Written by students who passed Immediately available after payment Read online or as PDF Wrong document? Swap it for free 4.6 TrustPilot
logo-home
Document preview thumbnail
Preview 4 out of 70 pages
Exam (elaborations)

APM PMQ Exam Review Questions with Correct Answers

Document preview thumbnail
Preview 4 out of 70 pages

APM PMQ Exam Review Questions with Correct Answers

Content preview

APM PMQ Exam Review Questions with
Correct Answers
1. linear (waterfall) lifecycle?

- sequential lifecycle with clearly defined outputs

- low risk projects

- time and cost are variable

- scope and quality are fixed

- four phases

1. linear (waterfall) lifecycle first phase?

Concept

- idea development

-high level requirements

-product purpose

1. linear (waterfall) lifecycle second phase?

Definition

- detailed product definition + plan

- create PMP

- 6 Ws (what, why, when etc)

1. linear (waterfall) lifecycle third phase?

Deployment

- implement plans

- verify performance via testing

- realise outputs/outcomes/benefits

,1. linear (waterfall) lifecycle fourth phase?

Transition/Closure

- handover, commissioning, accept outputs

- formal closure

1. iterative (agile) lifecycle definition?

- different project stages occur in parallel

- repeats 1+ phases

- evolves objectives

- e.g. product design

- vague project scope

- flexibility

- iterations tweaked

- time and cost FIXED

- scope and quality VARIABLE

1. hybrid lifecycle definition?

- combines linear and iterative

- elements from both to suit project

- adaptability

- iterative during development (phase 3) to develop outputs

1. project lifecycle definition?

- phases up to transition/closure

- business delivers project for customer

,- contract completed at handover

- output accountability handed over

1. extended lifecycle definition?

- beyond transition phase

- adoption phase added

- benefits realisation phase added

- benefits realised after going operational (immediate feedback)

- output accountability stays with project until fully embedded change

1. linear lifecycle pros/cons?

+ highly structured/predictable/stability

+ max control / governance

+ minimal risk

+ clear framework



- needs early scope clarity

- needs upfront knowledge/experience

- slower to realise benefits

- less flexibility r.e. change

1. iterative lifecycle pros/cons?

+ flexibility/adaptability

+ vague project scope

+ evolving objectives

+ less upfront experience/knowledge

+ accomodates change

, - high risk

- lack of certainty r.e. duration/cost

- complex resource management

1. hybrid lifecycle pros/cons?

+ suit specific project development

+ increased flexibility

+ increased efficiency



- need great skill/clarity using multiple systems

- complex

2. permanent organisational structure definition?

- stable teams for routine/operational work

- business as usual (BAU) activities

- specific resources to complete routine tasks with stable environment

- permanent skilled resource allocated

2. temporary organisational structure?

- temp teams for specific projects

- temp project environment

- unique and varied tasks

- temp teams bring different skills

2. matrix organisational structure?

Document information

Uploaded on
July 21, 2026
Number of pages
70
Written in
2025/2026
Type
Exam (elaborations)
Contains
Questions & answers
$15.99

Wrong document? Swap it for free Within 14 days of purchase and before downloading, you can choose a different document. You can simply spend the amount again.
Written by students who passed
Immediately available after payment
Read online or as PDF

Seller avatar
Reputation scores are based on the amount of documents a seller has sold for a fee and the reviews they have received for those documents. There are three levels: Bronze, Silver and Gold. The better the reputation, the more your can rely on the quality of the sellers work.
KenAli
2.6
(18)
Sold
101
Followers
5
Items
21209
Last sold
4 days ago


Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their tests and reviewed by others who've used these notes.

Didn't get what you expected? Choose another document

No worries! You can instantly pick a different document that better fits what you're looking for.

Pay as you like, start learning right away

No subscription, no commitments. Pay the way you're used to via credit card and download your PDF document instantly.

Student with book image

“Bought, downloaded, and aced it. It really can be that simple.”

Alisha Student

Working on your references?

Create accurate citations in APA, MLA and Harvard with our free citation generator.

Working on your references?

Frequently asked questions