Written by students who passed Immediately available after payment Read online or as PDF Wrong document? Swap it for free 4.6 TrustPilot
logo-home
Exam (elaborations)

API 1169 PRACTICE EXAM 2026.pdf 1. Document information

Rating
-
Sold
-
Pages
5
Grade
A+
Uploaded on
19-07-2026
Written in
2025/2026

API 1169 PRACTICE EXAM 1. Document information

Institution
API 1169
Course
API 1169

Content preview

API 1169 PRACTICE EXAM 2026/2027 QUESTIONS AND
SOLUTIONS RATED A+
✔✔ASME B31.4 - ✔✔Standard Pipeline Transportation Systems for Liquids and
Slurries

✔✔ASME B31.8 - ✔✔Standard Gas Transmission and Distribution Piping Systems

✔✔29 CFR Part 1910 - ✔✔Regulation Occupational Safety and Health Standards

✔✔29 CFR Part 1926 - ✔✔Regulation Safety and Health Regulations for Construction

✔✔49 CFR Part 192 - ✔✔Regulation Transportation of Natural and Other Gas by
Pipeline

✔✔49 CFR Part 195 - ✔✔Regulation Transportation of Hazardous Liquids by Pipeline

✔✔White - ✔✔Proposed Excavation

✔✔Pink - ✔✔Temporary Survey Markings

✔✔Red - ✔✔Electrical

✔✔Yellow - ✔✔Gas, Oil, Steam, Petroleum or Gaseous Materials

✔✔Orange - ✔✔Communication, Alarm or Signal Lines

✔✔Blue - ✔✔Potable Water

✔✔Purple - ✔✔Reclaimed Water

✔✔Green - ✔✔Sewers and drain lines

✔✔Trenches _____ depth or Confined Spaces must be monitored before entry. Safe
oxygen levels are ________ - ✔✔4' 19.5% - 23.5%

✔✔Trenches _____ deep or greater require a protective system which can be sloping,
benching, trench boxes - ✔✔5'

✔✔Trenches _____ deep or greater require a protective system designed by a PE -
✔✔20'

, ✔✔4 soil types and sloping - ✔✔1. Rock=90 deg. or vertical 2. Type A=3/4:1 or 53 deg.
3. Type B=1.1 or 45 de. 4. Type C= 1 1/2:1 or 34 deg.

✔✔Trench Boxes must extend ____above outside soil level - ✔✔18"

✔✔In 29 CFR 1910 subpart ___ covers excavations - ✔✔P

✔✔Encroachment Area - ✔✔Area where the ground disturbance occurs within 50' of
centerline of ROW, facility or easement

✔✔Active Excavation Area - ✔✔Area where the edge of the disturbance is within 25' of
centerline of existing facilities

✔✔Excavation Tolerance Zone - ✔✔Area within 24" of facilities or the distance
mandated by state law, whichever is greater. NOTE: CGA & INGAA says 18".

✔✔When an excavation is within _____ of a pipeline facility an OQ qualified
representative shall be continuously present during all excavation and backfilling
activities to ensure that criteria is being met. - ✔✔10'

✔✔INGAA states that crossing company shall not permit soil disturbance within ____ of
the centerline of existing pipeline facilities without an owners rep being present. - ✔✔25'

✔✔Crossing angle - ✔✔As close to perpendicular as possible

✔✔ROW is established thru a written document known as the - ✔✔Easement

✔✔Plan devised between the Owner and crossing party to specify the details and
provisions under which the crossing construction shall occur - ✔✔Crossing plan

✔✔Hearing protection required in areas ____________ - ✔✔Noise level exceeds 85
dba over an 8 hour period. INGAA states during pressure testing to keep under 80 dba's

✔✔Flammable Liquids - ✔✔Class 1 liquids having a flash point below 100 deg F.
Gasoline.

✔✔Combustible Liquids - ✔✔Class 2 liquids having a flash point above 100 deg F.
Diesel, jet fuel motor oil

✔✔Hydro test parameters per 49 CFR 195 - ✔✔4 hrs @ 125% Max Operating Pressure
for above ground pipe. 8 hrs @ 110% MOP.

✔✔Remain _______ from any pipe being hydro-tested - ✔✔100'

Written for

Institution
API 1169
Course
API 1169

Document information

Uploaded on
July 19, 2026
Number of pages
5
Written in
2025/2026
Type
Exam (elaborations)
Contains
Questions & answers

Subjects

$17.49
Get access to the full document:

Wrong document? Swap it for free Within 14 days of purchase and before downloading, you can choose a different document. You can simply spend the amount again.
Written by students who passed
Immediately available after payment
Read online or as PDF

Get to know the seller

Seller avatar
Reputation scores are based on the amount of documents a seller has sold for a fee and the reviews they have received for those documents. There are three levels: Bronze, Silver and Gold. The better the reputation, the more your can rely on the quality of the sellers work.
BOARDWALK Havard School
View profile
Follow You need to be logged in order to follow users or courses
Sold
274
Member since
2 year
Number of followers
8
Documents
32861
Last sold
5 hours ago
5 STAR ACADEMY

Military With Touch of Academics Ace Your Exams With Top Quality study Notes And Paper✅✅ EVERYTHING IS GRADED A+✅✅ COLOUR YOUR GRADES WITH US , WE ARE HERE TO HELP YOU DONT BE RELACTANT TO REACH US

3.5

40 reviews

5
14
4
6
3
12
2
1
1
7

Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their tests and reviewed by others who've used these notes.

Didn't get what you expected? Choose another document

No worries! You can instantly pick a different document that better fits what you're looking for.

Pay as you like, start learning right away

No subscription, no commitments. Pay the way you're used to via credit card and download your PDF document instantly.

Student with book image

“Bought, downloaded, and aced it. It really can be that simple.”

Alisha Student

Working on your references?

Create accurate citations in APA, MLA and Harvard with our free citation generator.

Working on your references?

Frequently asked questions