Written by students who passed Immediately available after payment Read online or as PDF Wrong document? Swap it for free 4.6 TrustPilot
logo-home
Document preview thumbnail
Preview 4 out of 233 pages
Exam (elaborations)

Test Bank — Electrical Wiring Commercial, 18th Edition (Simmons, Mullin & Ode, 2023) | All Chapters 1–22 Covered

Document preview thumbnail
Preview 4 out of 233 pages

Original test bank for Electrical Wiring Commercial, 18th Edition by Simmons, Mullin & Ode (2023), covering commercial electrical installation, electrical plans and specifications, branch circuits, wiring methods, motors, feeders, grounding, lighting systems, overcurrent protection, standby power systems, low-voltage controls, HVAC electrical systems, and commercial photovoltaic installations. The test bank includes Chapter 1 Commercial Building Plans and Specifications; Chapter 2 Reading Electrical Working Drawings—Entry Level; Chapter 3 General Requirements for Conductors; Chapter 4 Branch Circuits; Chapter 5 Switches and Receptacles; Chapter 6 Wiring Methods; Chapter 7 Motor and Appliance Circuits; Chapter 8 Feeder Installation and Load Calculation; Chapter 9 Special Systems; Chapter 10 Working Drawings—Upper Level; Chapter 11 Special Circuits (Owner's Circuits); Chapter 12 Panelboard Selection and Installation; Chapter 13 The Electric Service and Grounding; Chapter 14 Lamps and Ballasts for Lighting; Chapter 15 Luminaires; Chapter 16 Emergency, Legally Required Standby and Optional Standby Power Systems; Chapter 17 Overcurrent Protection: Fuses and Circuit Breakers; Chapter 18 Short-Circuit Calculations and Coordination of Overcurrent Protective Devices; Chapter 19 Equipment and Conductor Short-Circuit Protection; Chapter 20 Low-Voltage Remote Control; Chapter 21 The Cooling System; and Chapter 22 Commercial Utility-Interactive Photovoltaic Systems, providing comprehensive coverage for commercial electrical wiring courses and licensing exam preparation.

Content preview

STUVIA?_APPROVED??

, STUVIA?_APPROVED??
TABLE OF CONTENTS
Test Bank: Electrical Wiring Commercial 18th Edition
Authors: Phil Simmons, Ray Mullin, Mark Ode



1. Commercial Building Plans and Specifications.
2. Reading Electrical Working Drawings--Entry Level.
3. General Requirements for Conductors.
4. Branch Circuits.
5. Switches and Receptacles.
6. Wiring Methods.
7. Motor and Appliance Circuits.
8. Feeder Installation and Load Calculation.
9. Special Systems.
10. Working Drawings--Upper Level.
11. Special Circuits (Owner's Circuits).
12. Panelboard Selection and Installation.
13. The Electric Service and Grounding.
14. Lamps and Ballasts for Lighting.
15. Luminaires.
16. Emergency, Legally Required Standby and Optional Standby Power Systems.
17. Overcurrent Protection: Fuses and Circuit Breakers.
18. Short-Circuit Calculations and Coordination of Overcurrent Protective Devices.
19. Equipment and Conductor Short-Circuit Protection.
20. Low-Voltage Remote Control.
21. The Cooling System.
22. Commercial Utility-Interactive Photovoltaic Systems.

, STUVIA?_APPROVED??
Name Clas Dat
: s: e:

Chapter 01 Commercial Building Plans and Specifications
1. Allowing metal shavings from drilling switchboard busing to fall onto energized parts of electrical equipment generally
results in a(n) , which can cause deadly burns.
a. lockout
b. arc blast
c. tagout
d. pressure
wave
ANSWER: b
POINTS: 1
REFERENCES: Safety in the Workplace
QUESTION TYPE: Multiple Choice
HAS VARIABLES: False
DATE CREATED: 7/7/2023 2:32 AM
DATE MODIFIED: 7/26/2023 9:23 PM

2. The NEC® defines a(n) as one who has skills and knowledge related to the construction and operation of electrical
equipment and installations and has received safety training to recognize and avoid the hazards involved.
a. qualified
person
b. engineer
c. expert
d. employee
ANSWER: a
POINTS: 1
REFERENCES: Safety in the Workplace
QUESTION TYPE: Multiple Choice
HAS VARIABLES: False
DATE CREATED: 7/7/2023 2:39 AM
DATE MODIFIED: 7/7/2023 3:59 AM

3. On large electrical installations, an arc flash can generate temperatures of .
a. 15,000°F (8,316°C)
b. 25,000°F (13871°C)
c. 35,000°F (19,427°C)
d. 45,000°F (24982°C)
ANSWER: c
POINTS: 1
REFERENCES: Safety in the Workplace
QUESTION TYPE: Multiple Choice
HAS VARIABLES: False
DATE CREATED: 7/7/2023 3:14 AM
DATE MODIFIED: 7/7/2023 3:14 AM

, STUVIA?_APPROVED??
Name Clas Dat
: s: e:

Chapter 01 Commercial Building Plans and Specifications
4. When turning a standard disconnect switch on, of the switch.
a. do not stand to the right
b. do not stand to the left
c. always stand in front
d. do not stand directly in
front
ANSWER: d
POINTS: 1
REFERENCES: Safety in the Workplace
QUESTION TYPE: Multiple Choice
HAS VARIABLES: False
DATE CREATED: 7/7/2023 3:20 AM
DATE MODIFIED: 7/7/2023 3:21 AM

5. Which item in the general clauses and conditions is of value to the contractor and the estimator only?
a. Proposal
b. Schedule of
drawings
c. Agreement
d. Notice to bidders
ANSWER: d
POINTS: 1
REFERENCES: Commercial Building Specifications
QUESTION TYPE: Multiple Choice
HAS VARIABLES: False
DATE CREATED: 7/7/2023 3:21 AM
DATE MODIFIED: 7/7/2023 3:57 AM

6. According to the supplementary general conditions, who is responsible for any utilities that are damaged?
a. the municipal
government
b. the contractor
c. the crew
d. the site owner
ANSWER: b
POINTS: 1
REFERENCES: Commercial Building Specifications
QUESTION TYPE: Multiple Choice
HAS VARIABLES: False
DATE CREATED: 7/7/2023 3:22 AM
DATE MODIFIED: 7/7/2023 3:57 AM

7. The construction plans for a building are often called .
.. Page 2

Document information

Uploaded on
July 17, 2026
Number of pages
233
Written in
2025/2026
Type
Exam (elaborations)
Contains
Questions & answers
$27.99

Wrong document? Swap it for free Within 14 days of purchase and before downloading, you can choose a different document. You can simply spend the amount again.
Written by students who passed
Immediately available after payment
Read online or as PDF

Seller avatar
Reputation scores are based on the amount of documents a seller has sold for a fee and the reviews they have received for those documents. There are three levels: Bronze, Silver and Gold. The better the reputation, the more your can rely on the quality of the sellers work.
MedGeek
4.2
(93)
Sold
1325
Followers
864
Items
2380
Last sold
4 days ago


Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their tests and reviewed by others who've used these notes.

Didn't get what you expected? Choose another document

No worries! You can instantly pick a different document that better fits what you're looking for.

Pay as you like, start learning right away

No subscription, no commitments. Pay the way you're used to via credit card and download your PDF document instantly.

Student with book image

“Bought, downloaded, and aced it. It really can be that simple.”

Alisha Student

Working on your references?

Create accurate citations in APA, MLA and Harvard with our free citation generator.

Working on your references?

Frequently asked questions