Written by students who passed Immediately available after payment Read online or as PDF Wrong document? Swap it for free 4.6 TrustPilot
logo-home
Exam (elaborations)

CON 1300 Test Review Questions with Clear Rationales (2026/2027)

Rating
-
Sold
-
Pages
33
Grade
A+
Uploaded on
21-07-2026
Written in
2025/2026

This document contains questions and verified answers for CON 1300 Test Review . It includes detailed explanations, revision-focused content, and exam preparation material suitable for 2026/2027 students.

Institution
CON 1300
Course
CON 1300

Content preview

CON 1300 Test Review

A _____ is a reaction to a solicitation that, if ordinary, would _____ the offeror to carry out the
resultant settlement.

1. Offer

2. Bind




These offer reaction kinds are taken into consideration binding offers:

1. Bid

2. Offer/Proposal




A _____ is not an offer as it does now not bind the contractor to carry out a mission.

Quote




_____ are used to solicit in simplified acquisition tactics. Reponses to this solicitation come
inside the form of a _____. It is vital to take into account that this reaction _____ considered a
proposal and _____ binding. Far reference: ______

1. Requests for quotations (RFQ)

2. Quote

three. Is NOT

four. Is NOT

5. Part thirteen

,_____ are used to solicit within sealed bidding strategies. Reponses to this solicitation come in
the form of a _____. It is important to don't forget that this reaction _____ considered a
suggestion and _____ binding. Far reference: _____

1. Invitations for bids (IFB)

2. Bid

3. Is

4. Is

five. Part 14




_____ are used to solicit within agreement via negotiation processes. Reponses to this
solicitation come inside the form of a _____. It is vital to do not forget that this reaction _____
considered a proposal and _____ binding. Far reference: _____

1. Requests for Proposal (RFP)

2. Proposal

three. Is

four. Is

five. Part 15




Trade-off proposals consist of and are taken into consideration by _____, _______, and ______
parameters.

1. Technical

2. Cost/Price

three. Past Performance




True or False. A quotation is taken into consideration an offer?

,False : A Quote is not a proposal as it does now not bind the contractor to carry out a task.




An offer for a RFQ beneath FAR subpart eight.4 is a _____.

Purchase Order




The Lowest Price Technically Acceptable (LPTA) includes:
1. Evaluation elements and sub elements shall be inside the solicitation

2. Based on Lowest Price and Technically Acceptable Offer

three. Solicitations shall specify that award may be made on basis of LPTA




Tradeoffs Include or are guided by means of:
1. Characteristics of the tradeoff technique: FAR 15.One hundred and one-1

2. Permits tradeoffs amongst price and price and non-value factors

three. Allows Government to simply accept aside from the lowest priced thought

4. Awarding to better priced proposal have to advantage the additional value

five. Rationale for tradeoffs must be documented within the record




What is the definition of contract chance?
“a measure of future uncertainties in reaching software goals and objectives within described
cost, agenda, and performance constraints.”




What are the three key chance factors of a agreement?
1. Cost

2. Schedule

three. Performance

, _____ and _____ are two ways to mitigate danger. They are carefully associated and need to
be considered collectively.

1. Contract type

2. Contract pricing




_____ is the hazard that sports will take longer than anticipated, and is typically the result of
negative making plans or unexpected situations.

Schedule chance




_____ is an escalation of assignment prices. It is the risk that the assignment will fee greater
than the budget allotted for it. Perhaps the maximum common task chance, fee threat is due to
terrible finances making plans, faulty fee estimating, and scope creep.

Cost threat




_____ is the danger that the assignment will fail to provide outcomes steady with challenge
specifications.

Performance threat




Schedule Risk Mitigation by agreement type:

1. Fixed Price contracts = contractor have to carry out and meet the _____.

2. Cost Reimbursement contracts = contractor will perform their _____.

1. Transport agenda

2. “exceptional attempt”

Written for

Institution
CON 1300
Course
CON 1300

Document information

Uploaded on
July 21, 2026
Number of pages
33
Written in
2025/2026
Type
Exam (elaborations)
Contains
Questions & answers

Subjects

  • con 1300
$10.99
Get access to the full document:

Wrong document? Swap it for free Within 14 days of purchase and before downloading, you can choose a different document. You can simply spend the amount again.
Written by students who passed
Immediately available after payment
Read online or as PDF

Get to know the seller
Seller avatar
lennieamayah

Also available in package deal

Thumbnail
Package deal
CON 1300 Exam Questions and Correct Answers with Rationales (2026/2027)
-
4 2026
$ 20.99 More info

Get to know the seller

Seller avatar
lennieamayah Howard community college
View profile
Follow You need to be logged in order to follow users or courses
Sold
-
Member since
6 days
Number of followers
0
Documents
211
Last sold
-

0.0

0 reviews

5
0
4
0
3
0
2
0
1
0

Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their tests and reviewed by others who've used these notes.

Didn't get what you expected? Choose another document

No worries! You can instantly pick a different document that better fits what you're looking for.

Pay as you like, start learning right away

No subscription, no commitments. Pay the way you're used to via credit card and download your PDF document instantly.

Student with book image

“Bought, downloaded, and aced it. It really can be that simple.”

Alisha Student

Working on your references?

Create accurate citations in APA, MLA and Harvard with our free citation generator.

Working on your references?

Frequently asked questions