C795 Ucertify Extra QUESTION AND
VERIFIED CORRECT ANSWERS
GRADED A+ [LATEST UPDATE] 100%
GUARANTEED PASS
Over the next weekend, your team is scheduled to perform tests that include shutting down the
live site and bringing the alternate site up to full operation. Which test will be performed? -
CORRECT ANSWER-full-interruption test
Question 29 :The business continuity committee has developed the business impact analysis
(BIA), identified the preventative controls that can be implemented, and developed the
recovery strategies. Next, the committee should develop a contingency plan.
Which teams should be included in this plan's development to aid in the execution of the final
plan?
restoration team
damage assessment team
salvage team
risk management team
incident response team - CORRECT ANSWER-The teams that should be included in the
contingency plan's development to aid in the execution of the final plan are the restoration,
damage assessment, and salvage teams.
Which backup facility is owned by the company and can be brought online relatively easily? -
CORRECT ANSWER-redundant site
,You need to ensure that all systems, networks, and major applications can be recovered. What
should you create or perform? - CORRECT ANSWER-contingency plan
What is NOT an example of an operational control? - CORRECT ANSWER-a business continuity
plan
Question 33 :Which plan ensures that a vital corporate position is filled in the event it is vacated
during a disaster? - CORRECT ANSWER-executive succession plan
Question 34 :Which term refers to the amount of time a company can tolerate the outage of a
certain asset, entity, or service? - CORRECT ANSWER-maximum tolerable downtime
Question 35 :Which term is an estimate of the amount of time a piece of equipment will last
and is usually determined by the equipment vendor or a third party? - CORRECT ANSWER-MTBF
Mean time between failures (MTBF) is an estimate of the amount of time a piece of equipment
will last and is usually determined by the equipment vendor or a third party.
Question 36 :Which of the following business continuity exercises can be quite involved and
should be performed annually? - CORRECT ANSWER-disaster simulation testing
Question 37 :Recently, flooding damaged the building that houses your company's data center.
Your team has been asked to determine which functions were affected by the flooding, and
which functions are most critical. Which disaster recovery step are you performing? - CORRECT
ANSWER-damage assessment
According to the business continuity plan, this week your team must complete a test of specific
systems to ensure their operation at alternate facilities. The results of the test must be
, compared with the live environment. Which test are you completing? - CORRECT ANSWER-
parallel test
___________a computer that is hacked when a malicious program is installed on it and
remotely triggered - CORRECT ANSWER-Botnet -
________ is a software application that displays advertisements while the application is
executing - CORRECT ANSWER-Adware -
A ________ is a program that spreads itself through network connections - CORRECT ANSWER-
Worm -
_________a collection of programs that grants a hacker administrative access to a computer or
network - CORRECT ANSWER-Rootkit -
Backdoor - a developer hook in a system or application that allows developers to circumvent
normal authentication
Logic bomb - a program that executes when a certain predefined event occurs
Spyware - a program that monitors and tracks user activities
Trojan horse - a program that infects a system under the guise of another legitimate program -
CORRECT ANSWER-The Different (4) types of malware
Question 41 :Which of the following should be members of the Computer Security Incident
Response Team (CSIRT)?
IT department member