BUSI 313 Ch.13 Question and answers verified to pass 2026 A project monitoring system involves which of the following? - correct answer Deciding what data to collect Collecting and analyzing data Reporting on the data In a project monitoring system, data collected from ____ activity duration, resource usage, and costs are compared against ____ activity duration, resource usage, and costs. - correct answer actual; planned Which of the following might collect data on a project? - correct answer Project team; project manager; contractors; Engineers Project progress reports are designed and communicated in ____. - correct answer written or oral form steps for measuring and evaluating project performance - correct answer Setting a baseline plan Measuring progress and performance Comparing plan against actual Taking action A system for determining what data to collect, analyzing that data; and reporting current progress is called a project ____ system. - correct answer monitoring In project monitoring information systems, ___ deter

Content preview

BUSI 313 Ch.13 Question and answers
verified to pass 2026
A project monitoring system involves which of the following? - correct answer ✔Deciding what data to
collect

Collecting and analyzing data

Reporting on the data



In a project monitoring system, data collected from ____ activity duration, resource usage, and costs are
compared against ____ activity duration, resource usage, and costs. - correct answer ✔actual;
planned



Which of the following might collect data on a project? - correct answer ✔Project team; project
manager; contractors; Engineers



Project progress reports are designed and communicated in ____. - correct answer ✔written or oral
form



steps for measuring and evaluating project performance - correct answer ✔Setting a baseline plan

Measuring progress and performance

Comparing plan against actual

Taking action



A system for determining what data to collect, analyzing that data; and reporting current progress is
called a project ____ system. - correct answer ✔monitoring



In project monitoring information systems, ___ determine(s) what data to collect. - correct answer
✔the metrics used for project control

, What is the second step in building a project monitoring information system? - correct answer ✔Data
collection and analysis



Control is a process of comparing actual performance against plan to identify deviations, evaluate
possible alternative courses of actions, and take appropriate corrective action. - correct answer ✔true



In the project control process, the ____ provides the project control process with the elements for
measuring performance. - correct answer ✔baseline



Time and budgets are _________ measures of performance that readily fit into the integrated
information system. - correct answer ✔quantitative



The third step in the project control process of the measurement and evaluation of project performance
is ___. - correct answer ✔comparing planned against actual performance



The fourth step in the project control process of the measurement and evaluation of project
performance is to ____________. - correct answer ✔take necessary corrective actions



A major goal of progress reporting is to catch any negative variances from plan as early as possible to
determine if corrective action is necessary. The project network schedule, derived from the ______,
serves as the baseline to compare against actual performance. - correct answer ✔Work breakdown
structure (WBS)



How far into the future does a tracking Gantt chart go at the start of the project? - correct answer ✔It
depends



Measuring progress and performance is the _______ step in creating a project control system for
measuring and evaluating project performance. - correct answer ✔second

Document information

Uploaded on
July 11, 2026
Number of pages
7
Written in
2025/2026
Type
Exam (elaborations)
Contains
Questions & answers
$16.49

Wrong document? Swap it for free Within 14 days of purchase and before downloading, you can choose a different document. You can simply spend the amount again.
Written by students who passed
Immediately available after payment
Read online or as PDF

Seller avatar
Reputation scores are based on the amount of documents a seller has sold for a fee and the reviews they have received for those documents. There are three levels: Bronze, Silver and Gold. The better the reputation, the more your can rely on the quality of the sellers work.
STUVIAMAESTRO254
2.6
(40)
Sold
168
Followers
98
Items
9654
Last sold
1 month ago



Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their tests and reviewed by others who've used these notes.

Didn't get what you expected? Choose another document

No worries! You can instantly pick a different document that better fits what you're looking for.

Pay as you like, start learning right away

No subscription, no commitments. Pay the way you're used to via credit card and download your PDF document instantly.

Student with book image

“Bought, downloaded, and aced it. It really can be that simple.”

Alisha Student

Working on your references?

Create accurate citations in APA, MLA and Harvard with our free citation generator.

Working on your references?

Frequently asked questions