VA DEQ SWM INSPECTOR EXAM WITH
CORRECT ACTUAL QUESTIONS AND
CORRECTLY WELL DEFINED ANSWERS
LATEST ALREADY GRADED A+
Does a SWM plan address runoff during or after
construction? - ANSWERS-post-construction
What is the lower limit of imperviousness which could
result in stream degradation? - ANSWERS-10%
If land disturbance occurs as a result of emergency work,
what is the timeline for advising the VSMP authority of the
disturbance? - ANSWERS-within 7 days of commencing the
LDA and a permit application must be submitted within 30
days
DEQ is responsible for enforcing the ______ while locality
_______ are responsible for enforcing local ordinances. -
ANSWERS-Construction GP, VSMP
, BMPs use these three mechanisms to control pollution: -
ANSWERS-Infiltration, settling, and vegetative uptake
How long does a locality VSMP authority have to determine
the completeness of a SWM plan? - ANSWERS-15 days
Every year, the locality VSMP must submit information to
DEQ. When is this due, and what info must be provided? -
ANSWERS-Due by Oct. 1, and must include: new types of
SWM facilities, geographic coordinates of them, acres
treated, and surface waters/karst features into which they
discharge.
A locality VSMP must be at least as stringent as what state
permit? - ANSWERS-The construction GP
What is the maximum penalty that may be imposed under
the stormwater management act? - ANSWERS-$32,500
How long must a VSMP authority retain a registration
statement? - ANSWERS-At least three years after project
completion or state permit termination.
CORRECT ACTUAL QUESTIONS AND
CORRECTLY WELL DEFINED ANSWERS
LATEST ALREADY GRADED A+
Does a SWM plan address runoff during or after
construction? - ANSWERS-post-construction
What is the lower limit of imperviousness which could
result in stream degradation? - ANSWERS-10%
If land disturbance occurs as a result of emergency work,
what is the timeline for advising the VSMP authority of the
disturbance? - ANSWERS-within 7 days of commencing the
LDA and a permit application must be submitted within 30
days
DEQ is responsible for enforcing the ______ while locality
_______ are responsible for enforcing local ordinances. -
ANSWERS-Construction GP, VSMP
, BMPs use these three mechanisms to control pollution: -
ANSWERS-Infiltration, settling, and vegetative uptake
How long does a locality VSMP authority have to determine
the completeness of a SWM plan? - ANSWERS-15 days
Every year, the locality VSMP must submit information to
DEQ. When is this due, and what info must be provided? -
ANSWERS-Due by Oct. 1, and must include: new types of
SWM facilities, geographic coordinates of them, acres
treated, and surface waters/karst features into which they
discharge.
A locality VSMP must be at least as stringent as what state
permit? - ANSWERS-The construction GP
What is the maximum penalty that may be imposed under
the stormwater management act? - ANSWERS-$32,500
How long must a VSMP authority retain a registration
statement? - ANSWERS-At least three years after project
completion or state permit termination.