CERTIFICATION EXAM QUESTIONS AND CORRECT
ANSWERS (VERIFIED ANSWERS) Q&A 2026
|INSTANT DOWNLOAD PDF
1. What is the primary purpose of an Asbestos Management
Plan (AMP)?
A. To remove all asbestos immediately
B. To manage asbestos-containing materials safely in place
C. To increase building renovation speed
D. To reduce construction costs
Rationale: An AMP focuses on safe management rather than
automatic removal of asbestos materials.
Correct answer: B
2. Which federal regulation primarily governs asbestos
management in schools?
A. OSHA 1910.120
B. EPA AHERA
C. Clean Air Act Section 112
D. CERCLA
,Rationale: AHERA specifically addresses asbestos in school
buildings.
Correct answer: B
3. What does ACM stand for?
A. Airborne Containment Material
B. Asbestos Control Method
C. Asbestos-Containing Material
D. Approved Construction Material
Rationale: ACM refers to any material containing asbestos
fibers.
Correct answer: C
4. Which condition indicates friable asbestos?
A. Cannot be crushed by hand
B. Easily crumbles under hand pressure
C. Encapsulated in epoxy
D. Sealed behind drywall
Rationale: Friable asbestos releases fibers easily when
disturbed.
Correct answer: B
5. Who is responsible for developing an Asbestos
Management Plan in schools?
,A. Certified Industrial Hygienist
B. Building occupants
C. Designated Asbestos Management Planner
D. Local fire department
Rationale: AHERA requires a qualified asbestos management
planner.
Correct answer: C
6. What is the first step in asbestos inspection?
A. Removal of suspect materials
B. Sampling all building materials
C. Identification of suspect ACM
D. Encapsulation of materials
Rationale: The process begins with identifying suspect
materials.
Correct answer: C
7. Which agency enforces occupational asbestos exposure
limits in the workplace?
A. EPA
B. OSHA
C. CDC
D. HUD
, Rationale: OSHA sets and enforces workplace exposure limits.
Correct answer: B
8. What is the purpose of encapsulation in asbestos
management?
A. Destroy asbestos fibers
B. Replace ACM completely
C. Seal asbestos materials to prevent fiber release
D. Increase airflow in buildings
Rationale: Encapsulation seals ACM to prevent fiber release.
Correct answer: C
9. What is the recommended action when ACM is in good
condition and undisturbed?
A. Immediate removal
B. Encapsulation only
C. Leave in place with periodic surveillance
D. Demolition
Rationale: Intact ACM is often safer when left undisturbed
under management.
Correct answer: C
10. What is a key element of an asbestos inspection report?