1. A filing representative who submits permit applications to the New
York City Department of Buildings (DOB) is primarily responsible for
which of the following activities?
A. Designing structural systems for buildings
B. Performing construction work on-site
C. Acting as an authorized intermediary for filing and expediting applications
D. Issuing certificates of occupancy
C. Acting as an authorized intermediary for filing and expediting
applications
The filing representative serves as a liaison between applicants, design
professionals, owners, and the DOB by preparing, submitting, and tracking
filings, but does not perform design or inspection functions.
, 2. Under NYC DOB procedures, a filing representative must ensure that
submitted documents are:
A. Prepared only after construction is complete
B. Accurate, complete, and consistent with applicable requirements
C. Signed by the filing representative instead of the applicant
D. Approved by neighboring property owners before submission
B. Accurate, complete, and consistent with applicable requirements
Accuracy and completeness are essential because incomplete or
inconsistent submissions can result in objections, delays, penalties, or
rejection by the DOB.
3. Which party is generally responsible for sealing architectural or
engineering plans submitted to the DOB?
A. Filing representative
B. Property owner
C. Registered design professional
D. General contractor
C. Registered design professional
Only licensed architects and professional engineers are authorized to seal
plans, certifying professional responsibility for the design documents.
4. A filing representative discovers a discrepancy between application
forms and supporting plans. What is the most appropriate action?
,A. Ignore the discrepancy if it appears minor
B. Submit the filing and correct it later if questioned
C. Resolve the inconsistency before submission
D. Remove the conflicting pages without notice
C. Resolve the inconsistency before submission
Resolving discrepancies before filing helps prevent objections, maintains
filing integrity, and supports compliance with DOB procedures.
5. The purpose of a DOB objection is primarily to:
A. Approve an application automatically
B. Identify deficiencies requiring correction before approval
C. Cancel a construction permit permanently
D. Transfer responsibility to the owner
B. Identify deficiencies requiring correction before approval
Objections notify applicants of issues that must be addressed before a
filing can proceed toward approval.
6. Which document generally identifies the legal ownership of a
property?
A. Site safety plan
B. Soil report
C. Deed
D. Daily construction log
, C. Deed
A deed is the legal instrument used to establish and transfer ownership
interests in real property.
7. In NYC construction filings, zoning compliance is important because:
A. Zoning regulations govern land use and development standards
B. Zoning only applies to residential properties
C. Zoning applies after construction is completed
D. Zoning is optional if permits are obtained
A. Zoning regulations govern land use and development standards
Zoning laws regulate building size, use, density, setbacks, and other
development criteria that affect permit eligibility.
8. Which of the following would most likely require DOB review before
work begins?
A. Routine household cleaning
B. Structural alteration of a building
C. Interior decorating without construction
D. Lawn maintenance
B. Structural alteration of a building
Structural changes can affect life safety and building integrity and
therefore typically require DOB approval and permits.