CON 3900 Quiz With Complete Solutions
Market research is conducted during which phase of acquisition? -
| | | | | | | | | |
CORRECT ANSWER✔✔-All phases of the acquisition
| | | | |
What is the use of a procedure that is inconsistent with the FAR? -
| | | | | | | | | | | | | |
CORRECT ANSWER✔✔-Deviation
|
Simplified Acquisition Procedures (SAP) should: - CORRECT
| | | | | | |
ANSWER✔✔-Promote competition to the maximum extent practicable | | | | | |
What is the tool (form) used by DoD to apply a structured profit/fee? -
| | | | | | | | | | | | | |
CORRECT ANSWER✔✔-DD Form 1547, Weighted Guidelines Method
| | | | | |
What type(s) of contracts can be awarded when acquiring commercial
| | | | | | | | | |
items of supply? - CORRECT ANSWER✔✔-Only firm-fixed-price contracts
| | | | | | |
|or fixed-price contracts with economic price adjustment
| | | | | |
When using invitations for bids (IFBs), what type(s) of contracts can be
| | | | | | | | | | | |
awarded? - CORRECT ANSWER✔✔-Only firm-fixed-price contracts or
| | | | | | |
fixed-price contracts with economic price adjustment
| | | | |
,Which of the following is correct regarding the DFARS Procedures
| | | | | | | | | |
Guidance and Information (PGI)? - CORRECT ANSWER✔✔-The DFARS
| | | | | | | |
PGI is a companion resource to the DFARS
| | | | | | |
Which of the following statements is accurate regarding the
| | | | | | | | |
Government's policy on contract modifications? - CORRECT | | | | | | |
ANSWER✔✔-Only contracting officers acting within the scope of their | | | | | | | | |
authority are authorized to execute contract modifications on behalf of
| | | | | | | | | |
the Government
|
Which of the following is accurate about unilateral modifications? -
| | | | | | | | | |
CORRECT ANSWER✔✔-Are only signed by a Government contracting
| | | | | | | |
officer, not the contractor
| | |
Except when authorized otherwise, a Government contract: - CORRECT
| | | | | | | | |
ANSWER✔✔-Must be in writing | | |
Which is NOT a type of contracting officer? - CORRECT ANSWER✔✔-
| | | | | | | | | |
Executive contracting officer | |
With respect to the requirements of law, executive orders, regulations,
| | | | | | | | | |
and all other applicable procedures, prior to signing a contract, a
| | | | | | | | | | |
contracting officer must: - CORRECT ANSWER✔✔-Ensure that each has
| | | | | | | | |
been met |
, Joan stated that she was working on selecting solicitation provisions.
| | | | | | | | | |
With this in mind, you know the contract: - CORRECT ANSWER✔✔-Has
| | | | | | | | | | |
not been awarded
| |
A program manager asked John whether a contract clause is only used
| | | | | | | | | | | |
in the contract or if it applies to the solicitation as well. John correctly
| | | | | | | | | | | | | |
answered by replying with which of the following statements? -
| | | | | | | | | |
CORRECT ANSWER✔✔-A contract clause is a term or condition used in
| | | | | | | | | | |
contracts, or in both solicitations and contracts, that applies after
| | | | | | | | | |
contract award or both before and after award
| | | | | | |
A contractor failed to deliver a commercial item within the time
| | | | | | | | | | |
specified by the contract. As the Government contracting officer, you
| | | | | | | | | |
plan to terminate the contract. What type of termination would you
| | | | | | | | | | |
proceed with? - CORRECT ANSWER✔✔-Termination for Cause
| | | | | |
Which FAR part sets forth the basic policies and general information
| | | | | | | | | | |
about the Federal Acquisition Regulations System? - CORRECT
| | | | | | | |
ANSWER✔✔-FAR Part 1 | |
Which of the following statements best conveys the convention at FAR
| | | | | | | | | | |
1.108(b), delegation of authority? - CORRECT ANSWER✔✔-Each
| | | | | | |
authority is delegable unless specifically stated otherwise
| | | | | |
How many parts are there in the FAR? - CORRECT ANSWER✔✔-53
