1. What is the minimum period an Owner Builder must reside in the home after receiving
cx cx cx cx cx cx cx cx cx cx cx cx cx cx cx cx
their permit? cx
a) 6 months
cx cx
b) 12 months
cx cx
c) 18 months
cx cx
d) 24 months
cx cx
Answer: b) 12 months cx cx cx
2. Under the Homeowner Protection Act (HPA), what is the maximum number of new sing
cx cx cx cx cx cx cx cx cx cx cx cx cx cx
le-family dwellings an individual can build as an Owner Builder in a five-year period?
cx cx cx cx cx cx cx cx cx cx cx cx cx
a) 1
cx
b) 2
cx
c) 3
cx
d) Unlimited
cx
Answer: a) 1 cx cx
3. Which form must be submitted to the BC Housing Licensing and Consumer Services to
cx cx cx cx cx cx cx cx cx cx cx cx cx cx cx
apply for an Owner Builder Authorization?
cx cx cx cx cx
a) Form 8
cx cx
b) Form 12
cx cx
c) Form 3.1
cx cx
d) Schedule A
cx cx
Answer: c) Form 3.1 cx cx cx
,4. If an Owner Builder sells the home within the mandatory occupancy period, what is the
cx cx cx cx cx cx cx cx cx cx cx cx cx cx cx cx
required monetary penalty? cx cx
a) A flat fee of $5,000
cx cx cx cx cx
b) 100% of the permit fees
cx cx cx cx cx
c) 100% of the net selling price or assessed value, whichever is greater
cx cx cx cx cx cx cx cx cx cx cx cx
d) 50% of the construction cost
cx cx cx cx cx
Answer: c) 100% of the net selling price or assessed value, whichever is greater
cx cx cx cx cx cx cx cx cx cx cx cx cx
5. Who is primarily responsible for ensuring that the construction site complies with the
cx cx cx cx cx cx cx cx cx cx cx cx cx cx
Workers Compensation Act in BC? cx cx cx cx
a) The general contractor
cx cx cx
b) The municipal building inspector
cx cx cx cx
c) The Owner Builder
cx cx cx
d) The architect
cx cx
Answer: c) The Owner Builder cx cx cx cx
6. For a BC Owner Builder project, what is the minimum distance from the property line re
cx cx cx cx cx cx cx cx cx cx cx cx cx cx cx cx
quired for a new well under the current 2026 Groundwater Protection Standards?
cx cx cx cx cx cx cx cx cx cx cx
a) 15 meters
cx cx
b) 30 meters
cx cx
c) 50 meters
cx cx
d) 100 meters
cx cx
Answer: b) 30 meters cx cx cx
7. The BC Building Code (2024 Revision, effective 2026) requires that all exterior wall asse
cx cx cx cx cx cx cx cx cx cx cx cx cx cx
mblies must have a continuous air barrier. What is the maximum allowable air leakage rat
cx cx cx cx cx cx cx cx cx cx cx cx cx cx
e for a typical wood-frame wall assembly?
cx cx cx cx cx cx
a) 0.5 L/s/m² at 75 Pa
cx cx cx cx cx
b) 2.0 L/s/m² at 50 Pa
cx cx cx cx cx
c) 1.0 L/s/m² at 50 Pa
cx cx cx cx cx
d) 5.0 L/s/m² at 75 Pa
cx cx cx cx cx
Answer: b) 2.0 L/s/m² at 50 Pa cx cx cx cx cx cx
8. Which of the following best describes the Owner Builder's liability regarding "latent def
cx cx cx cx cx cx cx cx cx cx cx cx cx
ects" after selling the home?
cx cx cx cx
,a) The Owner Builder is only liable for 2 years after sale.
cx cx cx cx cx cx cx cx cx cx cx
b) The Owner Builder has no liability if a home inspector cleared the home.
cx cx cx cx cx cx cx cx cx cx cx cx cx
c) The Owner Builder can be liable for up to 10 years for significant structural defects.
cx cx cx cx cx cx cx cx cx cx cx cx cx cx cx
d) The liability is transferred to the new buyer upon closing.
cx cx cx cx cx cx cx cx cx cx
Answer: c) The Owner Builder can be liable for up to 10 years for significant structural def
cx cx cx cx cx cx cx cx cx cx cx cx cx cx cx cx
ects.
