API 579
Answer
Fitness For Service (FFS)
api 580
Answer
Risked Based Inspection
API 660
Answer
API Design for Fabrication of Exchangers
API 2201
Answer
Welding on In-Service Equipment Containing Flammables
ASME Sect V
Answer
NDE Procedure Guidelines
ASME Sect 8 DIV 2
Answer
Alternative Evaluation for Pits and LTA's
1
,ASME Sec IX
Answer
Welder & Weld Procedure Qualifcation
AIRR
Answer
API 510 Scope (Alteration,Inspection,Repair,Rerate)
JUIC
Answer
API 510 AI's Employer (Jurisdiction, User, Insurance company, Contractor)
A JOC
Answer
API 510 Repair Organization (ASME stamp holder, authorized by jurisdiction, owner, contrac-
tor)
SPEC
Answer
How to determine corrosion rate for new service or change in service (same or similar ser-
vice, published data, exam w/ in 3-6 months, or corrosion specialist)
TIRE
Answer
Primary responsibilities of API 510 AI (Testing, Inspection,Repairs,Examination)
Physical Change
2
, Answer
Define - Alteration
Restore - Suitable
Answer
Define - Repair
Probability & Consequence
Answer
Define - RBI's two Primary Factors
Qualified & Experienced
Answer
PRD's - Requirements for Relief Device Repair Organization
Performance
Answer
PRD's - How relief device intervals are determined
0"
Answer
Max length of a crack, IP or Incomplete Fusion allowed on a new weld
3 light beads / bands
Answer
Smoothness of relief device seating surfaces
3