Written by students who passed Immediately available after payment Read online or as PDF Wrong document? Swap it for free 4.6 TrustPilot
logo-home
Document preview thumbnail
Preview 3 out of 27 pages
Exam (elaborations)

BLACK SPECTACLES PJM QUIZ 1 QUESTIONS WITH CORRECT ANSWERS

Document preview thumbnail
Preview 3 out of 27 pages

BLACK SPECTACLES PJM QUIZ 1 QUESTIONS WITH CORRECT ANSWERS

Content preview

LEED certified


Give this one a try later!


40-49 Points




During construction on a new mixed use development, an architect and their
structural engineering consultant perform a site visit to observe construction
progress. The engineer determines that the concrete slabs need additional testing to
verify compliance with project specifications. The architect has informed both the
owner and contractor of this request, and the contractor has notified the
subcontractor who installed the work in question. The project team operates under
standard AIA contracts.
Who is responsible for organizing and coordinating the testing of the work?

,Give this one a try later!


A201 is clear that the contractor must coordinate the testing of the work
unless other arrangements have been made. This is true also of scenarios
involving construction managers.




An architect is reviewing a contractor's bid for a design-bid-build project. The
contractor has included a contingency in their bid price.
Which of the following costs or occurrences is the contingency intended to cover?
Check the three that apply.


Give this one a try later!


Errors in contractor pricing, Costs related to dispute resolution, Contractor
errors during construction




Per the architectural drawings, the height for several light switches in accessible
spaces were to be mounted at 48" AFF max. The electrical drawings show the
switches mounted at 50" AFF max, but the architect missed this mistake. The
contractor missed the discrepancy as well, and followed the electrical drawings. The
architect's drawings show the correct mounting height. Who is mostly liable for the
mistake?


Give this one a try later!


C401 would apply in this situation. Section 1.4 states that "The consultant is
an independent contractor" and "The architect shall not be responsible for
the acts or omissions of the consultant." Therefore, the electrical engineer is
responsible.

, To comply with ADA requirements for the recreation center, which authority should
the architect confer with?


Give this one a try later!


Building Department




A project manager is reviewing a list of closeout procedures as a project nears the
end of construction administration.
Which of the following are the architect's responsibilities prior to project completion?
Check the three that apply.


Give this one a try later!


The owner cannot waive the requirements to comply with plumbing code,
Final project inspection, Contractor's final application for payment review




An architect is creating the project manual for a commercial project. The design team
is using the standard A101, B101, and A201 agreements for the basis of their contracts.
Where would the supplementary conditions be located within the project manual?


Give this one a try later!


The supplementary conditions are modifications or supplements to the
general conditions and are found therein.




Based on the site plan and program requirements, what team members should the
architect include?

Document information

Uploaded on
July 7, 2026
Number of pages
27
Written in
2025/2026
Type
Exam (elaborations)
Contains
Questions & answers
$10.50

Wrong document? Swap it for free Within 14 days of purchase and before downloading, you can choose a different document. You can simply spend the amount again.
Written by students who passed
Immediately available after payment
Read online or as PDF

Seller avatar
Reputation scores are based on the amount of documents a seller has sold for a fee and the reviews they have received for those documents. There are three levels: Bronze, Silver and Gold. The better the reputation, the more your can rely on the quality of the sellers work.
scholarmotivator
4.1
(16)
Sold
148
Followers
48
Items
6079
Last sold
1 week ago



Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their tests and reviewed by others who've used these notes.

Didn't get what you expected? Choose another document

No worries! You can instantly pick a different document that better fits what you're looking for.

Pay as you like, start learning right away

No subscription, no commitments. Pay the way you're used to via credit card and download your PDF document instantly.

Student with book image

“Bought, downloaded, and aced it. It really can be that simple.”

Alisha Student

Working on your references?

Create accurate citations in APA, MLA and Harvard with our free citation generator.

Working on your references?

Frequently asked questions