Written by students who passed Immediately available after payment Read online or as PDF Wrong document? Swap it for free 4.6 TrustPilot
logo-home
Document preview thumbnail
Preview 4 out of 36 pages
Exam (elaborations)

NETA 3 Exam 1 Questions with Correct Answers

Document preview thumbnail
Preview 4 out of 36 pages

NETA 3 Exam 1 Questions with Correct Answers

Content preview

NETA 3 Exam 1 Questions with Correct
Answers
The alternate source for emergency systems are required to be equipped with ground-

fault protection of equipment.

False

Which ANSI/IEEE standard covers SF6 circuit breakers?

C37.04

You measure the winding resistance of a 12.4kV, 1000kVA, Delta-Delta connected

transformer with a 100A test set. H1-H2 measures 42.0 microhms, H2-H3 measures 41.9

microhms, and H3-H1 measures 84.0 microhms. What can you conclude from these

readings?

One phase of the transformer is open.

When monitoring for entries involving a decent into atmospheres that may be

stratisfied, the envelope should be tested at a distance of approximately _____ feet in the

direction of travel and to each side.

4

The transformer manufacturer should be consulted if winding-resistance test values

vary by more than _____ percent from factory test values or between adjacent phases

according to NETA acceptance testing standards.

2

A DC shunt motor should never be operated:

with the field circuit open

,What is the expected torque (pound-feet) value of a 3/8" Grade 5 bolt?

20

The generally accepted limits of deviation from the nominal 60Hz utility power

frequency is:

.50Hz

Power Factor testing is least effective on which of the following?

MV Cable

Which of the following insulating liquid tests is optional when maintenance testing a

13.2kV-4.16kV 1500kVA transformer with silicone fluid per NETA standards?

ASTM D1298

Panelboards equipped with snap switches of rating 30 amps or less shall be provided

with over-current protection of not more than _____ .

200 amps

Underground service conductors between the terminals of service equipment and

service lateral or underground service conductors are termed as _____ .

Service Entrance Conductors

What is a dual element fuse used for?

Operate with a temporary overload

The full-load current for a single-phase alternating current 115 volt, 1 horsepower

motor is which of the following:

16 A

,Infrared surveys should be performed during periods of maximum possible loading but

not less than _____ % of rated load of the electrical equipment being inspected.

40

Decreasing the opening time of the overcurrent protective device will decrease Arc-

Flash hazards.

true

In a wye connected system, without neutral grounding, zero sequence currents are:

zero

When evaluating insulation test results on a medium-voltage, air-magnetic circuit

breaker, what quantity is evaluated?

watts-loss

In accordance with NETA and IEEE standards, the correct acceptance test voltage (dc)

for 35KV rated EPR 133% insulation level cable is?

124kV

Calculate the circuit time constant of an inductor having resistance value of 100 ohms

and an inductance value of 4 Henry:

0.04 sec

T=L/R

Transformer polarity:

Is of concern when multiple sets of primary and secondary windings are interconnected

Identify the least reliable power system arrangement:

, Radial w/ Primary Selectivity

The hot collar bushing test should be performed using which of the following test

modes?

UST

GST

GST-g

R rated fuses are used for:

Protection for motors

R-rated fuses provide required short-circuit protection for medium voltage motors, motor

controllers and associated circuitry. Relays provide both overload protection and locked rotor

protection to the motor.

Which of the following would be a factor in choosing between 100%, 133%, and 173%

Medium voltage cable for a power system?

Ground Fault protection

During the performance of a thermographic scan of similar components within the

switchboard that are under similar load, at what temperature difference does NETA

recommend investigation?

1-3 deg C

In calculating the thickness of insulators for high-voltage AC power lines, which type of

measurement is the best to use for voltage?

Peak

Document information

Uploaded on
July 17, 2026
Number of pages
36
Written in
2025/2026
Type
Exam (elaborations)
Contains
Questions & answers
$15.99

Wrong document? Swap it for free Within 14 days of purchase and before downloading, you can choose a different document. You can simply spend the amount again.
Written by students who passed
Immediately available after payment
Read online or as PDF

Seller avatar
Reputation scores are based on the amount of documents a seller has sold for a fee and the reviews they have received for those documents. There are three levels: Bronze, Silver and Gold. The better the reputation, the more your can rely on the quality of the sellers work.
KenAli
2.6
(18)
Sold
101
Followers
5
Items
21107
Last sold
2 days ago


Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their tests and reviewed by others who've used these notes.

Didn't get what you expected? Choose another document

No worries! You can instantly pick a different document that better fits what you're looking for.

Pay as you like, start learning right away

No subscription, no commitments. Pay the way you're used to via credit card and download your PDF document instantly.

Student with book image

“Bought, downloaded, and aced it. It really can be that simple.”

Alisha Student

Working on your references?

Create accurate citations in APA, MLA and Harvard with our free citation generator.

Working on your references?

Frequently asked questions