CTS-I Exam Questions and Answers with
Verified Solutions | Latest Updated 2026
Before developing a project plan, it have a clear understanding of the scope of
is important to (CH3) work
A scope statement should include: Both in-scope and out-of-scope items
(CH3)
The key elements of a project the client's need
should
be driven by: (CH3)
What is a dependency within a A task that cannot begin before another
project task schedule? (CH3) task has
been completed
Project budget refers to what? The amount of labor and materials the
(CH3) project
manager has allocated to complete the
project.
A primary reason for attending Identify changes to the original design that
construction meetings is to: (CH3) will
affect the av installation.
,In the event of a change in the RFI
placement of air-conditioning ducts
in a boardroom, which of the
following documents should the
AV
integrator submit first? (CH3)
Which of the following documents RFC
should an AV integrator submit in
the
event that a manufacturer has
discontinued a projector model?
(CH3)
The ANSI/INFOCOMM 2M-2010 project communication that needs to take
Standard Guide for AV Systems place on
Design and Coordination Process a given project.
lays out a procedure for
determining
the_________ (CH3)
After which of the following System closeout activities are completed
activities
is an AV project completed? (CH3)
Which set of drawings should you Mechanical Drawings
reference to view the ductwork
that
goes through the building?
Which set of drawings should you Electrical Drawings
reference to locate a power outlet
for a video display?
, Which of the following must the Details of the system as finally installed
as-
built drawings show?
OFOI Owner Furnished Owner Installed (you will
not
need to install)
What does an elevation flag on a Related elevation drawings
plan drawing indicate?
What type of drawing would you Detail Drawing
use
to find out exactly how the
projector
should be mounted to the ceiling?
Which of the following is the AV • Install sprinkler system
team • Run cables and install mounts - Answer
likely to perform during new • Mount drop ceiling
construction? • Build the firewall
What is the primary reason an AV ID changes that affect the AV installation
installer should attend weekly
construction meetings?
Which of the following is the most Avoiding disruptions to your client's
important consideration during the business
installation of AV systems in a
client-
occupied space?
Verified Solutions | Latest Updated 2026
Before developing a project plan, it have a clear understanding of the scope of
is important to (CH3) work
A scope statement should include: Both in-scope and out-of-scope items
(CH3)
The key elements of a project the client's need
should
be driven by: (CH3)
What is a dependency within a A task that cannot begin before another
project task schedule? (CH3) task has
been completed
Project budget refers to what? The amount of labor and materials the
(CH3) project
manager has allocated to complete the
project.
A primary reason for attending Identify changes to the original design that
construction meetings is to: (CH3) will
affect the av installation.
,In the event of a change in the RFI
placement of air-conditioning ducts
in a boardroom, which of the
following documents should the
AV
integrator submit first? (CH3)
Which of the following documents RFC
should an AV integrator submit in
the
event that a manufacturer has
discontinued a projector model?
(CH3)
The ANSI/INFOCOMM 2M-2010 project communication that needs to take
Standard Guide for AV Systems place on
Design and Coordination Process a given project.
lays out a procedure for
determining
the_________ (CH3)
After which of the following System closeout activities are completed
activities
is an AV project completed? (CH3)
Which set of drawings should you Mechanical Drawings
reference to view the ductwork
that
goes through the building?
Which set of drawings should you Electrical Drawings
reference to locate a power outlet
for a video display?
, Which of the following must the Details of the system as finally installed
as-
built drawings show?
OFOI Owner Furnished Owner Installed (you will
not
need to install)
What does an elevation flag on a Related elevation drawings
plan drawing indicate?
What type of drawing would you Detail Drawing
use
to find out exactly how the
projector
should be mounted to the ceiling?
Which of the following is the AV • Install sprinkler system
team • Run cables and install mounts - Answer
likely to perform during new • Mount drop ceiling
construction? • Build the firewall
What is the primary reason an AV ID changes that affect the AV installation
installer should attend weekly
construction meetings?
Which of the following is the most Avoiding disruptions to your client's
important consideration during the business
installation of AV systems in a
client-
occupied space?