Written by students who passed Immediately available after payment Read online or as PDF Wrong document? Swap it for free 4.6 TrustPilot
logo-home
Document preview thumbnail
Preview 4 out of 37 pages
Exam (elaborations)

ACI FLATWORK EXAM ALL POSSIBLE QUESTIONS AND ANSWERS WITH COMPLETE SOLUTIONS VERIFIED

Document preview thumbnail
Preview 4 out of 37 pages

ACI FLATWORK EXAM ALL POSSIBLE QUESTIONS AND ANSWERS WITH COMPLETE SOLUTIONS VERIFIED

Content preview

ACI FLATWORK EXAM ALL POSSIBLE
QUESTIONS AND ANSWERS WITH
COMPLETE SOLUTIONS VERIFIED

⩥ 100.
Answer: (Ch. 1, #2) If the crew can place and finish 100yd^3 (m^3) of
concrete per hour, the producer's rate should be about ____ yd^3(m^3)
per hour.


⩥ False (sold by volume).
Answer: (Ch 1, #3) True or False: Concrete is sold by the ton.


⩥ pump, place, and finish.
Answer: (Ch. 1, #4) Delays in discharging concrete trucks can result in
the concrete being hard to:


⩥ A) 407.41; B) 297.
Answer: (Ch. 1, #5)
A) Inch/Pound: For a concrete floor slab that is 6 in. thick, 200ft long,
and 100 ft wide you should order ____ yd^3 of concrete, assuming a
10% waste factor.

,B) Metric: For a concrete floor slab that is 150 mm thick, 60 m long, and
30 m wide you should order ____ m^3 of concrete, assuming a 10%
waste factor.


⩥ as one truck is finishing, the other is ready to unload concrete.
Answer: (Ch. 1, #6) When there is room for two concrete trucks ready to
discharge into a pump hopper, placement is faster because:


⩥ 1.5.
Answer: (Ch. 1, #7) Concrete from a ready mix truck must be
completely discharged within ____ hours after water has been added at
the plant.


⩥ batch ticket.
Answer: (Ch. 1, #8) You can tell when water was added to the concrete
truck by looking at the:


⩥ 15 minutes.
Answer: (Ch. 1, #9) When concrete for a slab placement will be
discharged from the truck chute, truck arrivals should usually be spaced
about:


⩥ True.

,Answer: (Ch. 1, #10) True or False: When finishers get behind because
the concrete is setting faster than expected and the placing crew is also
shorthanded, one solution is slowing the concrete delivery rate to match
worker output.


⩥ False (Standard is to order 10% to 15% *more* than measured
volume for small orders and 5 to 10% more than measured volume for
large orders to account for subgrade settlement, uneven subgrade,
spillage, and waste.).
Answer: (Ch. 1, #11) True or False: In deciding how much concrete to
order for a floor placement, you should calculate the number of cubic
yards (cubic meters) needed to fill the forms, then order two or three
cubic yards (cubic meters) less so you don't waste concrete that is not
needed.


⩥ preconstruction conference.
Answer: (Ch. 1, #12) The question "What finisher or finishers can
request the addition of water to the concrete truck on site?" Should be
answered at the _________ __________.


⩥ True.
Answer: (Ch. 2, #1) True or False: Concrete made with portland cement
will set and harden while underwater.


⩥ Type I.

, Answer: (Ch. 2, #2) If a concrete slab on ground won't be exposed to
sulfates, the cement used is most likely to be:


⩥ portland.
Answer: (Ch. 2, #3) Fly ash may be added to concrete from a fly ash silo
at the batch plant or from a silo containing a _______ cement.


⩥ 0.75 to 1.5 in. (19 to 38 mm.).
Answer: (Ch. 2, #4) Most concrete used in slabs on ground has course
aggregate with a maximum size of:


⩥ True.
Answer: (Ch. 2, #5) True or False: Sand for concrete used in slabs on
ground is easier to finish when it has close to the largest allowable
amount of material passing the No. 50 and No. 100 sieves.


⩥ False (Too many small particles will *increase* the amount of water
needed to make the concrete workable.).
Answer: (Ch. 2, #6) True or False: Increasing the amount of sand in a
concrete usually decreases the amount of water needed to make the
concrete workable.


⩥ an air-entraining agent.

Document information

Uploaded on
July 15, 2026
Number of pages
37
Written in
2025/2026
Type
Exam (elaborations)
Contains
Questions & answers
$13.99

Wrong document? Swap it for free Within 14 days of purchase and before downloading, you can choose a different document. You can simply spend the amount again.
Written by students who passed
Immediately available after payment
Read online or as PDF

Seller avatar
Reputation scores are based on the amount of documents a seller has sold for a fee and the reviews they have received for those documents. There are three levels: Bronze, Silver and Gold. The better the reputation, the more your can rely on the quality of the sellers work.
GradeGalaxy
4.4
(9)
Sold
131
Followers
3
Items
44308
Last sold
19 hours ago


Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their tests and reviewed by others who've used these notes.

Didn't get what you expected? Choose another document

No worries! You can instantly pick a different document that better fits what you're looking for.

Pay as you like, start learning right away

No subscription, no commitments. Pay the way you're used to via credit card and download your PDF document instantly.

Student with book image

“Bought, downloaded, and aced it. It really can be that simple.”

Alisha Student

Working on your references?

Create accurate citations in APA, MLA and Harvard with our free citation generator.

Working on your references?

Frequently asked questions