New York Site Safety Manager (SSM) Questions and Answers Updated 2026/2027 Version | Verified Answers

Rating
-
Sold
-
Pages
33
Grade
A+
Uploaded on
21-07-2026
Written in
2025/2026

New York Site Safety Manager (SSM) Questions and Answers Updated 2026/2027 Version | Verified Answers 1. What is Section 3301 and 3302? - ANSWER Ch 33 = Safeguards During Construction or Demoltion 3301 = General 3302 = Definitions 2. What do you do when code does not specifically state inspection is needed on an equipment? - ANSWER [3301.4.1] Any equipment (except hand tools) that affects safety of public or property shall be inspected by a COMPETENT PERSON designated by the contractor using the equipment This inspection shall be documented in an inspection checklist signed and dated by the CP 3. Who is responsible for maintaining construction/demo signs? - ANSWER [3301.9] The permit holder for the construction/demo work If no active permits, then the building owner 4. Name the (8) items that need to be listed on a Project Information Panel - ANSWER [3301.9.1] Rendering, elevation drawing, or zoning diagram "Work in Progress" Title and specifying zoning use Anticipated project completion date Property owner's corporate name, address, phone # Website address or phone # to contact GC name and phone # "To anonymously report unsafe conditions..call 311" in English and Spanish Primary project permit (laminated) 5. What are the requirements for standpipe during new construction? - ANSWER [3303.8] When topmost working deck reaches 75ft above grade, a temp or perm standpipe is required - it must serve all floors that are at least 4 stories or 40 feet below working deck, whichever is less - must be painted red - in freezing conditions, standpipe must be dry system 6. What are the requirements for standpipe during full demo? - ANSWER [3303.8] - must be maintained as dry standpipe - must be capped floor below demo floor - red paint must be maintained - all remaining house check valves shall remain in place until demo completion 7. What pressure should the dry system air pressurized alarm be at ? - ANSWER [3303.8.1] 25 psig 8. What are the 3 requirements for temp hoist during construction? - ANSWER [3303.12.2] 1) When topmost working deck reaches 75ft, hoist must be installed to 40 feet above grade 2) When enlarging building height, hoist shall serve at least 4 stories or 48 feet below working deck, whichever is less *for structural steel building, it is 4 stories or 64 feet below working deck 3) once the topmost working deck is walkable, hoist must reach that floor within 2 weeks 9. What are requirements for temp hoist during demo? - ANSWER [3303.12.2.3] All floors that are 7 stories or 75 feet below topmost working deck shall be served by a hoist 10. What are the requirements for hoist during deep excavation? - ANSWER [3303.12.3] If the lowest level of building with footprint of 10,000SF+ reaches depth of 75 feet, hoist shall be available once the foundation is in place and the first elevated slab has been erected 11. What are the dimensions needed for stretcher accommodation in hoist? - ANSWER [3303.12.6] It must be capable of having (2) standing individuals and stretcher that is: 84" L x 24" W 12. When is a safety monitoring plan required? - ANSWER [3303.13.2] When work is interrupted/abandoned/discontinued for at least 3 months Plan must be prepared by qualified person and submitted to DOB by the owner 13. What are the 3 requirements of concrete washout water? - ANSWER [3303.15] 1) Cannot enter any sewer/basin/drain/enter ground 2) Must be contained in truck or watertight container (washout box) 3) Rinsing operations and containers must be located more than 30 feet from any sewer/drain 14. Name the 12 items required on the site safety log - ANSWER [3310.8.4] 1) Date and location of inspections performed 2) Date and names of individuals met with during meetings 3) Any unsafe acts/conditions and dates/locations of them 4) Companies and reps notified of unsafe acts/conditions 5) Dates of notification of unsafe acts/conditions 6) Dates of correction of unsafe acts/conditions 7) Any incident 8) Any violation, SWO, summons issued by DOB 9) Dates and location where horizontal and vertical safety netting has been installed 10) 11) 12) Date horizontal netting is removed Date when building reaches 75ft in height Date when building is topped off 15. What is Section BC 3311? - ANSWER Explosive Powered and Projectile Tools 16. What is Section BC 3312? - ANSWER Explosives and Blasting 17. What is Section BC 3313? - ANSWER Flammable and Combustible Mixtures, Compressed Gases, and other Hazardous Materials 18. What is Section BC 3314? - ANSWER Scaffolds

Show more Read less
Institution
New York Site Safety Manager
Course
New York Site Safety Manager

Content preview

New York Site Safety Manager (SSM)
Questions and Answers Updated
2026/2027 Version | Verified Answers


1. What is Section 3301 and 3302? - ANSWER ✅ Ch 33 = Safeguards During
Construction or Demoltion
3301 = General
3302 = Definitions


2. What do you do when code does not specifically state inspection is needed
on an equipment? - ANSWER ✅ [3301.4.1]
Any equipment (except hand tools) that affects safety of public or property
shall be inspected by a COMPETENT PERSON designated by the
contractor using the equipment
This inspection shall be documented in an inspection checklist signed and
dated by the CP


3. Who is responsible for maintaining construction/demo signs? - ANSWER ✅
[3301.9]
The permit holder for the construction/demo work
If no active permits, then the building owner


4. Name the (8) items that need to be listed on a Project Information Panel -
ANSWER ✅ [3301.9.1]
Rendering, elevation drawing, or zoning diagram
"Work in Progress" Title and specifying zoning use
Anticipated project completion date
Property owner's corporate name, address, phone #
Website address or phone # to contact

