estimate of the time and cost of a project based
on the actual cost and duration of a similar project. -50% to +100%

, ◉ Conceptual Estimate.
Answer: a cost estimate based on very little design information and
using gross unit pricing to determine the project cost. -30% to +50%


◉ Preliminary Estimate.
Answer: -20% to +30% estimate range


◉ Definitive Estimate.
Answer: -15% to +20% estimate range


◉ Control Estimate.
Answer: -10% to +15% estimate range


◉ Delphi Technique.
Answer: A decision-making technique in which group members do
not meet face-to-face but respond in writing to questions posed by
the group leader. Prevents biasing opinions and groupthink.


◉ Nominal Group Technique.
Answer: Brainstormed ideas are voted upon and sorted by priority


◉ Scope Baseline.

Written for

Institution
PMP
Course
PMP

Document information

Uploaded on
July 22, 2026
Number of pages
80
Written in
2025/2026
Type
Exam (elaborations)
Contains
Questions & answers

Subjects

$13.99
Get access to the full document:

Wrong document? Swap it for free Within 14 days of purchase and before downloading, you can choose a different document. You can simply spend the amount again.
Written by students who passed
Immediately available after payment
Read online or as PDF

Get to know the seller

Seller avatar
Reputation scores are based on the amount of documents a seller has sold for a fee and the reviews they have received for those documents. There are three levels: Bronze, Silver and Gold. The better the reputation, the more your can rely on the quality of the sellers work.
GradeGalaxy Havard School
View profile
Follow You need to be logged in order to follow users or courses
Sold
124
Member since
8 months
Number of followers
2
Documents
43042
Last sold
1 day ago
GradeGalaxy

Welcome to the premier destination for high-quality academic support. GradeGalaxy7 provides a comprehensive suite of educational materials, including expertly sourced test banks, solution manuals, and study guides. Our resources are meticulously organized to streamline your revision process and enhance your understanding of core concepts. Equip yourself with the reliable content you need to achieve superior academic results.

4.4

8 reviews

5
5
4
1
3
2
2
0
1
0

Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their tests and reviewed by others who've used these notes.

Didn't get what you expected? Choose another document

No worries! You can instantly pick a different document that better fits what you're looking for.

Pay as you like, start learning right away

No subscription, no commitments. Pay the way you're used to via credit card and download your PDF document instantly.

Student with book image

“Bought, downloaded, and aced it. It really can be that simple.”

Alisha Student

Working on your references?

Create accurate citations in APA, MLA and Harvard with our free citation generator.

Working on your references?

Frequently asked questions