Written by students who passed Immediately available after payment Read online or as PDF Wrong document? Swap it for free 4.6 TrustPilot
logo-home
Document preview thumbnail
Preview 2 out of 7 pages
Exam (elaborations)

NICET LEVEL 1 HIGHWAY CONSTRUCTION CORRECT FINALS QUESTIONS AND ANSWERS SURE

Document preview thumbnail
Preview 2 out of 7 pages

NICET LEVEL 1 HIGHWAY CONSTRUCTION CORRECT FINALS QUESTIONS AND ANSWERS SURE

Content preview

NICET LEVEL 1 HIGHWAY CONSTRUCTION
CORRECT FINALS QUESTIONS AND ANSWERS
SURE A+
✔✔plan - ✔✔The Contractor's proposed methods of performing work including but not
limited to materials, equipment, personnel, and schedules.

✔✔Plans. - ✔✔The advertised plans as amended by addenda and Change of Plan.
This includes the version of the Standard Details specified on the key sheet.

✔✔Professional Engineer - ✔✔A person licensed to practice engineering in the State of
New Jersey.

✔✔Project. - ✔✔The specific section of highway or other public improvement
constructed under the Contract.

✔✔Project Limits - ✔✔These are shown on the key sheet and modified as follows: 1.
The areas of construction operations and areas used by the Contractor to perform the
work. If only a portion of a lane or shoulder of a road is being constructed, they include
all lanes and shoulders of the roadway. 2. Where only one direction of a road is being
constructed, and the road is divided by a median, island, or barrier curb, they include all
of the lanes in that direction and the median. Otherwise, they include all lanes in both
directions. 3. The longitudinals include all safety devices and signs excluding signs
greater than 1,600 feet outside the ones shown on the key sheet. 4. Areas within the
ROW provided for the Contractor's use.

✔✔Proposal - ✔✔The schedule of Items and estimate of the various quantities and
kinds of Work to be performed for which bid prices are invited. It also includes the
location and description of the Project and the date and time of the opening of bids.

, ✔✔qualified products list (QPL) - ✔✔A list of specific qualified products maintained by
the Department for use in the Work. Available at the following website:
http://www.state.nj.us/transportation/eng/materials/qualified

✔✔Resident Engineer - ✔✔The Department's field representative having direct
supervision of the administration of the Contract

✔✔Right-Of-Way (ROW) - ✔✔The land, property, or interest therein acquired for or
devoted to transportation purposes or construction of a public improvement (see Figure
101-1).

✔✔Right-Of-Way Plans - ✔✔The most current revisions of the General Property Parcel
Maps and Entire Tract Maps approved for use in setting the existing and proposed
ROW, including setting out or laying out the various easements within which Items are
to be constructed or used to enable construction.

✔✔Special Provisions. - ✔✔Project specific specifications, non-standard specifications,
and requirements for the performance of prescribed work which, in addition to the
Standard Specifications, is part of the Contract documents.

✔✔Specifications. - ✔✔The compilation of provisions and requirements for the
performance of prescribed work contained in the Standard Specifications, Special
Provisions, and Electrical Materials Specifications as modified by addenda

✔✔State - ✔✔The State of New Jersey

✔✔State Funded Project Attachments - ✔✔Attachments to the Contract Special
Provision document, used for wholly State Funded contracts

✔✔subcontractor - ✔✔An individual, firm, partnership, corporation, joint venture, or any
acceptable combination thereof, to which the Contractor shares part of the Work
pursuant to 108.01.

✔✔subgrade - ✔✔The surface of the roadbed upon which the first layer of the
pavement structure is constructed (see Figure 101-1).

✔✔Substantial Completion - ✔✔When all work is complete, with the exception of
landscaping Items listed in 811.04, removal of SESC measures, FINAL CLEANUP, and
repair of unacceptable work; provided the RE has determined that: 1. The Project is
safe and convenient for use by the public. 2. Failure to complete work and repairs
excepted above will not result in the deterioration of other completed work. 3. The value
of the remaining landscaping work, removal of SESC measures, repairs, and FINAL
CLEANUP is less than 2 percent of the Total Adjusted Contract Price.

Document information

Uploaded on
July 8, 2026
Number of pages
7
Written in
2025/2026
Type
Exam (elaborations)
Contains
Questions & answers
$17.99

Wrong document? Swap it for free Within 14 days of purchase and before downloading, you can choose a different document. You can simply spend the amount again.
Written by students who passed
Immediately available after payment
Read online or as PDF

Seller avatar
Reputation scores are based on the amount of documents a seller has sold for a fee and the reviews they have received for those documents. There are three levels: Bronze, Silver and Gold. The better the reputation, the more your can rely on the quality of the sellers work.
BOARDWALK
3.5
(40)
Sold
281
Followers
10
Items
32848
Last sold
2 days ago


Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their tests and reviewed by others who've used these notes.

Didn't get what you expected? Choose another document

No worries! You can instantly pick a different document that better fits what you're looking for.

Pay as you like, start learning right away

No subscription, no commitments. Pay the way you're used to via credit card and download your PDF document instantly.

Student with book image

“Bought, downloaded, and aced it. It really can be that simple.”

Alisha Student

Working on your references?

Create accurate citations in APA, MLA and Harvard with our free citation generator.

Working on your references?

Frequently asked questions