, GC name and phone #
"To anonymously report unsafe conditions..call 311" in English and Spanish
Primary project permit (laminated)




5. What are the requirements for standpipe during new construction? -
ANSWER ✅ [3303.8]
When topmost working deck reaches 75ft above grade, a temp or perm
standpipe is required
- it must serve all floors that are at least 4 stories or 40 feet below
working deck, whichever is less
- must be painted red
- in freezing conditions, standpipe must be dry system


6. What are the requirements for standpipe during full demo? - ANSWER ✅
[3303.8]
- must be maintained as dry standpipe
- must be capped floor below demo floor
- red paint must be maintained
- all remaining house check valves shall remain in place until demo
completion


7. What pressure should the dry system air pressurized alarm be at ? -
ANSWER ✅ [3303.8.1]
25 psig


8. What are the 3 requirements for temp hoist during construction? - ANSWER
✅ [3303.12.2]
1) When topmost working deck reaches 75ft, hoist must be
installed to 40 feet above grade
2) When enlarging building height, hoist shall serve at least 4
stories or 48 feet below working deck, whichever is less

, *for structural steel building, it is 4 stories or 64 feet below working deck
3) once the topmost working deck is walkable, hoist must reach that floor
within 2 weeks


9. What are requirements for temp hoist during demo? - ANSWER ✅
[3303.12.2.3]
All floors that are 7 stories or 75 feet below topmost working deck shall be
served by a hoist


10.What are the requirements for hoist during deep excavation? - ANSWER ✅
[3303.12.3]
If the lowest level of building with footprint of 10,000SF+ reaches depth of
75 feet, hoist shall be available once the foundation is in place and the first
elevated slab has been erected


11.What are the dimensions needed for stretcher accommodation in hoist? -
ANSWER ✅ [3303.12.6]
It must be capable of having (2) standing individuals and stretcher that is:
84" L x 24" W


12.When is a safety monitoring plan required? - ANSWER ✅ [3303.13.2]
When work is interrupted/abandoned/discontinued for at least 3 months
Plan must be prepared by qualified person and submitted to DOB by the
owner


13.What are the 3 requirements of concrete washout water? - ANSWER ✅
[3303.15]
1) Cannot enter any sewer/basin/drain/enter ground
2) Must be contained in truck or watertight container (washout
box)

, 3) Rinsing operations and containers must be located more than
30 feet from any sewer/drain


14.Name the 12 items required on the site safety log - ANSWER ✅ [3310.8.4]
1) Date and location of inspections performed
2) Date and names of individuals met with during meetings
3) Any unsafe acts/conditions and dates/locations of them
4) Companies and reps notified of unsafe acts/conditions
5) Dates of notification of unsafe acts/conditions
6) Dates of correction of unsafe acts/conditions
7) Any incident
8) Any violation, SWO, summons issued by DOB
9) Dates and location where horizontal and vertical safety netting
has been installed
10) Date horizontal netting is removed
11) Date when building reaches 75ft in height
12) Date when building is topped off


15.What is Section BC 3311? - ANSWER ✅ Explosive Powered and Projectile
Tools


16.What is Section BC 3312? - ANSWER ✅ Explosives and Blasting


17.What is Section BC 3313? - ANSWER ✅ Flammable and Combustible
Mixtures, Compressed Gases, and other Hazardous Materials


18.What is Section BC 3314? - ANSWER ✅ Scaffolds


19.When is a permit not required for a suspended scaffold? - ANSWER ✅
[3314.2]

Written for

Institution
New York Site Safety Manager
Course
New York Site Safety Manager

Document information

Uploaded on
July 21, 2026
Number of pages
33
Written in
2025/2026
Type
Exam (elaborations)
Contains
Questions & answers
$11.99
Get access to the full document:

Wrong document? Swap it for free Within 14 days of purchase and before downloading, you can choose a different document. You can simply spend the amount again.
Written by students who passed
Immediately available after payment
Read online or as PDF

Get to know the seller
Seller avatar
DrMwendwa
2.0
(2)

Get to know the seller

Seller avatar
DrMwendwa Oxford University
View profile
Follow You need to be logged in order to follow users or courses
Sold
3
Member since
5 months
Number of followers
0
Documents
443
Last sold
1 month ago
EXCELLENT ACHIEVERS LIBRARY

Dr. Mwendwa Test Banks & Practice Exams Graded A+ On this page you will find the latest exams, test banks, solution manuals, exam elaborations, and other study materials. Find study notes, exam answer packs, assignment-guided solutions, and more. Study faster & better. Always leave a review after purchasing any document so as to make sure our customers are 100% satisfied... All the best!!!!!! Your success is our priority. Let's achieve those top grades together!!!

Read more Read less
2.0

2 reviews

5
0
4
0
3
1
2
0
1
1

Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their tests and reviewed by others who've used these notes.

Didn't get what you expected? Choose another document

No worries! You can instantly pick a different document that better fits what you're looking for.

Pay as you like, start learning right away

No subscription, no commitments. Pay the way you're used to via credit card and download your PDF document instantly.

Student with book image

“Bought, downloaded, and aced it. It really can be that simple.”

Alisha Student

Working on your references?

Create accurate citations in APA, MLA and Harvard with our free citation generator.

Working on your references?

Frequently asked questions