Written by students who passed Immediately available after payment Read online or as PDF Wrong document? Swap it for free 4.6 TrustPilot
logo-home
Document preview thumbnail
Preview 3 out of 29 pages
Exam (elaborations)

ACI Concrete Field Testing Technician Grade I Certification Practice Test | Complete Practice Questions with Detailed Answers & Rationales - Latest Edition Updated 2026/2027

Document preview thumbnail
Preview 3 out of 29 pages

Prepare to pass the ACI Concrete Field Testing Technician Grade I Certification Exam with this complete 2026/2027 practice test guide! Packed with actual exam-style questions, verified correct answers, and detailed rationales covering high-yield topics including cylinder mold specifications, temperature measurement procedures, strike-off and consolidation techniques, and ASTM standards for field testing. Perfect for construction professionals and technicians seeking ACI certification, this high-yield resource helps you master essential concrete testing procedures and confidently ace the exam. Updated, accurate, and already proven effective — your ultimate tool for ACI Grade I success!

Content preview

ACI Concrete Field Testing Technician Grade I
Certification Practice Test | Complete Practice
Questions with Detailed Answers & Rationales -
Latest Edition Updated 2026/2027

Question 1
A 6 by 12 in [150 mm by 300 mm] cylinder mold can be used for concrete containing
aggregate with particles not exceeding in size, without the need for wet sieving the
concrete.
Answer: 2 in. [50 mm]. ✔✔

Rationale: A 6x12 inch cylinder can accommodate aggregate up to 2 inches in size
without requiring wet sieving, as the mold diameter is three times the maximum
aggregate size.


Question 2
According to ASTM C1064, what is one reason to take the temperature of concrete?
Answer: Verify conformance to a specified requirement for temperature of concrete.
✔✔

Rationale: Temperature measurement ensures concrete meets specification
requirements for placement temperature.


Question 3
After completing the strike-off procedure, what must be done before weighing the
measure and sample?
Answer: Clean off any excess concrete. ✔✔

Rationale: The outside of the measure must be cleaned to ensure accurate weight
measurement.


Question 4
After consolidation of the final layer, an excess of concrete above the top of the measure
is considered optimum.
Answer: 1/8 in. [3 mm]. ✔✔

pg. 1

,Rationale: A slight excess of 1/8 inch allows for proper strike-off and ensures the
measure is completely filled.


Question 5
After molding test specimens, you should wait two hours before moving them to the
location of initial storage. True or False?
Answer: False; the specimens must be moved immediately. ✔✔

Rationale: Specimens must be moved to initial storage immediately after molding to
prevent moisture loss and damage.


Question 6
After rodding each layer, what should be done to the measure before adding another
layer of concrete?
Answer: Tap the sides of the measure smartly 10 to 15 times with the mallet. ✔✔

Rationale: Tapping releases entrapped air and consolidates the concrete for accurate
air content measurement.


Question 7
After the final rodding, the sides of the slump mold should be tapped lightly with the
tamping rod. True or False?
Answer: False. ✔✔

Rationale: Tapping the sides of the slump mold can artificially consolidate the
concrete and reduce the slump measurement.


Question 8
After the temperature of the concrete is read, what is required?
Answer: Reporting of temperature. ✔✔

Rationale: The temperature reading must be documented and reported as part of
quality control records.


Question 9
Air meter bowls used for this test must conform to ASTM and be calibrated for volume


pg. 2

, according to ASTM.
Answer: C231, C29. ✔✔

Rationale: Air meter bowls are specified by ASTM C231 and calibrated per ASTM C29
for accurate volume measurement.


Question 10
The approximate concrete depth (in vertical distance) after placing the first layer is and
the second layer is.
Answer: 2 5/8 in. [70 mm], 6 1/8 in. [160 mm]. ✔✔

Rationale: These depths correspond to one-third and two-thirds of the slump cone
height (12 inches) respectively.


Question 11
ASTM Method gives standardized requirements for and of test specimens.
Answer: Making, curing, protecting, transporting. ✔✔

Rationale: ASTM C31 covers all aspects of specimen handling from molding to testing.


Question 12
At the end of the procedure, the air meter is.
Answer: Disassembled and its contents examined. ✔✔

Rationale: Disassembly allows inspection for undisturbed concrete that would
invalidate the test.


Question 13
The composite sample for a paving mixer must represent a minimum of different
portions of the batch of concrete taken from the pile after discharge.
Answer: 5. ✔✔

Rationale: Five portions from the discharge pile ensure a representative sample of the
entire batch.


Question 14
A composite sample of concrete is required even if the only purpose for obtaining the

pg. 3

Document information

Uploaded on
July 21, 2026
Number of pages
29
Written in
2025/2026
Type
Exam (elaborations)
Contains
Questions & answers
$21.49

Wrong document? Swap it for free Within 14 days of purchase and before downloading, you can choose a different document. You can simply spend the amount again.
Written by students who passed
Immediately available after payment
Read online or as PDF

Seller avatar
Reputation scores are based on the amount of documents a seller has sold for a fee and the reviews they have received for those documents. There are three levels: Bronze, Silver and Gold. The better the reputation, the more your can rely on the quality of the sellers work.
ExamsWizard
4.1
(32)
Sold
139
Followers
12
Items
910
Last sold
15 hours ago



Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their tests and reviewed by others who've used these notes.

Didn't get what you expected? Choose another document

No worries! You can instantly pick a different document that better fits what you're looking for.

Pay as you like, start learning right away

No subscription, no commitments. Pay the way you're used to via credit card and download your PDF document instantly.

Student with book image

“Bought, downloaded, and aced it. It really can be that simple.”

Alisha Student

Working on your references?

Create accurate citations in APA, MLA and Harvard with our free citation generator.

Working on your references?

Frequently asked questions