CMGT385 FINAL EXAM REVIEW

Content preview

CMGT385 FINAL EXAM REVIEW


Contract - Answers - An enforceable agreement that defines the relationship, roles, and
responsibilities between two parties.

Elements of Contract Formation - Answers - The key requirements: Offer, Acceptance,
and Consideration (often called Mutual Assent, Consideration, and Capacity).

Mutual Assent - Answers - The 'meeting of the minds,' requiring a valid offer and an
unqualified acceptance of the same terms.

Consideration - Answers - Something of value given by each party to the other, creating
a bargain-for-exchange.

Statute of Frauds - Answers - Law requiring certain types of contracts, such as those
that cannot be completed within one year, to be in writing to be enforceable.

Prime Agreement - Answers - The main contract between the Owner and the
Contractor/CM/GC.

Subcontract - Answers - The contract between the Contractor/CM/GC and a
Subcontractor.

AIA A201 - Answers - The widely used General Conditions of the Contract for
Construction, which governs the basic relationship between the Owner, Contractor, and
Architect.

Promissory Estoppel - Answers - A legal principle that prevents a party from breaking a
promise if the other party reasonably relied on that promise to their detriment.

Breach of Contract - Answers - A failure, without legal excuse, to perform any promise
that forms all or part of a contract.

D-B-B (Design-Bid-Build) - Answers - The traditional project delivery method with
separate contracts for design and construction.

DB (Design-Build) - Answers - A project delivery method where one entity contracts with
the owner to provide both design and construction services.

CM/GC (CM@R) - Answers - Construction Manager/General Contractor or CM at Risk;
acts as an advisor during design and as the contractor during construction.

CM as Agent - Answers - A Construction Manager who acts purely as an advisor to the
owner and does not hold the trade contracts.

, IPD (Integrated Project Delivery) - Answers - A delivery method where key participants
are bound by a single contract and share risk and reward.

Lump-Sum (Fixed Price) - Answers - A pricing method where the contractor agrees to
complete the work for a single, fixed price.

Cost-Plus - Answers - A pricing method where the contractor is reimbursed for all
incurred costs plus an agreed-upon fee.

Guaranteed Maximum Price (GMP) - Answers - A fixed price ceiling for a Cost-Plus
contract; the contractor is responsible for costs that exceed this price (barring contract
changes).

Unit Pricing - Answers - A pricing method where the contractor is paid a specific price
for each measured unit of work (e.g., price per square foot).

Privity of Contract - Answers - The direct legal relationship between two parties that
allows them to enforce contractual rights and remedies against each other.

Project Delivery Method - Answers - The overall process for organizing, contracting for,
and completing a construction project.

Defined Term - Answers - A word or phrase given a specific, controlling meaning within
the contract (often capitalized).

Ambiguity - Answers - A contractual term is susceptible to more than one reasonable
interpretation.

Parol Evidence Rule - Answers - A rule that generally bars extrinsic evidence (like
verbal agreements) that contradicts or modifies the final written agreement.

Integrated Contract - Answers - A contract intended by the parties to be the complete
and final expression of their entire agreement.

Contra Proferentem - Answers - A rule of interpretation that states if a contract is
ambiguous, it should be construed against the party who drafted it.

Spearin Doctrine - Answers - An owner who provides design plans and specifications
implicitly warrants that they are suitable for their intended purpose.

Order of Precedence - Answers - Rules established in a contract for determining which
document governs in case of conflict (e.g., specifications over drawings).

Delegated Design - Answers - A risk where the contractor assumes design liability for a
specific portion of the work (e.g., fire sprinklers).

Document information

Uploaded on
July 4, 2026
Number of pages
9
Written in
2025/2026
Type
OTHER
Person
Unknown
$14.49
Get access to the full document:

Wrong document? Swap it for free Within 14 days of purchase and before downloading, you can choose a different document. You can simply spend the amount again.
Written by students who passed
Immediately available after payment
Read online or as PDF

Get to know the seller

Seller avatar
Reputation scores are based on the amount of documents a seller has sold for a fee and the reviews they have received for those documents. There are three levels: Bronze, Silver and Gold. The better the reputation, the more your can rely on the quality of the sellers work.
GEEKA YALA UNIVERSITY
View profile
Follow You need to be logged in order to follow users or courses
Sold
2123
Member since
4 year
Number of followers
1446
Documents
56359
Last sold
9 hours ago

3.8

360 reviews

5
179
4
61
3
48
2
17
1
55

Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their tests and reviewed by others who've used these notes.

Didn't get what you expected? Choose another document

No worries! You can instantly pick a different document that better fits what you're looking for.

Pay as you like, start learning right away

No subscription, no commitments. Pay the way you're used to via credit card and download your PDF document instantly.

Student with book image

“Bought, downloaded, and aced it. It really can be that simple.”

Alisha Student

Working on your references?

Create accurate citations in APA, MLA and Harvard with our free citation generator.

Working on your references?

Frequently asked questions