Written by students who passed Immediately available after payment Read online or as PDF Wrong document? Swap it for free 4.6 TrustPilot
logo-home
Exam (elaborations)

CSLB B LICENSE GENERAL CONTRACTOR EXAM WITH QUESTION AND WELL VIRIFIED ANSWERS 2026!!

Rating
-
Sold
-
Pages
44
Grade
A+
Uploaded on
03-07-2026
Written in
2025/2026

CSLB B LICENSE GENERAL CONTRACTOR EXAM WITH QUESTION AND WELL VIRIFIED ANSWERS 2026!!

Institution
CSLB B LICENSE GENERAL CONTRACTOR
Course
CSLB B LICENSE GENERAL CONTRACTOR

Content preview

CSLB B LICENSE GENERAL CONTRACTOR EXAM WITH QUESTION AND
WELL VIRIFIED ANSWERS 2026!!
If unused mortar stiffens due to hydration of cement, what must you do? - ANSWERS✔️💫-Discard the
mortar



What minimum time must you wait before caulking or grouting new tiles? - ANSWERS✔️💫-24-48 Hours



How long should you wait before installing tile on a shower pan? - ANSWERS✔️💫-24 Hours



Unstable dry rock, angular gravel, sandy loam, and cohesive soils having compressive strengths greater
than 0.5 and less than 1.5 tons/sq ft (tsf), are typical examples of: - ANSWERS✔️💫-Type-B Soils



If 65 street lights are fed by a 2275 volt series circuit, what is the voltage across each light? -
ANSWERS✔️💫-35V



In a series circuit, the total voltage is divided equally.



For safety reasons, the maximum simple slope of an excavation, up to 20 ft deep, in Type-B soil is: -
ANSWERS✔️💫-1:1 (45°)



A Pittsburgh joint is used in: - ANSWERS✔️💫-HVAC ductwork



The drain for a pressure relief valve on a water heater should be extended to: - ANSWERS✔️💫-The
outside of the building



What is the minimum slope toward the drain of a shower pan? - ANSWERS✔️💫-1/4" per foot (2%)



What is the diameter of #3 rebar? - ANSWERS✔️💫-3/8"



If a vendor fails to provide an MSDS, you have the right to call: - ANSWERS✔️💫-Cal/OSHA or DOSH

,When installing a door jamb, you need shims at: - ANSWERS✔️💫-Both hinge and strike sides, three on
each side.



Which of the following is used to adhere vinyl floors?



A. Epoxy cement

B. Asphalt mastic

C. Latex primer

D. White glue - ANSWERS✔️💫-Epoxy cement



When do you need bracing for a drywall wall? - ANSWERS✔️💫-Diagonal bracing is needed every 25' for
any drywall wall.



How should you clear the roots from a construction site? - ANSWERS✔️💫-Clear roots to 12" below
grade.



Dividing watts by amps gives you: - ANSWERS✔️💫-Volts



The most frequent on-the-job roofing accidents are: - ANSWERS✔️💫-Falls



Which of the following is NOT a type of wood block flooring?



A. Parquet

B. Wood Mosaic

C. Wood Tile

D. All of the above. - ANSWERS✔️💫-Wood tile



Lightweight concrete is best used for:

,A. Curb and Gutter

B. Second floor decking

C. First floor slab on grade

D. Footings - ANSWERS✔️💫-Second floor decking



The tool used to carry grout needed to patch a small hole is a:



A. Hawk

B. Poling board

C. Spot board

D. Mason's scutch - ANSWERS✔️💫-Spot Board



Which pipe is NOT appropriate for industrial wastes?



A. Cast iron

B. Schedule 40 ABS DWV

C. Extra strength vitrified clay

D. Copper - ANSWERS✔️💫-Copper



Where do you need a fire wall?



A. Between a living room and a bedroom

B. Between a bedroom and a bathroom

C. Between a kitchen and a bath

D. A separation wall between a dwelling and an attachment - ANSWERS✔️💫-A separation wall between
a dwelling and an attachment.

, What is the minimum clearance between rough ground and untreated subfloor joists? - ANSWERS✔️💫-
18 inches



Who may remove asbestos? - ANSWERS✔️💫-Contractor with Asbestos Certification on license.



Which of the following is NOT likely to be found in significant proportions in granular soil?



A. Gravel

B. Sand

C. Silt

D. Clay - ANSWERS✔️💫-Clay



Stiles and rails are used on which of the following?



A. Furred walls

B. Roofs

C. Windows

D. Slabs - ANSWERS✔️💫-Windows.



A stile is the vertical edges of the window and the rails are the bottom and top.



What does a high slump test indicate? - ANSWERS✔️💫-Too much water.



Metal concrete forms should be?



A. Oiled

B. Watered

C. Placed against gravel

D. Discarded after each use - ANSWERS✔️💫-Oiled

Written for

Institution
CSLB B LICENSE GENERAL CONTRACTOR
Course
CSLB B LICENSE GENERAL CONTRACTOR

Document information

Uploaded on
July 3, 2026
Number of pages
44
Written in
2025/2026
Type
Exam (elaborations)
Contains
Questions & answers

Subjects

$25.49
Get access to the full document:

Wrong document? Swap it for free Within 14 days of purchase and before downloading, you can choose a different document. You can simply spend the amount again.
Written by students who passed
Immediately available after payment
Read online or as PDF

Get to know the seller
Seller avatar
Tutordanty01

Get to know the seller

Seller avatar
Tutordanty01 Chamberlian School of Nursing
View profile
Follow You need to be logged in order to follow users or courses
Sold
-
Member since
1 week
Number of followers
0
Documents
142
Last sold
-

0.0

0 reviews

5
0
4
0
3
0
2
0
1
0

Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their tests and reviewed by others who've used these notes.

Didn't get what you expected? Choose another document

No worries! You can instantly pick a different document that better fits what you're looking for.

Pay as you like, start learning right away

No subscription, no commitments. Pay the way you're used to via credit card and download your PDF document instantly.

Student with book image

“Bought, downloaded, and aced it. It really can be that simple.”

Alisha Student

Working on your references?

Create accurate citations in APA, MLA and Harvard with our free citation generator.

Working on your references?

Frequently asked questions