Written by students who passed Immediately available after payment Read online or as PDF Wrong document? Swap it for free 4.6 TrustPilot
logo-home
Document preview thumbnail
Preview 4 out of 57 pages
Exam (elaborations)

Texas General Contractor Licensing Exam Practice Questions And Correct Answers (Verified Answers) Plus Rationale 2026 Q&A| Instant Download Pdf

Document preview thumbnail
Preview 4 out of 57 pages

Texas General Contractor Licensing Exam Practice Questions And Correct Answers (Verified Answers) Plus Rationale 2026 Q&A| Instant Download Pdf

Content preview

Texas General Contractor Licensing
Exam Practice Questions And Correct
Answers (Verified Answers) Plus
Rationale 2026 Q&A| Instant Download
Pdf



1. A general contractor in Texas is preparing a bid for a municipal
construction project requiring compliance with state procurement
regulations. During the review of the project manual, the contractor
notices that the specifications require adherence to prevailing wage
provisions, bonding requirements, and mandatory minority
subcontractor participation goals. Before submitting the bid, which
action is the MOST important to ensure legal compliance and reduce
the risk of bid rejection or future disputes?

A. Submit the bid immediately and negotiate compliance requirements after
contract award

,B. Ignore minority participation goals because they are optional
recommendations only
C. Carefully review all procurement requirements, confirm subcontractor
qualifications, and verify bonding capacity before bid submission
D. Reduce labor costs below prevailing wage rates to remain competitive

C. Carefully review all procurement requirements, confirm subcontractor
qualifications, and verify bonding capacity before bid submission

The contractor must fully understand and comply with all bid specifications
before submitting a proposal. Public projects frequently require prevailing
wages, bonding, and participation goals, and failure to comply may result
in bid rejection, penalties, or contract termination.

2. A Texas general contractor is overseeing excavation activities near
underground utilities on a commercial project site. The excavation
subcontractor plans to begin trenching operations immediately to
maintain schedule deadlines. According to Texas safety requirements
and standard construction practices, what should occur BEFORE
excavation work begins?

A. Excavation may proceed if workers wear personal protective equipment
B. Utility locations should be identified through notification systems and site
verification procedures
C. Excavation can begin without inspection if the trench depth is less than 10

,feet
D. Only the project owner is responsible for locating underground utilities

B. Utility locations should be identified through notification systems and
site verification procedures

Excavation work presents serious hazards involving underground utilities
such as gas, water, and electrical lines. Contractors must contact utility
locating services and verify utility locations before digging to prevent
injuries, service interruptions, and property damage.

3. During construction of a multi-story office building in Texas, the
project architect rejects several installed structural steel members
because they do not meet specified tolerances. The subcontractor
argues that the deviations are minor and should be accepted. Under
standard contract administration procedures, who generally has
authority to determine whether work complies with the contract
documents?

A. The steel supplier
B. The subcontractor’s foreman
C. The architect or authorized design professional
D. The owner’s accountant

C. The architect or authorized design professional

, The architect or designated design professional typically has authority to
evaluate whether construction work conforms to the plans and
specifications. Contractors are obligated to correct defective or
nonconforming work at their expense if required by the contract.

4. A general contractor is calculating the estimated concrete quantity
needed for a rectangular slab measuring 120 feet long, 80 feet wide,
and 6 inches thick. Approximately how many cubic yards of concrete
are required for the slab?

A. 89 cubic yards
B. 133 cubic yards
C. 178 cubic yards
D. 240 cubic yards

C. 178 cubic yards

Concrete volume is calculated by converting thickness to feet and
multiplying length × width × thickness. The slab volume equals 120 × 80 ×
0.5 = 4,800 cubic feet. Dividing by 27 cubic feet per cubic yard gives
approximately 178 cubic yards.

5. A Texas contractor discovers that moisture intrusion is occurring
behind exterior wall cladding shortly after project completion.
Investigation reveals that flashing was improperly installed around
windows. Which construction principle was MOST likely violated?

Document information

Uploaded on
July 21, 2026
Number of pages
57
Written in
2025/2026
Type
Exam (elaborations)
Contains
Questions & answers
$25.49

Wrong document? Swap it for free Within 14 days of purchase and before downloading, you can choose a different document. You can simply spend the amount again.
Written by students who passed
Immediately available after payment
Read online or as PDF

Sold
1
Followers
0
Items
1110
Last sold
4 weeks ago


Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their tests and reviewed by others who've used these notes.

Didn't get what you expected? Choose another document

No worries! You can instantly pick a different document that better fits what you're looking for.

Pay as you like, start learning right away

No subscription, no commitments. Pay the way you're used to via credit card and download your PDF document instantly.

Student with book image

“Bought, downloaded, and aced it. It really can be that simple.”

Alisha Student

Working on your references?

Create accurate citations in APA, MLA and Harvard with our free citation generator.

Working on your references?

Frequently asked questions