Written by students who passed Immediately available after payment Read online or as PDF Wrong document? Swap it for free 4.6 TrustPilot
logo-home
Document preview thumbnail
Preview 4 out of 173 pages
Exam (elaborations)

CMIT EXAM AND PRACTICE EXAM NEWEST 2026 TEST BANK| CONSTRUCTION MANAGER-IN TRAINING (CMAA/ CMCI) CERTIFICATION EXAM PREP WITH COMPLETE 650 REAL EXAM QUESTIONS AND CORRECT VERIFIED ANSWERS| ALREADY GRADED A+ (MOST RECENT!!)

Document preview thumbnail
Preview 4 out of 173 pages

CMIT EXAM AND PRACTICE EXAM NEWEST 2026 TEST BANK| CONSTRUCTION MANAGER-IN TRAINING (CMAA/ CMCI) CERTIFICATION EXAM PREP WITH COMPLETE 650 REAL EXAM QUESTIONS AND CORRECT VERIFIED ANSWERS| ALREADY GRADED A+ (MOST RECENT!!)

Content preview

1|Page


CMIT EXAM AND PRACTICE EXAM NEWEST 2026
TEST BANK| CONSTRUCTION MANAGER-IN-
TRAINING (CMAA/ CMCI) CERTIFICATION EXAM
PREP WITH COMPLETE 650 REAL EXAM QUESTIONS
AND CORRECT VERIFIED ANSWERS| ALREADY
GRADED A+ (MOST RECENT!!)


A legal relationship by which one party is empowered and obligated to
act on behalf of another party is called:
A) An agreement
B) Agency
C) Addenda
D) A contract - Correct Answer - B) Agency


A 5D BIM model incorporates which project attribute?
A) Schedule
B) Quality
C) Phasing
D) Cost - Correct Answer - D) Cost


What term is used to describe a quality process for achieving, verifying,
and documenting the performance of facilities and systems?
A) ISO
B) Lean Six Sigma
C) Commissioning

,2|Page


D) Constructibility - Correct Answer - C) Commissioning


A cost plus fixed fee contract is what type of contract?
A) Cost reimbursement
B) Lump sum
C) Time & material
D) Unit price - Correct Answer - A) Cost reimbursement


A project management system that utilizes a periodic consistent
measurement of work performed in terms of budget is known as a
____________ system?
A) CPM
B) ISO
C) Earned value
D) Value engineering - Correct Answer - C) Earned value


The Leadership in Energy and Environmental Design green building
rating system has ________ rigorous levels of attainment.
A) two
B) three
C) four
D) five - Correct Answer - C) four


An amount of money stipulated in the contract that a contractor must
pay due to delays in completing the project is called:
A) Retainage

,3|Page


B) Liquidated damages
C) Incentive fee
D) Retention - Correct Answer - B) Liquidated damages


The overlapping of the construction phase with the design phase of a
project is called:
A) Design-build
B) Critical path method
C) Multiple prime contracting
D) Fast track - Correct Answer - D) Fast track


What is the management technique for subdividing the project into its
component elements called?
A) WBS
B) BIM
C) ISO
D) CPM - Correct Answer - A) WBS


The value of a cost found by discounting future cash flows to the base
time is called:
A) Future cost
B) Earned value
C) Present value
D) Job cost - Correct Answer - C) Present value

, 4|Page


Under what management concept is reporting of a direct relationship
established between percent complete of an activity and the budget for
that activity?
A) Pert schedule
B) Earned value
C) BIM 4D
D) Benefit cost ratio - Correct Answer - B) Earned value


What is the term sometimes used to describe the standard language of
the full set of contract documents?
A) Special provisions
B) MasterFormat
C) Boiler plate
D) Contract agreement - Correct Answer - C) Boiler plate


Which of the following is not considered a direct project cost?
A) Field office trailer
B) Project labor
C) Project equipment
D) Trade subcontracts - Correct Answer - A) Field office trailer


What is the form of estimating that is derived from statistical correlation
of historic system costs with performance and/or physical attributes of
the system?
A) ROM estimate
B) Range estimate

Document information

Uploaded on
June 30, 2026
Number of pages
173
Written in
2025/2026
Type
Exam (elaborations)
Contains
Questions & answers
$20.49

Wrong document? Swap it for free Within 14 days of purchase and before downloading, you can choose a different document. You can simply spend the amount again.
Written by students who passed
Immediately available after payment
Read online or as PDF

Seller avatar
Reputation scores are based on the amount of documents a seller has sold for a fee and the reviews they have received for those documents. There are three levels: Bronze, Silver and Gold. The better the reputation, the more your can rely on the quality of the sellers work.
ASSIGNMENT7
3.9
(173)
Sold
939
Followers
29
Items
3845
Last sold
1 day ago


Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their tests and reviewed by others who've used these notes.

Didn't get what you expected? Choose another document

No worries! You can instantly pick a different document that better fits what you're looking for.

Pay as you like, start learning right away

No subscription, no commitments. Pay the way you're used to via credit card and download your PDF document instantly.

Student with book image

“Bought, downloaded, and aced it. It really can be that simple.”

Alisha Student

Working on your references?

Create accurate citations in APA, MLA and Harvard with our free citation generator.

Working on your references?

Frequently asked questions