EXAM QUESTIONS AND CORRECT ANSWERS
(VERIFIED ANSWERS) Q&A 2026 |INSTANT
DONLOAD PDF
1. What is the primary role of a construction supervisor?
A. Perform all manual labor
B. Oversee project execution and workforce
C. Design architectural drawings only
D. Approve government permits
Rationale: Supervisors manage site operations, safety, and
coordination.
Correct Answer: B
2. Which document defines project scope?
A. Work schedule
B. Contract documents
C. Safety manual
D. Inspection report
Rationale: Scope is outlined in contract documents.
Correct Answer: B
3. OSHA primarily focuses on:
,A. Tax compliance
B. Workplace safety
C. Building design
D. Material pricing
Rationale: OSHA regulates occupational safety.
Correct Answer: B
4. Critical path in scheduling refers to:
A. Cheapest activities
B. Longest sequence of tasks
C. Optional tasks
D. Safety procedures
Rationale: It determines project duration.
Correct Answer: B
5. A blueprint is:
A. Financial report
B. Construction drawing set
C. Legal permit
D. Safety checklist
Rationale: Blueprints are technical drawings.
Correct Answer: B
,6. PPE stands for:
A. Project Planning Equipment
B. Personal Protective Equipment
C. Public Project Estimate
D. Primary Process Execution
Rationale: PPE protects workers on site.
Correct Answer: B
7. Concrete curing refers to:
A. Mixing cement
B. Hardening process control
C. Painting concrete
D. Breaking concrete
Rationale: Curing maintains moisture for strength.
Correct Answer: B
8. Most common construction hazard is:
A. Water shortage
B. Falls from height
C. Paperwork delay
D. Lighting issues
Rationale: Falls are leading site injuries.
Correct Answer: B
, 9. What is a change order?
A. Site cleanup plan
B. Modification to contract work
C. Material delivery note
D. Safety inspection
Rationale: It alters original contract scope.
Correct Answer: B
10. Reinforced concrete contains:
A. Wood fibers
B. Steel bars
C. Plastic sheets
D. Glass pieces
Rationale: Steel increases tensile strength.
Correct Answer: B
11. Purpose of site inspection is to:
A. Increase costs
B. Ensure compliance and quality
C. Delay work
D. Replace workers