3 components of a project Correct Answers product, resources,
schedule
accountability Correct Answers often a problem with student
projects
active training Correct Answers -most effective means of
delivering training
-better retention of information when involved
-getting participants to do the work
active training methods andmaterials Correct Answers -
videos:appeal to visual leaners or of the computer generation.
not meant to stand alone.
-instrumentation: paper based or computer based device used to
gather information; surveys, checklists, inventories,
questionairres
-lectures: small place in overall training design
Andragogical model Correct Answers -adults are 100%
responsible for learning
-self directed and want a voice
-adults want KAS that they need and for work
-motivates
-self directed
-role of experience
-want learning experience to be practical and realistic, problem
centered rather than subject
-adults want immediate real world applications
, -internal factors
andragogy Correct Answers Andra(man)
baby boomers Correct Answers 1946-1964
-interactive, nonauthoritarian, interaction, teamwork
netoworking opportunities
-participants as equals, shares personal examples
-interactive; hate roll plays
choosing a design Correct Answers -choose design that fits
your purpose
-need methods that are the best way to go
-in the workplace, you may be given tools but you still need to
assure they give the best data
-time and funds are part of your decision
collecting data Correct Answers
concerns for active training Correct Answers -setting
-time available
-quality of strategies
-appropriateness
-your preparation level
Constraints of a project Correct Answers all projects must
work with constraints, you plan for these (time management)
cooperative learning Correct Answers instructional use of
small groups so thst students work together to maximize their
own and each others learning