Written by students who passed Immediately available after payment Read online or as PDF Wrong document? Swap it for free 4.6 TrustPilot
logo-home
Exam (elaborations)

MAI COURSE EXAM 1 & 2 2026/2027 | COMPREHENSIVE QUESTIONS & ANSWER RATIONALES

Rating
-
Sold
-
Pages
27
Grade
A+
Uploaded on
21-07-2026
Written in
2025/2026

MAI COURSE EXAM 1 & 2 2026/2027 | COMPREHENSIVE QUESTIONS & ANSWER RATIONALES

Institution
MAI COURSE
Course
MAI COURSE

Content preview

MAI COURSE EXAM 1 & 2 2026/2027 |
COMPREHENSIVE QUESTIONS & ANSWER
RATIONALES




Curriculum materials - correct answer-Are those items that are required to
instruct a lesson. This inculdes the master lesson file, lesson plans, performance
evluation checklists, and media.


Master lesson file - correct answer-Is a compilation of documents that contain all
the necessary materials to conduct a period of instruction. The MLF is the most
up-to-date file on an individual lesson taught in the course. The purpose of the
MLF is to provide accountability for the learning process, document lesson.


Lesson plan - correct answer-Is the detailed script for the instructor, also referred
to as an instructor outline. It is detailed enough so that a new instructor could
review it and be able to conduct the required training.


Performance evaluation checklist - correct answer-The PECLs used by an MAI are
belt tests which are Navy/Marine corps forms (NAVMCs) :
11739 (tan)
11740 (grey)
11741 (green)
11742 (brown)

,11743 (black )


Media - correct answer-Instructional media enhances verbal information and
improves the student's ability to retain the information identified in the learning
objectives by appealing to the different learning styles.


Administrative materials - correct answer-Are the materials that enable you to
track the training being conducted. These materials are the training log, mishap
report, course record, and certificate. All materials must be retained for a period
of 3 YEARS.


Training log - correct answer-Are used to track the training and progress of each
individual marine within the program. It is the instructors responsibility to provide
their students with logbooks, but the student responsibility to maintain them.


Mishap report - correct answer-NAVMC 11738, must be completed if a student is
injured while conducting MCMAP training. The MAI must fill out the report and
submit the report to the unit safety rep, who will submit it into the web enabled
safety system (WESS).


Course record - correct answer-NAVMC 11432, after testing students for belt
level advancement the instructor must complete this form and turn a copy into
the marines training section (S-3) for entry into the training management system.


Certificate - correct answer-Is completed by the MAI for each individual marine
trained. The MAI must enter the student name, unit address, instructors name
and signature, and commanding officers name and signature.

, Concepts of risk management - correct answer-Risk mitigation is central to the
idea of readiness and must not be an afterthought in actions during combat, in
training, and in garrison.


Mission of risk management - correct answer-The focus of RM is to indenting and
mitigate risk in all activities, both on and off duty. RM extends to risk associated
with human factors in the workplace, behavioral healthcare, and behavioral
lifestyles that can affect readiness. Successful implementation of RM increases
mission effectiveness while minimizing loss of both personnel and material.


Principles of risk management - correct answer-1) accept risk when benefits
outweigh the cost.
2) accept no unnecessary risk.
3) anticipate and manage risk by planning
4) make risk decisions at the right level.


Accept risk when benefits outweigh the cost - correct answer-The goal of RM is
not to eliminate risk, but to manage the risk so the mission can be accomplished
with the minimum amount of loss.


Accept no unnecessary risk. - correct answer-An unnecessary risk is any risk that,
if taken, will not contribute meaningfully to task or mission accomplishment or
will needlessly jeopardize personnel or material.


Anticipate and manage risk by planning. - correct answer-RM must be integrated
into planning at all levels , and as early as possible, to provide the greatest
opportunity to make well- informed risk divisions and to implement effective risk
controls.

Written for

Institution
MAI COURSE
Course
MAI COURSE

Document information

Uploaded on
July 21, 2026
Number of pages
27
Written in
2025/2026
Type
Exam (elaborations)
Contains
Questions & answers

Subjects

$13.99
Get access to the full document:

Wrong document? Swap it for free Within 14 days of purchase and before downloading, you can choose a different document. You can simply spend the amount again.
Written by students who passed
Immediately available after payment
Read online or as PDF

Get to know the seller
Seller avatar
rosaline2

Get to know the seller

Seller avatar
rosaline2 Walden University
View profile
Follow You need to be logged in order to follow users or courses
Sold
-
Member since
5 days
Number of followers
0
Documents
149
Last sold
-

0.0

0 reviews

5
0
4
0
3
0
2
0
1
0

Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their tests and reviewed by others who've used these notes.

Didn't get what you expected? Choose another document

No worries! You can instantly pick a different document that better fits what you're looking for.

Pay as you like, start learning right away

No subscription, no commitments. Pay the way you're used to via credit card and download your PDF document instantly.

Student with book image

“Bought, downloaded, and aced it. It really can be that simple.”

Alisha Student

Working on your references?

Create accurate citations in APA, MLA and Harvard with our free citation generator.

Working on your references?

Frequently asked questions