b b b b
Questions And Correct Answers (Verified
b b b b b
Answers) Plus Rationales 2026|2027 Q&A
b b b b b
| Instant Download Pdf
b b b b
1. Which of the following is the first step before starting a
b b b b b b b b b b b
demolition project?
b b
A. Begin removing walls immediately
b b b
B. Shut down nearby streets
b b b
C. Conduct a site survey and structural assessment
b b b b b b
D. Remove all debris from site
b b b b
Rationale: A site survey identifies structural stability, utilities,
b b b b b b b
b hazardous materials, and potential risks before demolition starts.
b b b b b b b
2. Before demolition, which type of utility must be verified as
b b b b b b b b b
b disconnected?
A. Telephone only b
, B. Cable TV only b b
C. Electric, gas, water, and sewer
b b b b
D. Air conditioning
b
Rationale: All utilities must be safely shut off to prevent explosions,
b b b b b b b b b b
b electrocution, or flooding. b b
3. OSHA requires a competent person to inspect the demolition site for
b b b b b b b b b b
b hazards:
A. Monthly
B. Daily
C. Weekly
D. Once per project
b b
Rationale: Daily inspections ensure ongoing safety as site conditions
b b b b b b b b
b change during demolition.
b b
4. What document is necessary to begin demolition in Ohio?
b b b b b b b b
A. OSHA report b
B. Demolition permit from the local authority
b b b b b
C. EPA emission summary
b b
D. Contractor’s insurance policy b b
Rationale: Local building departments issue demolition permits after
b b b b b b b
b verifying compliance with regulations.
b b b
,5. Which of the following is required when asbestos is present?
b b b b b b b b b
A. Regular dust suppression b b
B. Certified asbestos abatement prior to demolition
b b b b b
C. Continue work with respirators b b b
D. Notify neighbors b
Rationale: Federal and Ohio EPA laws mandate asbestos removal by
b b b b b b b b b
b certified professionals before demolition.
b b b
6. What is the primary purpose of a demolition plan?
b b b b b b b b
A. Estimate project costs b b
B. Outline safe methods and sequences of demolition
b b b b b b
C. Determine disposal fees b b
D. Identify subcontractors b
Rationale: The demolition plan ensures safety and efficiency by
b b b b b b b b
b detailing step-by-step procedures.
b b
7. What PPE must be worn during mechanical demolition?
b b b b b b b
A. Hard hat, steel-toed boots, gloves, eye and ear protection
b b b b b b b b
B. Safety vest only b b
C. Face mask and shorts
b b b
D. Regular clothing b
, Rationale: Full protective gear is essential to protect workers from
b b b b b b b b b
b falling debris and dust.
b b b
8. In Ohio, who enforces workplace safety during demolition?
b b b b b b b
A. State EPA b
B. OSHA
C. Local building department
b b
D. Department of Transportation b b
Rationale: OSHA governs worker safety standards for all demolition
b b b b b b b b
b operations.
9. What should be done before demolishing load-bearing walls?
b b b b b b b
A. Remove them immediately
b b
B. Install temporary supports or shoring
b b b b
C. Wet the area
b b
D. Place caution tape
b b
Rationale: Shoring maintains structural stability and prevents collapse.
b b b b b b b
10. Dust control during demolition is typically achieved by:
b b b b b b b
A. Water spraying or misting systems
b b b b
B. Air blowers
b
C. Fans