9. In the 2026/2027 BC building code updates, what is the new requirement for roof snow
cx cx cx cx cx cx cx cx cx cx cx cx cx cx cx cx
load calculations in the Interior Plateau region?
cx cx cx cx cx cx
a) 1.0 kPa
cx cx
b) 1.5 kPa
cx cx
c) 2.5 kPa
cx cx
d) 4.0 kPa
cx cx
Answer: c) 2.5 kPa cx cx cx
10. What is the fee for the Owner Builder Authorization application as of 2026?
cx cx cx cx cx cx cx cx cx cx cx cx cx
a) $150
cx
b) $250
cx
c) $350
cx
d) $500
cx
Answer: b) $250 cx cx
11. For an Owner Builder, which of the following is NOT a requirement for obtaining a bui
cx cx cx cx cx cx cx cx cx cx cx cx cx cx cx cx
lding permit from the municipality?
cx cx cx cx
a) Proof of property insurance
cx cx cx cx
b) Completed Owner Builder Authorization
cx cx cx cx
c) Detailed construction drawings stamped by a registered professional
cx cx cx cx cx cx cx cx
d) A letter of credit for $50,000
cx cx cx cx cx cx
Answer: d) A letter of credit for $50,000
cx cx cx cx cx cx cx
12. If the Owner Builder hires subcontractors, who is responsible for withholding and remi
cx cx cx cx cx cx cx cx cx cx cx cx cx
tting CPP/EI contributions?
cx cx
a) The Owner Builder, if the total payroll exceeds $10,000
cx cx cx cx cx cx cx cx cx
b) The subcontractors themselves
cx cx cx
, c) The Owner Builder is always exempt from this
cx cx cx cx cx cx cx cx
d) The municipality
cx cx
Answer: a) The Owner Builder, if the total payroll exceeds $10,000
cx cx cx cx cx cx cx cx cx cx
13. What is the maximum allowable depth for an unsupported excavation under the BC O
cx cx cx cx cx cx cx cx cx cx cx cx cx cx
HS regulations for 2026?
cx cx cx
a) 1.0 meters
cx cx
b) 1.2 meters
cx cx
c) 1.5 meters
cx cx
d) 2.0 meters
cx cx
Answer: b) 1.2 meters cx cx cx
14. Which of the following correctly describes the "Builder Lien Act" as it applies to Owne
cx cx cx cx cx cx cx cx cx cx cx cx cx cx cx
r Builders?
cx
a) Owner Builders are immune from liens.
cx cx cx cx cx cx
b) Any subcontractor can place a lien on the property for unpaid work.
cx cx cx cx cx cx cx cx cx cx cx cx
c) Only general contractors can place liens.
cx cx cx cx cx cx
d) Liens are only valid for 30 days.
cx cx cx cx cx cx cx
Answer: b) Any subcontractor can place a lien on the property for unpaid work.
cx cx cx cx cx cx cx cx cx cx cx cx cx
15. Under the new 2026 Energy Step Code requirements, what is the minimum thermal res
cx cx cx cx cx cx cx cx cx cx cx cx cx cx
istance (R-value) required for an above-grade wall in Zone 5 (Northern BC)?
cx cx cx cx cx cx cx cx cx cx cx
a) R-22 cx
b) R-28 cx
c) R-32 cx
d) R-40 cx
Answer: c) R-32 cx cx
16. An Owner Builder wants to build a secondary suite in their new home. What additional
cx cx cx cx cx cx cx cx cx cx cx cx cx cx cx
requirement must they meet?
cx cx cx cx
a) The suite must be rented within 6 months.
cx cx cx cx cx cx cx cx
b) The suite must have a separate entrance and be at least 50 sq. meters.
cx cx cx cx cx cx cx cx cx cx cx cx cx cx
c) The Owner Builder must apply for a separate Owner Builder authorization for the suite.
cx cx cx cx cx cx cx cx cx cx cx cx cx cx
d) The suite must meet the fire separation requirements of the BC Building Code.
cx cx cx cx cx cx cx cx cx cx cx cx cx