Questions And Correct Answers
Voltage ride through capability of the plant must be approved by
ERCOT
Any resource or customer owned switching device that can interrupt flow
60kV/Greater must have an agreement with _____ to schedule outages on
TO
The resource entity representing a Non-Coordinated test must inform ERCOT
and the TO ___ hours prior to the proposed start of the test
2
Lagging reactive tests should be performed during __ load periods
High
Leading reactive tests should be performed during __ load periods
, Low
The ___ representing a generation resource shall be responsible for scheduling
reactive verification tests when requested by the resource entity
QSE
Resource entity owners of transmission facilities shall provide to ___ all
nominal transmission facility ratings
ERCOT
___ must notify ERCOT of any changes in its transmission facility status within
ten seconds
TO
Each ___ shall have a vegetation management program outlining procedures to
prevent transmission line contact with vegetation
Transmission Owner
The ERCOT LFC system shall deploy regulation service and __ __ energy service
to provide satisfactory frequency control