Written by students who passed Immediately available after payment Read online or as PDF Wrong document? Swap it for free 4.6 TrustPilot
logo-home
Document preview thumbnail
Preview 4 out of 44 pages
Exam (elaborations)

VA Contractors License Exam – Virginia Board Comprehensive Practice Questions and Verified Answers, Full-Length Study Guide (Exam Preparation Material)

Document preview thumbnail
Preview 4 out of 44 pages

This document provides an extensive collection of VA Contractors License exam questions with verified answers, covering key areas such as licensing laws, building permits, OSHA safety regulations, contracts, financial management, and project estimating. It includes both theoretical and calculation-based questions to reinforce understanding of real-world construction and business scenarios. The content also addresses critical topics like recovery fund rules, tax obligations, insurance, labor laws, and project scheduling, making it a complete and practical resource for exam preparation and contractor certification.

Content preview

VA DEQ ESC Inspector Exam EXAM
WITH 100% VERIFIED QUESTIONS AND
CORRECT SOLUTIONS



VESCP

Virginia Erosion and Sediment Control Program



- Administered by counties/cities (must), towns (may)

- MUST BE APPROVED




Minimum Standard 1

Stabilization



permanent or temporary soil stabilization shall be applied to denuded areas within
seven days after final grade is reached on any portion of the site; temporary soil
stabilization shall be applied within seven days to denuded areas that may not be at
final grade but will remain dormant for longer than 14 days; permanent stabilization
shall be applied to areas that are to be left dormant for more than one year




Site NOT at Final Grade

- stabilize in 14 days

- temporarily seed

- mulch

- permanently stabilize if dormant > 1 year

,Site at Final Grade

- stabilize in 7 days (recommended immediately)

- permanently or temporarily seed and mulch

- mulch/matting/straw




Minimum Standard 2

Stock Piles, Waste and Borrow Areas



during construction, soil stock piles and borrow areas shall be stabilized or protected
with sediment trapping measures



mulch prevents erosion by protecting the surface from raindrop impact and silt fence
intercepts and detains from disturbed areas




Minimum Standard 3

Permanent Vegetation



permanent vegetation cover shall be established on denuded areas not otherwise
permanently stabilized (permanent vegetation shall not be considered established until
a ground cover is achieved that is uniform, mature enough to survive, and will inhibit
erosion there is no % associated with this)

,reduce erosion and decrease sediment yield from disturbed area



this is the standard used to verify that a site is ready for release of bonds or surety




Minimum Standard 4

First-Step Measures



Sediment basins and traps, perimeter dikes, sediment barriers and other measures
intended to trap sediment shall be constructed as a first step in any land-disturbing
activity and shall be made functional before upslope land disturbance takes place



a certain amount of initial land disturbance may be required to provide access for
equipment to install the perimeter controls, but site clearing and grading should be kept
to a minimum until the perimeter controls are in place



intercepts and detains small amounts of sediment from disturbed areas during
construction operation to prevent sediment from leaving the site and decrease velocity
of sheet flows and low-to-moderate level channel flow




Perimeter Controls

assures that sediment does not leave the perimeter of the land-disturbing area once site
clearing, grading, and construction commences



Examples: silt fences, sediment traps, sediment basins, construction entrance,
temporary diversions, diversions

, Minimum Standard 5

Earthen Structure Stabilization



stabilization measures shall be applied to earthen structures such as dams, dikes, and
diversions immediately after installation



reduce erosion and sedimentation and reduce damage from sediment and runoff to
downstream or off-site areas




Minimum Standard 6

Traps and Basins



sediment traps and basins shall be designed and constructed based upon the total
drainage area (not just disturbed area) to be served by the trap or basin




Sediment Traps

minimum storage capacity shall be 134 cubic yards per acre of drainage area and shall
only control drainage areas less than 3 acres



stone outlet = trap

Document information

Uploaded on
July 6, 2026
Number of pages
44
Written in
2025/2026
Type
Exam (elaborations)
Contains
Questions & answers
$13.49

Wrong document? Swap it for free Within 14 days of purchase and before downloading, you can choose a different document. You can simply spend the amount again.
Written by students who passed
Immediately available after payment
Read online or as PDF

Seller avatar
Reputation scores are based on the amount of documents a seller has sold for a fee and the reviews they have received for those documents. There are three levels: Bronze, Silver and Gold. The better the reputation, the more your can rely on the quality of the sellers work.
destinykerrie
4.0
(3)
Sold
14
Followers
0
Items
1251
Last sold
1 week ago


Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their tests and reviewed by others who've used these notes.

Didn't get what you expected? Choose another document

No worries! You can instantly pick a different document that better fits what you're looking for.

Pay as you like, start learning right away

No subscription, no commitments. Pay the way you're used to via credit card and download your PDF document instantly.

Student with book image

“Bought, downloaded, and aced it. It really can be that simple.”

Alisha Student

Working on your references?

Create accurate citations in APA, MLA and Harvard with our free citation generator.

Working on your references?

Frequently asked questions