| | | | | | | | | |
Market research is conducted during which phase of acquisition? -
| | | | | | | | | |
CORRECT ANSWER✔✔-All phases of the acquisition
| | | | |
What is the use of a procedure that is inconsistent with the FAR? -
| | | | | | | | | | | | | |
CORRECT ANSWER✔✔-Deviation
|
Simplified Acquisition Procedures (SAP) should: - CORRECT
| | | | | | |
ANSWER✔✔-Promote competition to the maximum extent practicable | | | | | |
What is the tool (form) used by DoD to apply a structured profit/fee? -
| | | | | | | | | | | | | |
CORRECT ANSWER✔✔-DD Form 1547, Weighted Guidelines Method
| | | | | |
What type(s) of contracts can be awarded when acquiring commercial
| | | | | | | | | |
items of supply? - CORRECT ANSWER✔✔-Only firm-fixed-price contracts
| | | | | | |
|or fixed-price contracts with economic price adjustment
| | | | | |
When using invitations for bids (IFBs), what type(s) of contracts can be
| | | | | | | | | | | |
awarded? - CORRECT ANSWER✔✔-Only firm-fixed-price contracts or
| | | | | | |
fixed-price contracts with economic price adjustment
| | | | |
,Which of the following is correct regarding the DFARS Procedures
| | | | | | | | | |
Guidance and Information (PGI)? - CORRECT ANSWER✔✔-The DFARS
| | | | | | | |
PGI is a companion resource to the DFARS
| | | | | | |
Which of the following statements is accurate regarding the
| | | | | | | | |
Government's policy on contract modifications? - CORRECT | | | | | | |
ANSWER✔✔-Only contracting officers acting within the scope of their | | | | | | | | |
authority are authorized to execute contract modifications on behalf of
| | | | | | | | | |
the Government
|
Which of the following is accurate about unilateral modifications? -
| | | | | | | | | |
CORRECT ANSWER✔✔-Are only signed by a Government contracting
| | | | | | | |
officer, not the contractor
| | |
Except when authorized otherwise, a Government contract: - CORRECT
| | | | | | | | |
ANSWER✔✔-Must be in writing | | |
Which is NOT a type of contracting officer? - CORRECT ANSWER✔✔-
| | | | | | | | | |
Executive contracting officer | |
With respect to the requirements of law, executive orders, regulations,
| | | | | | | | | |
and all other applicable procedures, prior to signing a contract, a
| | | | | | | | | | |
contracting officer must: - CORRECT ANSWER✔✔-Ensure that each has
| | | | | | | | |
been met |
, Joan stated that she was working on selecting solicitation provisions.
| | | | | | | | | |
With this in mind, you know the contract: - CORRECT ANSWER✔✔-Has
| | | | | | | | | | |
not been awarded
| |
A program manager asked John whether a contract clause is only used
| | | | | | | | | | | |
in the contract or if it applies to the solicitation as well. John correctly
| | | | | | | | | | | | | |
answered by replying with which of the following statements? -
| | | | | | | | | |
CORRECT ANSWER✔✔-A contract clause is a term or condition used in
| | | | | | | | | | |
contracts, or in both solicitations and contracts, that applies after
| | | | | | | | | |
contract award or both before and after award
| | | | | | |
A contractor failed to deliver a commercial item within the time
| | | | | | | | | | |
specified by the contract. As the Government contracting officer, you
| | | | | | | | | |
plan to terminate the contract. What type of termination would you
| | | | | | | | | | |
proceed with? - CORRECT ANSWER✔✔-Termination for Cause
| | | | | |
Which FAR part sets forth the basic policies and general information
| | | | | | | | | | |
about the Federal Acquisition Regulations System? - CORRECT
| | | | | | | |
ANSWER✔✔-FAR Part 1 | |
Which of the following statements best conveys the convention at FAR
| | | | | | | | | | |
1.108(b), delegation of authority? - CORRECT ANSWER✔✔-Each
| | | | | | |
authority is delegable unless specifically stated otherwise
| | | | | |
How many parts are there in the FAR? - CORRECT ANSWER✔✔-53
| | | | | | | | | |