1. Which NYC agency is primarily responsible for overseeing
b b b b b b b b
bpublic construction projects?
b b
A. Department of Environmental Protection b b b
B. Department of Transportation b b
C. Department of Design and Construction (DDC) b b b b b
D. Department of Buildings b b
The DDC manages and oversees municipal construction projects,
b b b b b b b
bensuring design and compliance standards are met.
b b b b b b
2. What is the primary purpose of a construction contract bond?
b b b b b b b b b
A. To fund project operations
b b b
, B. To ensure project completion and protect against contractor
b b b b b b b
b default
C. To hire subcontractors
b b
D. To obtain building permits
b b b
Construction bonds provide financial security that the contractor will
b b b b b b b b
bcomplete the work per contract terms.
b b b b b
3. In NYC municipal construction, which document defines the project
b b b b b b b b
bscope, schedule, and budget?
b b b
A. Blueprints
B. Permit application b
C. Contract specifications b
D. Work order b
Contract specifications clearly outline project expectations, including
b b b b b b
bscope, timeline, and cost.
b b b
4. Which method is commonly used to control project risks in municipal
b b b b b b b b b b
bconstruction?
A. Value engineering b
B. Risk management plan
b b
C. Permit acquisition b
D. Material testing b
A risk management plan identifies, evaluates, and mitigates
b b b b b b b
bpotential project risks. b b
,5. Under NYC labor laws, what is the prevailing wage requirement?
b b b b b b b b b
A. The average wage in private sector construction
b b b b b b
B. Minimum federal wage b b
C. The standard wage rates set for public projects
b b b b b b b
D. Union-negotiated overtime rates b b
Prevailing wage laws ensure workers on municipal projects are paid
b b b b b b b b b
standard rates for their classification.
b b b b b
6. Which type of contract shifts the cost risk to the contractor?
b b b b b b b b b b
A. Time and materials
b b
B. Fixed-price (lump sum) b b
C. Cost-plus
D. Unit price b
A fixed-price contract places the cost risk on the contractor, who
b b b b b b b b b b
must complete work for the agreed sum.
b b b b b b b
7. What is the NYC Local Law 196 focus?
b b b b b b b
A. Construction site aesthetics b b
B. Worker safety and protection from falls
b b b b b
C. Environmental sustainability b
D. Contract bidding process b b
Local Law 196 mandates safety measures to prevent worker falls and
b b b b b b b b b b
improve safety on construction sites.
b b b b b
8. Which project delivery method allows the design and construction to
b b b b b b b b b
overlap?
b
, A. Design-bid-build
B. Design-build
C. Construction management at risk b b b
D. Lump-sum
Design-build integrates design and construction phases to improve
b b b b b b b
b schedule efficiency. b
9. What is the primary purpose of the NYC construction permit?
b b b b b b b b b
A. To approve contractor wages
b b b
B. To fund materials
b b
C. To authorize legal construction activity
b b b b
D. To assign subcontractors
b b
Permits ensure that construction meets building codes, zoning, and
b b b b b b b b
b safety regulations.
b
10. In project scheduling, what does the critical path indicate?
b b b b b b b b
A. Least important tasks
b b
B. Maximum budget items b b
C. Sequence of tasks that determines project duration
b b b b b b
D. Tasks assigned to subcontractors
b b b
The critical path identifies the longest sequence of dependent tasks,
b b b b b b b b b
b dictating project completion time.
b b b
11. Which document is used to formally change the scope of a
b b b b b b b b b b
b municipal construction project?b b
A. Work order b