CMGT 385 STUDY GUIDE

Negligence - Answers - The failure to meet or act in accordance with the minimum level
of care expected of a "competent" person in a given field.

Tort - Answers - An act (or neglectful act) that leads to a type of legal civil wrongdoing

Strict liability - Answers - An individual (or company) may be held liable for damages
regardless of negligence, intent, or fault.

Breach of contract - Answers - Failure to comply with a contractual obligation.

Contract - Answers - A legal enforceable set of obligations between parties

Offer - Answers - A promise to do or refrain from doing a specific action

Acceptance - Answers - Legal agreement to the terms of the offer

Consideration - Answers - Something of value one party pays to the other for
completion of the obligations set in the offer

Parol Evidence rule - Answers - A legal rule prohibiting evidence being submitted to
modify or alter a contract after it have been executed

Privity - Answers - a legal relationship between parties listed on the contract (ie; parties
in privity of a contract may enforce the contract to seek damages based on said
contract)

Spearin doctrine - Answers - rule that the owner has an obligation to provide the
contractor with accurate plans and specs.

GMP - Answers - A pricing method in which the owner will pay the contractor at cost
plus aa predetermined fee, up to the guaranteed maximum price. Any cost beyond the
GMP is the responsibility of the contractor

Design-Bid-Build - Answers - Most common project delivery system in which the owner
maintains separate contracts with the design team and the contractor. Once design is
complete, it is put out to bid, awarded then built

Integrated Project Delivery - Answers - A delivery system which includes all building
personnel from the early stages to optimize the project. Carries high risk

Unit price contract - Answers - A pricing method in which the owner and contractor
agree on a price per unit of certain elements of a construction project. High risk of
quantity estimating error. Common in heavy civil jobs.

, Mechanics' lien - Answers - A legal claim against property that a subcontractor has
performed worked on, but has not rightly been paid for, as the subcontractor has no
privity of contract with the owner

Promissory estoppel - Answers - Principle that a promise can be legally enforced, if said
promise was reasonably relied on. (eg: subcontractor held to submitted bid).

Bid protests - Answers - A right afforded to a bidder who was not awarded a project to
protest a winning bid. Must claim that the winning bid was unresponsive or that that
winning bidder was not responsible. Bid protest also maintains a strict time frame, and
in some cases may not be worth the cost of pursuing

Responsive bidder - Answers - is in strict compliance with the instructions to bidder

Responsible bidder - Answers - A responsible bidder is one who can be depended upon
to complete the project. May include factors such as financial stability, past
performance, or even contractor reputation.

Commercial General Liability - Answers - protects against bodily injury and property
damage

Workers Compensation - Answers - Covers injuries that employees obtain in their scope
work

Builders Risk - Answers - Covers damage to work finished prior to project completion.
Does not include design or workmanship

Vehicle - Answers - Legally required in every state. Policies vary greatly

Property - Answers - Protects property from theft/vandalism

Specialty Items - Answers - Protects a unique and integral piece of machinery

Indemnity - Answers - A contractual obligation that one party must compensate the loss
incurred by another party due to the original party's actions or negligence

Change orders - Answers - An agreed upon formal change in the scope of work, due to
design error, owner changes or a number of other issues

Construction change directives - Answers - When a change in the work cannot be
agreed upon by all parties, owner and architect can issue a CCD, in which the
contractor must perform the work, and the compensation is resolved at a later time.

Document information

Uploaded on
July 4, 2026
Number of pages
5
Written in
2025/2026
Type
OTHER
Person
Unknown
$12.99
Get access to the full document:

Wrong document? Swap it for free Within 14 days of purchase and before downloading, you can choose a different document. You can simply spend the amount again.
Written by students who passed
Immediately available after payment
Read online or as PDF

Get to know the seller

Seller avatar
Reputation scores are based on the amount of documents a seller has sold for a fee and the reviews they have received for those documents. There are three levels: Bronze, Silver and Gold. The better the reputation, the more your can rely on the quality of the sellers work.
GEEKA YALA UNIVERSITY
View profile
Follow You need to be logged in order to follow users or courses
Sold
2123
Member since
4 year
Number of followers
1446
Documents
56359
Last sold
9 hours ago

3.8

360 reviews

5
179
4
61
3
48
2
17
1
55

Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their tests and reviewed by others who've used these notes.

Didn't get what you expected? Choose another document

No worries! You can instantly pick a different document that better fits what you're looking for.

Pay as you like, start learning right away

No subscription, no commitments. Pay the way you're used to via credit card and download your PDF document instantly.

Student with book image

“Bought, downloaded, and aced it. It really can be that simple.”

Alisha Student

Working on your references?

Create accurate citations in APA, MLA and Harvard with our free citation generator.

Working on your references?

Frequently asked questions